This document outlines productivity rates for various construction tasks. It includes rates for site work like excavation and backfilling, concrete work like formwork, shuttering, reinforcement and casting, masonry tasks such as blockwork, structural steel erection and cladding, plastering, tiling, plumbing installations and fixtures, electrical work, and finishes. Rates are provided for the number of workers and time required to complete each task per unit of measurement like square meters, running meters, or numbers.
This document outlines productivity rates for various construction tasks. It includes rates for site work like excavation and backfilling, concrete work like formwork, shuttering, reinforcement and casting, masonry tasks such as blockwork, structural steel erection and cladding, plastering, tiling, plumbing installations and fixtures, electrical work, and finishes. Rates are provided for the number of workers and time required to complete each task per unit of measurement like square meters, running meters, or numbers.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
This document outlines productivity rates for various construction tasks. It includes rates for site work like excavation and backfilling, concrete work like formwork, shuttering, reinforcement and casting, masonry tasks such as blockwork, structural steel erection and cladding, plastering, tiling, plumbing installations and fixtures, electrical work, and finishes. Rates are provided for the number of workers and time required to complete each task per unit of measurement like square meters, running meters, or numbers.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
b. Site Cleaning c. Fencing d. Fixing of Light Weight Scaffolding Excavation a. Soft Soil (Hand Tools) b. Hard Soil (Hand Tools) c. Soft Soil d. Hard Soil e. Soft Soil f. Hard Soil Backfilling a. Filling in foundation, pinth b. Level, Compaction c. Spreading 200mm layer (Subkha, Road Base) d. Compaction 200mm layer (Subkha, Road Base) Interlock Paving a. Compaction / Levelling b. Spreading Sand and Brushing c. Laying Tiles d. Filling, Compaction Precast Kerb Stone a. Excavation & Blinding for Curbstone b. Laying Kerbs c. Karb stone on curved lines d. Hunching Shuttering (with supports) a. Shutt. of Blinding b. Shutt. of Footing (Plywood) c. Shutt. of Footing (Plates) d. Shutt. of Slub Column e. Shutt. of Strap / Tie Beam (Plywood) f. Shutt. of Strap / Tie Beam (Plates) g. Shutt. of Wall h. Shutt. of Column 20x20 i. Shutt. of Column 20x40 j. Shutt. of Beam with support k. Shutt. of Roof Slab l. Shutt. of Lintel m. Shutt. of Copying Beam 20x20cm n. Shutt. of Parapet o. Shutt. of Arch Lintel p. Expansion Joints / Ground Slab s. Shutt. of Beam & Column for 8m to 12m high PAVING & SURFACING CONCRETE FORMWORK 01 GENERAL REQUIREMENT PRODUCTIVITY RATES SITE FACILITIES 02 SITE WORK EARTHWORK 03 CONCRETE u. Shutt. of Staircase t. De-shuttering Works Reinforcement (Lightening for Cut & Bend Steel) a. Reinf. of Footing b. Reinf. of Slub Column c. Reinf. of Strap Beam d. Reinf. of Tie Beam e. Reinf. of Wall f. Reinf. of Column g. Reinf. of Beam h. Reinf. of Solid Slab i. Reinf. of Lintel j. Reinf. Copying Beam 20x20cm k. Reinf. of Parapet l. Reinf. of Arch Lintel l. Reinf. of Staircase Mesh Reinforcement a. Mesh Reinforcement Casting Concreting (Readymix) a. Cast. Blinding 5cm b. Cast. Blinding 10cm c. Cast. Blinding 5cm, 10cm d. Cast. of Footing e. Cast. of Footing (Pump) f. Cast. of Strap / Tie Beam g. Cast. of Tie Beam (Pump) h. Cast. of Ground Floor Slab 10cm i. Cast. of Ground Floor Slab 15cm j. Cast. of Ground Floor Slab 20cm k. Cast. of Wall l. Cast. of Column m. Cast. of Beam of Slab n. Cast. of Roof Slab o. Cast. of Lintel p. Cast. of Copying Beam 20x20cm (up to2.5m) q. Cast. of Copying Beam 20x20cm (above 2.5m) r. Cast. of Parapet s. Cast. of Arch Lintel u. Casting of Neck Column v. Casting of Staircase Solid Block a. 200mm Solid Block up to 2.5m Height Hollow Block a. 100mm Hollow Block up to 2.5m Height b. 100mm Hollow Block - 2.5m to 6m Height c. 150mm Hollow Block up to 2.5m Height d. 200mm Hollow Block up to 2.5m Height e. 200mm Hollow Block - 2.5m to 6m Height f. 200mm Block Work above 6m Height
REINFORCEMENT PLACE CONCRETE 04 MASONRY g. 200mm Block Work including pointing Claustra Block a. Claustra Block 200x200 b. Claustra Block 150x150 Steel Structure a. Painting for steel structure columns b. Painting for steel structure rafters c. Erection of steel structure main frame ( Eave Height up to 6m span up to 25m) d. Erection of steel structure main frame ( Eave Height up to 6m span up to 36m) e. Fixing of Single Skin Sheet (Roof) f. Fixing of Single Skin Sheet (Walls) g. Single skin with Fibre Glass Insulation (Roof) h. Single skin with Fibre Glass Insulation (Wall) i. Sandwich Panels (Roof) j. Sandwich Panels (Wall) k. Corner Fisshing & Trims, etc l. 4m x 4m Double Sliding Door m. Wall or Roof opening + Frames (1.0mx1.0m) n. Ridge Ventilator o. Gutter / Down Spout Polythene Sheets a. Polythene under footings b. Polythene under slab c. Polythene under tie beam Bitumin Paint a. Cold Bituminous Painting b. Hot Bituminous Painting Bituminous Membranes a. Bituminous Membrane + Protection Board Construction Joints a. Flexel Board b. Sealant Internal Plaster a. Ceiling Plaster b. Wall Plaster up to 3m Height c. Wall Plaster 3m to 6m Height d. Wall Plaster above 6m Height e. Fixing of Plaster Mesh f. Fixing of Corner Beed External Plaster a. Wall Plaster up to 3m Height b. Wall Plaster 3m to 6m Height c. Wall Plaster above 6m Height Mosaic a. Floor Mosaic Tiles b. Mosaic Skirting c. Mosaic Steps (Riser & Tread) d. Mosaic Polishing Ceramic STRUCTURAL STEEL PLASTER 05 METALS 07 MOISTURE THERMAL CONTROL 09 FINISHES a. Fixing of Ceramic Wall Tiles (Glur Type) b. Grouting of Ceramic Wall Tiles c. Fixing of Ceramic Wall Tiles (Cement Monar Type) d. Fixing of Ceramic Floor Tiles 20x20cm e. Fixing of Ceramic Floor Tiles 30x30cm f. Fixing of Ceramic Floor Tiles 50x50cm g. Grouting of Ceramic Floor Tiles h. Ceramic Skirting PVC Tiles a. PVC Tiles b. PVC Skirting Marble a. Marble Wall b. Marble Floor c. Marble Skirting d. Marble Steps (Riser & Treads) Floor Screed (50mm) a. Floor Screed (50mm) b. Cement Skirting Wooden Skirting a. Timber Threshold a. Threshold False Ceiling a. False Ceiling - Suspended Type Dry Wall Partition a. Dry Wall Partition Tyrolene (Cullamix) a. Tyrolene over plastered surface b. Tyrolene over block wall Normal Paint (Emulsion Oil) a. Primer c. Stucco (Putty) d. Emulsion Paint e. Oil Paint Epoxy Painting a. Epoxy Painting Copper & PVC Pipes a. 1/2" to 1" Copper Pipe (Hot water) b. 1/2" to 1 1/2" PVC Pipe c. 2" to 3" PVC Pipe d. 4" to 6" PVC Pipe Plumbing Fixtures a. Shower Tray b. Kitchen Sink c. Urinals + Partition d. Wash Basin e. W/C Asian f. W/C Western WALL COVERINGS PLUMBING INSTALLATIONS PLUMBING FIXTURES 15 MECHANICAL TILING SCREED g. Bidet h. Booster Pump i. Manhole 60cm to 90cm Plumbing Appliances a. Water Heater Race Ways a. Conduits b. Trunking Conductors & Grounding a. Laying Cables Wiring a. Wiring Boards a. D.B's b. M.D.B's C=Carpenter, M=Mason, P=Painter, SF=Steel Fitter, E=Erector, H=Helper, Po=Polisher, Elec=El, Pl=Plumber One Day is considered as 8 working hours. 16 ELECTRICAL BOARDS PLUMBING APPLIANCES RACE WAYS CONDUCTORS & GROUNDING WIRING Rev. 01 02/11/05 (Duration x 2H) Day - (Dhs. Contract value/ 50,000) Helper-Day Day 1 1C + 2H + 1P Rm/Day 50 1C + 1H M2/Day 70 1 H Hand Tools M3/Day 3 1 H Hand Tools M3/Day 1 - Shovel M3/Hr 40 - Shovel M3/Hr 25 - JCB M3/Hr 20 - J.C.B. M3/Hr 10 - Shovel M3/Hr 30 1 H Roller Compr. M2/Day 100 - Shovel M2/Hr 100 1 H Roller Compr. M2/Day 200 2 H Roller Compr. M2/Day 200 2 H M2/Day 200 1 M + 2 H M2/Day 60 1 H Plate Compr. M2/Day 150 1 H R.M/Day 10 1 M + 2 H R.M/Day 35 1 M + 1 H R.M/Day 15 1 M + 1 H R.M/Hr 20 1 C + 1 H M2/Day 35 1 C + 1 H M2/Day 15 1 C + 1 H M2/Day 20 1 C + 1 H M2/Day 5 1 C + 1 H M2/Day 12 1 C + 1 H M2/Day 20 1 C + 1 H M2/Day 14 1 C + 1 H M2/Day 10 1 C + 1 H M2/Day 10 1 C + 1 H M2/Day 12 1 C + 2 H M2/Day 10 1 C + 1 H M2/Day 6 1 C + 1 H M2/Day 6 1 C + 1 H M2/Day 12 1 C + 1 H M2/Day 6 1 C + 1 H L.M/Day 70 1 C + 1 H M2/Day 8 1 C + 1 H M2/Day 12 20% of Shuttering Works 1 SF + 1 H KG/Day 400 1 SF + 1 H KG/Day 250 1 SF + 1 H KG/Day 300 1 SF + 1 H KG/Day 350 1 SF + 1 H KG/Day 400 1 SF + 1 H KG/Day 300 1 SF + 1 H KG/Day 300 1 SF + 1 H KG/Day 300 1 SF + 1 H KG/Day 150 1 SF + 1 H KG/Day 200 1 SF + 1 H KG/Day 300 1 SF + 1 H KG/Day 150 1 SF + 1 H KG/Day 250 1 SF + 2 H M2/Day 300 1 M + 2 H M2/Day 30 1 M + 2 H M2/Day 40 2 M + 4 H Pump M2/Day 250 2 M + 4 H M3/Day 40 3 M + 8 H Pump M3/Day 120 1 M + 6 H M3/Day 20 2 M + 6 H Pump M3/Day 50 3 M + 5 H M3/Day 30 3 M + 5 H M3/Day 45 3 M + 5 H M3/Day 50 1 M + 1 C + 3 H Pump M3/Day 40 1 M + 4 H M3/Day 4 1 M + 4 H M3/Day 12 2 M + 2 C + 5 H Pump M3/Day 50 1 M + 2 H Nos./Hr 4 1 C + 5 H RM/Day 150 1 C + 5 H RM/Day 60 1 M + 1 C + 4 H Pump M3/Day 10 1 M + 3 H M3/Day 5 1 M + 3 H M3/Day 4 1 C + 1 H M3/Day 12 1 M + 2 H Nos./Day 140 1 M + 1 H Nos./Day 150 1 M + 2 H Nos./Day 140 1 M + 1 H Nos./Day 150 1 M + 1 H Nos./Day 180 1 M + 2 H Nos./Day 140 1 M + 2 H Nos./Day 100 1 M + 1 H Nos./Day 120 1 M + 1 H M2/Day 10 1 M + 1 H M2/Day 8 1 P + 1 H M2/Day/ Coat 50 1 P + 1 H M2/Day/ Coat 40 3 E + 3 H M2/Day 250 3 E + 3 H M2/Day 175 3 E + 3 H M2/Day 350 3 E + 3 H M2/Day 150 3 E + 3 H M2/Day 250 3 E + 3 H M2/Day 100 3 E + 3 H M2/Day 250 3 E + 3 H M2/Day 150 1 E + 3 H Rm/Day 80 1 E + 3 H No. 1 1 E + 3 H No. 8 1 E + 3 H No./Day 6 1 E + 3 H Rm/Day 70 1 C + 1 H M2/Day 200 1 C + 1 H M2/Day 1000 1 H Rm/Day 200 1 H M2/Day/ Coat 100 2 H M2/Day/ Coat 60 1 C + 1 H M2/Day 30 1 C + 1 H RM/Hr 18 1 H RM/Hr 7 1 M + 1 H M2/Day 10 1 M + 1 H M2/Day 20 1 M + 2 H M2/Day 17 1 M + 2 H M2/Day 15 1 C + 1 H Rm/Day 90 1 M + 1 H Rm 30 1 M + 1 H M2/Day 20 1 M + 2 H M2/Day 18 1 M + 2 H M2/Day 15 1 M + 1 H M2/Day 15 1 M + 1 H Rm/Day 40 1 M + 1 H Rm/Day 14 1 Po + 1 H M2/Day 100 1 M + 1 H M2/Day 10 1 M + 1 H M2/Day 30 1 M + 1 H M2/Day 8 1 M + 1 H M2/Day 12 1 M + 1 H M2/Day 15 1 M + 1 H M2/Day 20 1 M + 1 H M2/Day 40 1 M + 1 H Rm/Day 30 1 M + 1 H M2/Day 35 1 M + 1 H Lm/Day 40 1 M + 1 H M2/Day 6 1 M + 1 H M2/Day 15 1 M + 1 H Rm/Day 30 1 M + 1 H Rm/Day 10 1 M + 1 H M2/Day 50 1 M + 1 H Rm/Day 25 1 C + 1 H Rm/Day 100 1 M Rm/Day 10 1 C + 1 H M2/Day 30 1 C + 1 H M2/Day 20 1 M + 1 H M2/Day/ Coat 100 1 M + 1 H M2/Day/ Coat 100 1 P M2/Day/ Coat 200 1 P M2/Day/ Coat 80 1 P M2/Day/ Coat 100 1 P M2/Day/ Coat 60 1 P + 1 H M2/Day/ Coat 50 1 Pl + 1 H R.M/Day 12 1 Pl + 1 H R.M/Day 20 1 Pl + 1 H R.M/Day 75 1 Pl + 1 H R.M/Day 60 1 Pl + 1 H Nos./Day 2 1 Pl + 1 H Nos./Day 2 1 Pl + 1 H Nos./Day 3 1 Pl + 1 H Nos./Day 2 1 Pl + 1 H Nos./Day 2 1 Pl + 1 H Nos./Day 2 1 Pl + 1 H Nos./Day 2 1 Pl Nos./Day 1 1 M + 1 H Nos./Day 2 1 Pl + 1 H Nos./Day 2 1 El + 1 H R.M/Day 50 1 El + 1 H R.M/Day 50 1 El + 2 H R.M/Day 150 1 El + 1 H R.M/Day 300 1 El + 1 H Nos./Day 2 1 El + 1 H Nos./Day 1