COMMENT RESPONSE SHEET


PROJECT TITLE: Zuluf Hydrocarbon Processing Facilities & Utilities and Water Injection ISSUE PURPOSE: *RETUN CODES:
CONTRACT NUMBER: (OOK) 6601000117 (IK) 6601000094 COMPANY TRN NO. : A: Accepted without comment
TRANSMIATTAL NUMBER: SA RETURN CODE*: B: Accepted with comments
DOC REVISION: 0 R: Returned with comments
DOC. NUMBER : V-3130-MC2-A-1021 N: Rejected
DRAWING/DOCUMNET TITLE: F: Not subject for review

METHOD STATEMENT & JSA FOR SCAFFOLDING WORKS

COMPANY
COMPANY Originator
No. Document No. Rev. Section Page COMPANY Comments CONTRACTOR Response Status/Remarks
(Initial)
[Open/Closed]
General
V-3130-MC2-A-1021 0 Contractor must submitted the Scaffolding
dismantling plan separately
General
confined space
Title of the JSA- Scaffold erector why include removed
confined space - confined space shall be separate
General

Action By- Site engineer, Site supervsior


2.3 Highlighted
Include the highlighted hazard
• Strain
• Back injuries
• Muscular injury
2.5

Please decribe individual potential and include Described individual


corrective control measures potentials and control
• Struck by measures
• Physical injuries
• Property damage
3.3
inclided
Include Human Machine interfernce reuirements to
highlighted in the control measures
4.2
removed
Remove safety violation
7.3 replaced
Replace - Sturctural collapse of the Scaffold

Saudi Aramco: Company General Use


#
#

Saudi Aramco: Company General Use


#