I.

GENERAL

I.1. SCOPE OF WORK


This document presents design for Boiler Foundation of PLTU Sintang 3 x 7 MW, Indonesia.
I.2. CODE AND STANDARD
General code and standard
- ACI 318-99 American Concrete Institute
- SNI 03-1726- 2002 Standard of Seismic Resistant Design for Building's Structure
- Soil Investigation Report and recommendation of PLTU Sintang
I.3. MATERIAL
- Concrete fc'
- Reinforcement
ASTM BJTD 40
- Specific gravity of reinf. Concrete
- Specific gravity of soil

25.00 MPa
fy =
(c) =
(s) =

250.00 kg/cm2

390.00 MPa
2400.00 kg/m3
1800.00 kg/m3

E =

200000.00 MPa

I.4. APPLIED SOFTWARE


- Microsoft Excell
- Etabs
- Plaxis 8.2
II.

DESIGN FOUNDATION

II.1. MODEL OF BOILER FOUNDATION

COLUMN 2

II.2. LOADING
Based on Data Output Etabs Calculation used Maximum Load
TEMPORARY LOAD DL+LL+R+E
Story
Point
Load
BASE
1
COMB20
BASE
1
COMB21
BASE
1
COMB22
BASE
1
COMB23
BASE
2
COMB20

FX
104.7
32.29
134.67
-23.36
-116.15

FY
-122.26
-274.19
-97.73
-319.75
-169.58

FZ
384.75
627.62
350.42
691.37
171.95

MX
-386.169
-256.399
-467.876
-104.658
-216.583

MY
139.457
-79.677
208.695
-208.261
-238.235

MZ
56.894
85.467
56.494
86.211
61.37

Pile Cap

P3
P3
P3
P3
P3

BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE
BASE

2
2
2
3
3
3
3
4
4
4
4
5
5
5
5
6
6
6
6
7
7
7
7
8
8
8
8
9
9
9
9
10
10
10
10

COMB21
COMB22
COMB23
COMB20
COMB21
COMB22
COMB23
COMB20
COMB21
COMB22
COMB23
COMB20
COMB21
COMB22
COMB23
COMB20
COMB21
COMB22
COMB23
COMB20
COMB21
COMB22
COMB23
COMB20
COMB21
COMB22
COMB23
COMB20
COMB21
COMB22
COMB23
COMB20
COMB21
COMB22
COMB23

-213.54
-106.07
-232.25
-45.93
-131.19
-30.23
-160.33
-30.09
-121.11
-12.65
-153.49
200.56
170.43
231.15
113.62
12.66
-37.14
25.86
-61.66
109.78
74.12
131.18
34.38
140.04
101.49
163.96
57.07
-4.4
-28.07
0.62
-37.4
35
24.46
41.28
12.79

-39.88
-216.2
46.69
119.04
147.82
131.37
124.92
19.02
20.24
24.54
9.99
-86.47
-239.78
-61.52
-286.12
-111.31
19.81
-158.39
107.24
191.36
219.87
203.79
196.8
49.71
50.92
55.23
40.66
-29.23
-33.49
-29.79
-32.45
-7.96
-12.23
-8.52
-11.2

-9.47
198.83
-59.39
1163
1251.47
1224.91
1136.5
1148.41
1030.54
1266.32
811.57
969.93
1433.24
952.97
1464.73
1905.34
1628.36
2159.88
1155.64
1333.03
1408.07
1418.98
1248.44
1161.22
1044.63
1284.4
815.85
257.34
144.53
294.84
74.9
366.35
302.34
409.48
222.24

-515.317
-179.279
-584.597
-557.155
-648.22
-611.599
-547.11
-85.827
-95.178
-102.413
-64.376
-446.039
-313.903
-528.463
-160.83
-314.52
-615.68
-276.427
-686.424
-676.831
-767.352
-731.462
-665.893
-124.134
-133.475
-140.728
-102.658
71.847
80.873
72.148
80.315
36.903
45.937
37.197
45.391

-499.324
-203.182
-564.422
-118.101
-356.688
-73.853
-438.864
-87.889
-334.587
-40.704
-422.217
461.046
369.609
535.901
230.592
140.514
15.702
185.672
-68.163
304.965
204.608
363.888
95.18
352.926
247.018
415.894
130.079
-17.169
-80.822
-4.197
-104.912
89.351
61.348
105.741
30.908

II.3. FOUNDATION DESIGN


a.

b.

Soil Bearing Capacity


Data from Bor Log BH 1
N-SPT =
24
qc
=
140
qall

qc / 20

qall

7
700

Data from Etabs Calculation


Mx
=
528.463
My
=
535.901
Ix
=
10.67
Iy
=
2.67
X
=
1.00
Y
=
2.00

( Stift Clay)
kg/cm2

kg/cm2
kN/m2

kNm
kNm
m4
m4
m
m

Bearing Capacity Check


Used maximum load from output Etabs calculation Comb 22 (Column 2)
V=
952.97 kN
=
95297.00 kg
Pedestal =
17.28 kN
=
1728.00 kg
Pile cap =
96.00 kN
=
9600.00 kg
Soil =
59.04 kN
=
5904.00 kg
W total = P =

1125.29 kN

112529.00 kg
Dimention of foundation
Dimention of pedestal

4.00

0.90

1.00
0.80
0.50
2.00

Bearing Capacity
q nett =
Stability Check

2.00

q nett

440.71 kN/m2

Mx . Y
Ix

P
A

=
<

qall

My. X
Iy

700.00 kN/m2

<
oke

qall

86.179
62.376
84.311
92.788
107.393
99.79
94.389
73.633
88.498
78.152
80.106
57.028
85.114
56.748
85.634
61.6
86.371
62.625
84.467
92.874
107.448
99.884
94.431
72.58
87.443
77.1
79.048
26.769
30.303
28.674
26.766
24.502
28.037
26.405
24.502

P3
P3
P3
P2
P2

P2
P2
P1
P1
P1
P1
P3
P3
P3
P3
P3
P3
P3
P3
P2
P2
P2
P2
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1

Horizontal Load
Hx =
231.15 kN
Hy =
61.52 kN
M = Hx * h + My
M =
767.05 kNm

c.

=
=

e =

M/P

< 1/6 B

Stability Check =

0.68

< 1/6 B

Sliding Check
Total Axial Load =
Lateral Load =
Friction Angle =

P=
H=
=
tg =
=

Cohesion of Soil =
Safety Factor =

SF =
=
=

d.

23115.00 kg
6152.00 kg

Punching Shear Check


Pu =

1125.29
231.15
0.00
tg (2/3 )
0.00
143.64
P tg + Ca B
H
287.28
231.15
1.24

1.4 x V =

0.33

not oke

kN
kN

kN/m2

<2

not oke

1334.16 kN

Vc =

0.85 x 1.1 x(fc')^0.5 x Kp x h

Kp =
=

2(a+h)+2(b+h)
5.40 m

Vc =

3,915.74 kN > Pu

oke

II.4. CHECKING SETTLEMENT


Modelling and Geometry of Boiler Foundation

Soil properties BH 1

Mohr-Coulomb

gunsat
gsat
kx
ky
einit
ck
Eref

Type
[kN/m]
[kN/m]
[m/day]
[m/day]
[-]
[-]
[kN/m]

1
layer 1 (8.6 9.6)
Undrained
13.4
16.8
0
0
0.95
1.00E+15
6754.55

2
layer 2 (9.6-11)
Undrained
15.4
19.4
0.001
0.001
0.7
1.00E+15
17151.234

3
layer 3 (11.6 14.8)
Undrained
14
17.2
0.001
0.001
0.89
1.00E+15
25092.645

4
Layer 4 (14.818.2)
Undrained
14
17.2
0.001
0.001
0.9
1.00E+15
26825

n
Gref
Eoed
cref
j
y
Einc
yref
cincrement
Tstr.
Rinter.

[-]
[kN/m]
[kN/m]
[kN/m]
[]
[]
[kN/m/m]
[m]
[kN/m/m]
[kN/m]
[-]

0.3
2597.904
9092.663
143.64
0
0
0
0
0
0
0.9
Neutral

0.3
6596.628
23088.2
185.54
0
0
0
0
0
0
0.9
Neutral

0.3
9651.017
33778.561
134.66
0
0
0
0
0
0
0.9
Neutral

0.3
10317.308
36110.577
299.25
0
0
0
0
0
0
0.9
Neutral

EA

EI

Mp

Np

Interface
permeability

Foundation Properties

No.
1

Identification
Foundation

[kN/m]

[kNm/m]

[kN/m/m]

[-]

[kNm/m]

[kN/m]

1.08E+07

2.24E+05

12.5

0.15

1.00E+15

1.00E+15

Time [day]
0
0
0
0
4
10
21
29
30
30
30
30
30
30
30
31
31
31
32
32
33
34
37
40
43

|U| [m]
0.000
0.000
0.000
0.000
0.005
0.015
0.035
0.052
0.054
0.054
0.058
0.060
0.061
0.061
0.062
0.062
0.063
0.064
0.066
0.067
0.069
0.073
0.078
0.081
0.083

Curve of Settlement

Result of Plaxis
Point
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Step
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

Settlement on time 20 years =

46
52
58
69
93
139
233
326
513
887
1261
1448
1634
2008
2756
3503
4251
5746
7330

0.084
0.085
0.085
0.086
0.086
0.086
0.086
0.086
0.086
0.086
0.086
0.086
0.086
0.086
0.086
0.086
0.085
0.085
0.085
8.5

cm

>

2.5

cm ( allowable)

Soil Improvement with Cerucuk


( Dia. 120 mm, distance between of cerucuk 300 mm )

Soil properties BH 1

Mohr-Coulomb

gunsat
gsat
kx
ky
einit
ck
Eref
n
Gref
Eoed
cref
j
y
Einc
yref
cincrement

Type
[kN/m]
[kN/m]
[m/day]
[m/day]
[-]
[-]
[kN/m]
[-]
[kN/m]
[kN/m]
[kN/m]
[]
[]
[kN/m/m]
[m]
[kN/m/m]

1
layer 1 (8.6 9.6)
Undrained
13.4
16.8
0
0
0.95
1.00E+15
6754.55
0.3
2597.904
9092.663
143.64
0
0
0
0
0

2
layer 2 (9.6-11)
Undrained
15.4
19.4
0.001
0.001
0.7
1.00E+15
17151.234
0.3
6596.628
23088.2
185.54
0
0
0
0
0

3
layer 3 (11.6 14.8)
Undrained
14
17.2
0.001
0.001
0.89
1.00E+15
25092.645
0.3
9651.017
33778.561
134.66
0
0
0
0
0

4
Layer 4 (14.818.2)
Undrained
14
17.2
0.001
0.001
0.9
1.00E+15
26825
0.3
10317.308
36110.577
299.25
0
0
0
0
0

Not Safe

Tstr.
Rinter.

[kN/m]
[-]
Interface
permeability

0
0.9
Neutral

0
0.9
Neutral

0
0.9
Neutral

0
0.9
Neutral

Foundation and Cerucuk Properties


No.

Identification

EA
[kN/m]

EI
[kNm/m]

w
[kN/m/m]

n
[-]

Mp
[kNm/m]

Np
[kN/m]

1
2

Foundation
Cerucuk

1.08E+07
27500

2.24E+05
33

12.5
0.9

0.15
0.2

1.00E+15
1.00E+15

1.00E+15
1.00E+15

Time [day]
0
0
0
0
10
20
20
26
37
56
70
70
70
70
70
70
70
70
70
70
70
70
70
71
71
71
71
71
71
72
72
72
72
73
73

|U| [m]
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.004
0.011
0.026
0.037
0.037
0.037
0.041
0.042
0.043
0.043
0.044
0.045
0.045
0.046
0.047
0.048
0.049
0.049
0.050
0.051
0.052
0.053
0.054
0.054
0.055
0.055
0.056
0.057

Curve of Settlement

Result of Plaxis
Point
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

Step
0
1
2
3
3
4
5
5
6
7
8
9
10
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79

Settlement on time 20 years =

74
74
76
77
79
82
85
91
96
108
120
143
166
213
260
307
353
400
447
540
634
727
821
914
1007
1194
1381
1475
1661
1848
1942
2129
2316
2502
2689
3063
3437
3811
4184
4558
4932
5306
5679
6053
6427
6801
7174
7370

0.058
0.058
0.059
0.060
0.061
0.061
0.062
0.062
0.062
0.062
0.062
0.062
0.062
0.062
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
6.3

cm

>

2.5

cm ( allowable)

Not Safe