Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Price List

For Residential Flat in SRS Royal Hills at Sector-87, Faridabad (Haryana)


SUPER AREA ( Approx)
1025

Accommodation
2 Bedroom, Drawing/Dining, Kitchen, 2 Toilets, 2 Balcony 2 Bedroom, Study Room, Drawing/Dining, Kitchen, 2 Toilets,2 Balcony 3 Bedroom, Drawing/Dining, Kitchen, 2 Toilets,2 Balcony
3 Bedroom, Servant Room, Drawing/Dining, Kitchen, 3 Toilets,2 Balcony

Floor
P to 4 5th to 9th 10th to last P to 4th 5th to 9th 10th to last P to 4th 5th to 9th 10th to last P to 4th 5th to 9th 10th to last
th

Basic Sale Price


(`)
27,49,000/25,99,000/24,99,000/29,99,000/28,49,000/27,49,000/37,49,000/35,99,000/34,99,000/40,99,000/39,49,000/38,99,000/-

Booking Amount
(`) ` 200000/-+ 5150/( Service Tax) = ` 205150/` 250000/-+ 6438/( Service Tax) = ` 256438/` 300000/-+ 7725/( Service Tax) = ` 307725/` 350000/-+ 9013/( Service Tax) = ` 359013/-

1133

1450

1650

EDC & IDC

` 382/- Per Sq ft

Other facilities and charges


1 2 3 4 5 6 7 8 Power Backup Installation I KVA EEC/FFC Reserved covered car parking space for one car PLC - Floor / Green PODIUM Area Utility Connection Charges (UCC) IFMS Club Membership No Extra Charge No Extra Charge No Extra Charge No Extra Charge `500/- Per Sq ft No Extra Charge ` 50/- Per Sq ft ` 75000/-

PAYMENT PLAN
CONSTRUCTION LINKED INSTALLMENT PLAN Booking Amount (1st Installment) Within 60 days of Booking (2nd Installment) Within 120 days of Booking (3rd Installment) On Casting of Foundation (4th Installment) On Casting of Basement Roof Slab (5th Installment) On Casting of First Floor Roof Slab (6th Installment) On Casting of Third Floor Roof Slab (7th Installment) On Casting of Fifth Floor Roof Slab (8th Installment) On Casting of Seventh Floor Roof Slab (9th Installment) On Casting of Tenth Floor Roof Slab (10th Installment) On Casting of Last Floor Roof Slab (11th Installment) On Completion of Internal Plaster (12th Installment) On completion of Flooring (13th Installment) On offer of Possession (Last/14th Installment) As mentioned in price list Payment of 20% BSP to be Completed 10%of BSP + 50 % of EDC/IDC + Construction linked dues 5% of BSP + 50 % of EDC & IDC 7.5% of BSP + 25% of Other Charges + 25% PODIUM AREA 7.5% of BSP + 25% of Other Charges + 25% PODIUM AREA 7.5% of BSP + 25% of Other Charges + 25 % PODIUM AREA 7.5% of BSP + 25% of Other Charges + 25 % PODIUM AREA 7.5% of BSP 7.5% of BSP 7.5% of BSP 5% of BSP 5% of BSP Balance BSP & other charges (if any)

Notes: (i) Construction Linked dues - Allottee shall have to make the payment of installments upto completed construction stage as per above installment plan within 120 days of booking 3% Timely payment discount on BSP of every installment will be given, if demanded installment is paid by due date. Service Tax, as applicable will be payable extra.

(ii)

(iii)

You might also like