Professional Documents
Culture Documents
Pile Hammer Selection Checklist
Pile Hammer Selection Checklist
Pile Hammer Selection Checklist
Haveyoudeterminedthepiledrivingcriteriausingsetpenetrationasperwave equation? PILEDRIVINGCHECKS Hasallpredrivingdatabeenenteredonthepiledrivingrecord? Hasthe"MinimumTipTarget"markbeendeterminedandentered? Hasthe"stopforspotcheck"markbeendeterminedandentered?([Pilelengthcut offelev.Ref.elev.) Arethepileswithinallowabletolerance?(Makesurepileisalignedaccordingtothe plans.) Arepilesmarkedinthecorrectintervals? Isthehammerwarmedupandsetontheproperenergysettingforstartingout? Ifconcretepilerequiressplicing,isitasapproved? Ifconcretepilerequiressplicing,isitasapproved? Hasitbeendeterminedatwhatintervalstocheckthehammercushionwithaview forreplacement? Hasitbeendeterminedatwhatintervalstocheckthepilecushionwithaviewfor replacement? WHENTOSTOP IsthereaMinimumTipElevationspecified? IfYes,hasthepilereachedMinimumTipElevation? HasthePilemetthedrivingcriteriaspecifiedinwaveequationsetpenetrationbythe engineer? HasthePilereachedPracticalRefusalassetbytheengineer? Isthetopofthepilewithin600mmofCutoffelevation Haveanyofthepilesheaved? Oncethesubstructureiscompletehaveyousentinthepiledrivingrecords? Yes No N/A
10 11 12 13 14 15 16 17 18 19
20 21 22 23 24 25 26