DISASSEMBLY OF THE PISTON

During the process of disassembly of the piston in the picture below parts are numbered

1 lower arms 9 crane hole

2 M8 bolt 10 Piston barrel

3 Cover 11 M24 bolts

4 M16 bolt 12 straight

5 Piston shaft nuts cover 13 M24 holding eye

6 Piston shaft nuts 14 M16 holding eye

7 Piston shaft 15 heads and arms

8 Elevator 16 1.1/4” Hydraulic hoses

------------------------------------------------------------------------------------------------------------------------------------

1. Operation

When bucket is in open position,disassemble sub-branc connection shaft whic is on the right side
of arm. ( drawing 1 )

1 lower arms

YER

Drawing 1.

Güven Kepçe Makine İç ve Dıș Tic. Ltd. Ști.


Nazım Hikmet Caddesi 536 Sokak No: 9 Çayırova 41420 / KOCAELI / TURKEY
Tel: +90 262 743 88 58 (Pbx) Fax: +90 262 743 11 41
Web: www.guvenkepce.com E-Mail: guven@guvenkepce.com
2. Operation

Set down heads and arms group with help of crane (such as number 15). Disassemble the parts in
order . (Drawing 2.)

heads and arms 2 M8 bolt


15
3 Cover

4 M16 bolt

Piston shaft nuts cover


5

6 Piston shaft nuts

7 Piston shaft

8 Elevator

YER

Drawing 2.

Güven Kepçe Makine İç ve Dıș Tic. Ltd. Ști.


Nazım Hikmet Caddesi 536 Sokak No: 9 Çayırova 41420 / KOCAELI / TURKEY
Tel: +90 262 743 88 58 (Pbx) Fax: +90 262 743 11 41
Web: www.guvenkepce.com E-Mail: guven@guvenkepce.com
3. Operation

Disassemble the hydraulic hose and bolts and remove the elevator up with crane. (drawing 3. –
drawing 4.)

9 crane hole

8 Elevator

drawing 3.

YER

---------------------------------------------------------------------------------------------------------------------------------------
9 crane hole

8 Elevator
” Hydraulic hoses 16

drawing 4.

YER

Güven Kepçe Makine İç ve Dıș Tic. Ltd. Ști.


Nazım Hikmet Caddesi 536 Sokak No: 9 Çayırova 41420 / KOCAELI / TURKEY
Tel: +90 262 743 88 58 (Pbx) Fax: +90 262 743 11 41
Web: www.guvenkepce.com E-Mail: guven@guvenkepce.com
4. Operation

For the disassemble piston shaft,loose the M24 bolts (such as showing of number 11). Assemble
the M24 bolts next to straight.Remove the straight up with crane and separate from piston.(drawing
5).Assamble the M16 holding eye on M16 and remove the piston shaft up with crane

14 M16 holding eye

13 M24 holding eye

12 straight

7 Piston shaft

7 Piston shaft

11 Piston barrel
E

drawing 6.
E
E

drawing 5.
E

Güven Kepçe Makine İç ve Dıș Tic. Ltd. Ști.


Nazım Hikmet Caddesi 536 Sokak No: 9 Çayırova 41420 / KOCAELI / TURKEY
Tel: +90 262 743 88 58 (Pbx) Fax: +90 262 743 11 41
Web: www.guvenkepce.com E-Mail: guven@guvenkepce.com

You might also like