Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

Ω FK Power Solution

New and used Gas-and Steam Turbines,


Boilers, Power- and Industrial Plants

Used Power –and Industrial Plants for sale

FK Power Solution
Abt-Mauch-Str. 3
88214 Ravensburg/Germany
Tel: +49 751 1807062
Mobil +49 171 752 5838
Fax:
E-Mail:
Internet:

Steamturbines
Ref.-Nr. Qty. Out- Pres./Flow/Temp Description Manufac. Built
put
MW
ST 103 1 73 132 bar, 510°C, Extraction-Condensing Siemens 1973
350t/h Turbine
ST 110 1 42 108 bar/ 520°C/ Back Pressure Turbine, BBC 1974
150 t/h including Boiler
ST 101 1 32 89bar, 520°C Extraction-Condensing Borsig 1972
Turbine
St 116 2 30 50 bar,482 °C Condensing steam turbine AEG Kanis 1976
ST 112 1 11,8 63 bar, 60 t/h, 470°C Condensing Turbine BBC 1975
ST 114 1 6,3 89 bar,40 t/h, 525°C Back Pressure Turbine SGB/Germ 1979
any
ST 109 1 5 43 bar/455°C Extraction Backpressure Siemens 1986
Turbine
ST 111 1 2,7-4 13 bar, 18-25 t/h Condensing Turbine M&M/Germ 2001
any
ST 115 1 2,1 38 bar/ 495°C Back Pressure Turbine Siemens 1955
ST 107 1 2,2 15 bar/280°C Back Pressure Turbine Siemens 1989
ST 108 1 2,2 37/45bar/410°C Back Pressure Turbine ABB 1989
ST 106 1 1,25 14 bar/330°C Back Pressure Turbine Siemens 1982

Gasturbines and Power Stations


Ref.-Nr. Qty Out Fuel Volta Type Manufac. Condition
put ge
MW KV
GT 312 1 180 Gas 15 GT 13 E 2 Alsthom New, Built 2008
GT 316 2 126 Gas, 11 Frame 9, GE New
Destilate 9171 E
and
Heavy oil
GT 307 2 38,8 Gas and 11 Frame 6 B GE 30.000 and 45.000
Destilate running hours
GT 303 1 30 Gas 10,5 Siemens

1
GT 311 6 16,5 Gas 13,8 MS 5001 LA GE Under 1000 running
hours
GT 313 1 16,3 Gas 13,8 Frame 5 GE Non overhauled
GT 305 1 10 Gas 6 Mars 100 Solar 15.000 running
and Oil hours, Built 1997
GT 310 1 10 Gas Mars 100 Solar 32.000 running hours
GT 315 1 10 Gas 15 Typhoon Alsthom, 2 Only 4000 running
units a 5 hours since
MW, overhaul, Built in
including 1995
Waste Heat
Recovery
Boiler,
24t/h,22 bar
GT 314 2 9,5 Gas 2 x Centaur H Solar and Combined Cycle
and KKK KKK Power Station, Built
-Steam in 1995. Running
Turbine and Hour Gas Turbine 1:
Steam Boilers 25000, Gas Turbine
2: 2500
GT 301 1 4,7 Gas 6 Taurus Solar 30.000 running hours
GT 304 1 4,7 Gas 10,5 Taurus Solar Overhauled
GT 318 1 4,7 Gas Taurus Solar 3500 running hours,
built in 1999
GT 302 1 3,8 Gas 10,5 Centaur H Solar and 30.000 running
and Ecoair Ecoair/Ger hours, including Gas
Gas many Compressor ( 4 to 15
Compressor bar ) and Waste Heat
Recovery
Boiler,15t/h, 17,5 bar
GT 309 1 3,8 Gas Centaur H Solar 32.000 running hours
GT 308 1 3,3 Gas and 6 TB 4000 Ruston Under 1000 running
Oil hours
GT 317 1 1,2 Gas and 10 Saturn 20 Solar 37500 running hours,
Oil Built 1995

Boilers
Ref.-Nr. Qty. Output t/h Pres./ Describtion Manu Built
Temp, bar fac.
SB 503 1 30 9 Steam Boiler Baum 1993
garte
SB 502 1 10,5 10 Waste Heat Recovery 1992
SB 504 1 25 20 Steam Boiler Stand 1972
ard

2
Diesel-and Gasengines
Ref.-Nr. Qty. Out Fuel Voltage Type Manufac. Built Condition
put
MW
DG 807 2 5 Diesel 11 16 KU 30 Mitsubishi 1996 47000
A running
hours
DG 805 2 3,9 Diesel 34,5 KV 18V28/32 MAN B&W Zero hour
and crude H overhauled,
oil including
waste heat
recovery
boiler, 1,5
t/h, 7 bar
DG 804 3 3,5 Diesel 6,3 KV 3612 Cat 1990 Zero hours,
DITA overhauled
DG 810 1 2,55 Gas and 10,5 KV MBH/ M944 1996 Last
Diesel oil Germany overhaul in
2008
DG 808 1 1,8 Diesel 0,4 Cat Cat 1996 Emergency
3516A Mobile
Trailer unit
with 5100
running
hours
DG 806 3 1,1 Natural 0,4 G 3516 B Cat 15000-
Gas 17000
running
hours,
including
heat
recovery
Boiler
DG 809 3 1,1 Natural 0,48/ 7100GSI Waukesha 1996 19.000-
Gas 60Hz 20.000
running
hours
DG 811 2 1 Natural Deutz Siemens Built in Never used,
Gas 2001 zero hours
DG 802 5 0,9 Diesel O,4 KV 4008TAG TAG 2005 Low running
2a hours
DG 803 3 0,9 Diesel 3508 B Cat 2001 12500
running
hours

You might also like