Kribi Deep Sea Port - Phase 1: Project Owner/borrower
Kribi Deep Sea Port - Phase 1: Project Owner/borrower
Kribi Deep Sea Port - Phase 1: Project Owner/borrower
v Project owner/Borrower:
phase 1
v Lender (financing):
CONTENT
1. Introduction 2. Design Basis 3. Principles of Master Plan 4. Master Plan of Kribi Deep Sea Port 5. General Layout of Phase I 6. Conclusion
vLoan agreement : based on EPC contract between MINEPAT and CHEC. vEPC contract : Engineering part is based on available technical studies and data provided by MINEPAT, with possibility of updating.
key elements
vBased on initial design within the EPC contract, CHEC takes into account of following elements for making option, update and optimization: - employer s requirements: within EPC contract - legal framework: EPC contract and loan agreement. - technical requirements: 8 technical studies, APS, Schma Directeur and other data. - industrial needs: by coordination meetings and technical exchanges with different stakeholders of industrial projects.
result
Design Basis
l All the Studies are useful and applicable. l Different sources of data and studies evaluated (wave, sediment)
l Others l Requirements are flexible l Enough berths remained for future development
Compatible to Natural Conditions Economical Following loan agreement and EPC contract
Conclusion
l Try our best to meet the requirements of different projects ; l Depending on a lot of studies and investigations; l The best choice after option assessment: lower cost more convenient and safer for operation more compatible to natural conditions more compatible to future development. l Contine Optimization to meet requirements to the most; l Geothechnic Investigation ongoing l Hope phase I to take off soon