Professional Documents
Culture Documents
Furniture, Fixtures ok take estimate
Furniture, Fixtures ok take estimate
Furniture, Fixtures ok take estimate
(ABSTRACT SHEET)
Name of Work: A.D.P # 06, Construction of Circuit House@ Kotri Taluka Kotri, District Jamshoro (First Floor)
(Revenue Component Furniture Fixtures & Electrical Appliances).
Non-Schedule Items.
1 Sofa Set Seven seater wooden frame seat and back cushion with Ist:
Quality Foam covered with best quality cloth.
Ra 5.000
(Million)
EXECUTIVE ENGINEER
BUILDINGS DIVISION
JAMSHORO
(GENERAL ABSTRACT)
Name of Work: ESTIMATE FOR THE WORK OF CONSTRUCTION OF GUARD
ROOM & RAISING OF COMPOUND WALL I/C EXTERNAL
DEVELOPMENT OF D.C.HOUSE BADIN (SUPPLY FURNITURE
& FIXTURE FOR D.C. HOUSE ) (PSDP No: 176, 2012-2013) .
S.# Qty: Item of Work Total Amount.
G-Total #REF!
ENGINEER ENGINEER
BUILDINGS DIVISION
BADIN
Page 1
(ABSTRACT SHEET)
Name of Work: ESTIMATE FOR THE WORK OF SUPPLY FURNITURE & FIXTURE FOR D.C. HOUSE
BADIN ( (PSDP No:176, 2012-2013) .
Non-Schedule Items.
1 Sofa Set Seven seater wooden frame seat and back cushion with Ist: Quality
Foam covered with best quality cloth.
12 Single bed size 3.50'x6.50' 02 Nos: new Design with 6" inch moster moulty
foam, side table 01 No: i/c dressing table 01 No: matching of single bed with
best quality matt polish finished.
EXECUTIVE ENGINEER
BUILDINGS DIVISION
BADIN
FACE SHEET
MAJOR HEAD.
DEPARTMENT HEAD. A.D.P # 06, Construction of Circuit House@ Kotri Taluka Kotri,
District Jamshoro (First Floor) (Revenue Component Furniture
Fixtures & Electrical Appliances).
(ABSTRACT SHEET)
Name of Work: A.D.P # 06, Construction of Circuit House@ Kotri Taluka Kotri, District Jamshoro (First Floor)
(Revenue Component Furniture Fixtures & Electrical Appliances).
Non-Schedule Items.
1 Sofa Set Seven seater wooden frame seat and back cushion with Ist:
Quality Foam covered with best quality cloth.
Grand Total Ra
Page 3
Ra
EXECUTIVE ENGINEER
BUILDINGS DIVISION
JAMSHORO
Page 4
ro (First Floor)
AMOUNT
200000
60000
250000
500000
45000
80000
360000
80000
80000
500000
200000
Page 5
AMOUNT
150000
70000
600000
180000
40000
210000
360000
150000
200000
450000
4765000
162010
72990
5000000
Page 6
AMOUNT
5.000
(Million)
Page 1
SCHEDULE - B
Name of Work: A.D.P # 06, Construction of Circuit House@ Kotri Taluka Kotri, District Jamshoro (First
Floor) (Revenue Component Furniture Fixtures & Electrical Appliances).
Non-Schedule Items.
1 Sofa Set Seven seater wooden frame seat and back cushion with Ist:
Quality Foam covered with best quality cloth.
1 Any error or omission in the schedule 'B' will be Governed by the Schedule of rates in forces.
2 No permission shall be allowed on Item based on market rates and sanctioned by the competant authority out side the schedule of
rates in forces.
3 Nothing shall be paid for cortage of any materials what so ever brought at the site of work I/c materials corted from Government
stores.
4 The matertials for use in the work or finished product can be got tested from an approval leboratory at the direction of Executive
Engineer Buildings Division Badin or his representative in all expensis with connection shall be borne by the contractor or re-
imbrusement or claim against the Government on this account.