PROPOSED CONSTRUCTION OF 6No. 1X4 SINGLE QUARTERS STAFF HOUSING UNITS AT NAKONDE BORDER (LOT 16)
SUBSTRUCTURE
ALL PROVISIONAL
Preambles
Carried to collection K -
Excavations
Hardcore filling
Damp proofing
CONCRETE WORK
Reinforcement
Formwork
Blockwork
Finishings - External
COLLECTION
CONCRETE WORK
Precast Units
Supply and install 250mm diameter concrete columns 2 meters long
B each 4 no 2,500.00 10,000.00
Sawn Formwork
Window sill
Damp proofing
Sundries
ROOFING
Joinery
Ceiling
B Rhino board (Gypsum) cornice fixed with cove bond 89 m 45.00 4,005.00
Ironmongery
Sundries
Wardrobe Shelving
L Soap holder stainless steel type wall mounted 2 Nr. 95.00 190.00
COLLECTION
METALWORK
Standard Units
Timber frame
E Hardwood door frame for wardrobes 16 m 80.00 1,280.00
H Ditto but type 5V6/5V6 overall size 1200mmx500mm high 2 Nr 1180 2,360.00
Supply and install grill doors to all external doors complete with locking
mechanism, primed with one coat of red oxide before delivery
Grill door of steel bars as per architect instruction to match door size
K 900 x 2000mm 1 Nr 2,650.00 2,650.00
PLUMBING INSTALLATION
INTERNAL PLUMBING
SANITARY INSTALLATION
WASTE INSTALLATION
UPVC PIPES FITTINGS AND FIXED AS DESCRIBED
(PROVISIONAL)
SANITARY FITTINGS
Geyser
TESTING
CHLORINATION
BUILDERS WORK
COLLECTION
ELECTRICAL INSTALLATION
Preambles
Electrical Installation
Supply, deliver, install, connect and set to work conduits for lights,
switches, socket outlets, power points and electrical fittings, including
cabling, cable glands, junction boxes, draw wires, switch and socket
outlet boxes and all accessories as:
Supply, install, connect and set to work all trays, conduit, conduit
fittings, boxes, lamp holders, switches and wiring to connect to the
following light points with 1.5 mm2 cables:
Generally
Allow for giving all notices for inspections and tests as required by
AA ZESCO 1 item 500.00 500.00
AB Allow for all necessary earthing and bonding as described 1 item 1,000.00 1,000.00
described
COLLECTION
Floor finish
300 x 300 x 7mm NON SLIP ceramic glazed floor tiles with approved
adhesive and pointed in white grout to joints to clients approved colour
D range and to the satisfaction of the Architect 13 m2 390 5,070.00
Wall Tiling
COLLECTION
GLAZING
INTERNALLY
Prepare wall surface, and apply one undercoat and two coats
washable Plascon Double Velvet premium quality velvet sheen wall
coating or client approved equivalent
Prepare wall surface, and apply one undercoat and two coats
of PVA emulsion paint on the following
EXTERNALLY
Metal Surfaces
Wood Surfaces
SUMMARY PAGE
SUB-TOTAL 733,247.30
MULTIPLY X 1NO. X 1
SUBSTRUCTURE
ALL PROVISIONAL
Preambles
Carried to collection K -
Excavations
Hardcore filling
Damp proofing
CONCRETE WORK
Reinforcement
Formwork
Blockwork
Finishings - External
COLLECTION
CONCRETE WORK
Precast Units
Supply and install 250mm diameter concrete columns 2 meters long
B each 4 no 2,500.00 10,000.00
Sawn Formwork
Window sill
Damp proofing
Sundries
ROOFING
Joinery
Ceiling
B Rhino board (Gypsum) cornice fixed with cove bond 60 m 45.00 2,700.00
Ironmongery
Sundries
L Soap holder stainless steel type wall mounted 1 Nr. 95.00 95.00
COLLECTION
METALWORK
Standard Units
H Ditto but type 5V6/5V6 overall size 1200mmx500mm high 1 Nr 1180 1,180.00
Supply and install grill doors to all external doors complete with locking
mechanism, primed with one coat of red oxide before delivery
Grill door of steel bars as per architect instruction to match door size
K 900 x 2000mm 2 Nr 2,650.00 5,300.00
PLUMBING INSTALLATION
INTERNAL PLUMBING
SANITARY INSTALLATION
WASTE INSTALLATION
UPVC PIPES FITTINGS AND FIXED AS DESCRIBED
(PROVISIONAL)
SANITARY FITTINGS
Shower tray complete with shower mixer and rose 1 nr 8,500.00 8,500.00
Geyser
TESTING
CHLORINATION
BUILDERS WORK
COLLECTION
ELECTRICAL INSTALLATION
Preambles
Electrical Installation
Supply, deliver, install, connect and set to work conduits for lights,
switches, socket outlets, power points and electrical fittings, including
cabling, cable glands, junction boxes, draw wires, switch and socket
outlet boxes and all accessories as:
Supply, install, connect and set to work all trays, conduit, conduit
fittings, boxes, lamp holders, switches and wiring to connect to the
following light points with 1.5 mm2 cables:
Generally
Allow for giving all notices for inspections and tests as required by
AA ZESCO 1 item 500.00 500.00
AB Allow for all necessary earthing and bonding as described 1 item 1,000.00 1,000.00
described
COLLECTION
Floor finish
300 x 300 x 7mm NON SLIP ceramic glazed floor tiles with approved
adhesive and pointed in white grout to joints to clients approved colour
D range and to the satisfaction of the Architect 4 m2 390 1,560.00
Wall Tiling
COLLECTION
GLAZING
INTERNALLY
Prepare wall surface, and apply one undercoat and two coats
washable Plascon Double Velvet premium quality velvet sheen wall
coating or client approved equivalent
Prepare wall surface, and apply one undercoat and two coats
of PVA emulsion paint on the following
EXTERNALLY
Metal Surfaces
Wood Surfaces
SUMMARY PAGE
SUB-TOTAL 556,719.00
MULTIPLY X 4NO. X 4
Site Clearance
Excavation
Excavation
Culverts
Concrete Paving
COLLECTION
WATER RETICULATION
Stand pipe
B Setting up drilling rig and associated equipment on site 1 item 2,500.00 2,500.00
Generally
To Collection K 13,500.00
COLLECTION
ELECTRICAL INSTALLATION
A Allow for connection to zesco supply including external cables 1 Item 30,000.00 30,000.00
ELECTRICAL RETICULATION
TOTAL CARRIED TO SUMMARY K 34,200.00
Dish Drain
Apron
PERIMETER FENCING
Excavations
CONCRETE WORK
BLOCKWORK
C 150mm thick solid filled blockwork in foundations m2 98.4 330.00 32,472.00
F 150mm wide Brickforce in foundation walls every 3rd course m 492 5.00 2,460.00
SUMMARY PAGE
BILLS OF QUANTITIES
GENERAL SUMMARY
A PRELIMINARIES K
B FLAT TYPE 1 K
C FLAT TYPE 2 K
D EXTERNAL WORKS K
100,000.00
733,247.30
2,226,876.00
749,621.25
3,809,744.55