Project Goals
Provide an environment perfectly matched with the VOIIT system, which will become the primary system or th life system. the lif t Allow the quality assurance team to apply the test plan on the Test system. Allow the developers to implement and test their new features and programs.
Logical Architecture
Physical Architecture
Centralized system of managing telephone messages for a large group of p p people that records, stores and retrieves voice messages. g
Voice mail to e-mail:
Centralized system that provide s a service that allows you to hear voice mail messages via email. Voice mails are sent as digital audio files in WAVE format. f
Audio conference: Telephone service that allows to have more than one called party listen
Testing process that exercises the system coexistence with others, after others implementing new feature or modifications.
Performance and Stress Testing:
Testing process that determine the system robustness in terms of extreme load and helps application administrators to determine if the application will perform sufficiently if the current load goes well above the expected maximum.
Selective retesting of a system or component to verify that modifications have not caused unintended effects and that the system or component still works as specified in the requirements.