Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 3

C

Marine Fleet Department Ministry of transport of Russia

CALCULATION OF STABILITY FOR VESSEL LOADING TIMBER ON DECK


by alternative demands to the ships of unlimited routes

GENERAL PARTICULARS
name of vessel port of registry country of flag port of loading port of discharging

-- 3064 --

class of vessel official number call sign

3 1 II 886102 UIYD

-NORRSUNDET, SWEDEN
/ )

route's limits

( loadline (timbtr and/or seasonal) loadline draft, m

, .

loadline freeboard, m

, . 2.01

loadline displacment, t

, .

3.99 :
, , ,

5213.25
, , . , ,

uprights, timber deck cargo high deck near the side, timber deck cargo width above every cargo compartment, type of timber cargo in every cargo spaces and above every compartmebt on the deck.

Cargo plan: indicate holds, tween decks coamings/tanks, bulwark, height of

1004.060 cbm 4 421.927 cbm 385.000 tonn

916.185 tonn 3 2 643.302 650.000 1 438.366 400.000

723.303 660.000

/ DEPARTURE CONDITION ; /crew&stores(constant) ; / bunkers ; / ; /


, fresh water mean draft ,

84 96.04 69.5 3.93

; / ;
/cargo

ballast

; / deadweight ; / displacement

4 3011.185 3264.725 5014.725

. I certefy that the calculations in this document the sufficient stability condition that will be experienced during the voyage and that the information given in this document is correct.

12/22/2000

CALCULATION OF CORRECTED KG
, / TYPE OF CARGO DENSINY , weight, tons

0.81

, / STOWAGE FACTOR , KG, m

1.10

compatment 1 hold No 1 2 hold No 2 3 hold No 3 4 hold No 4 on deck

timber cubic, cbm

density, t/cbm

, moments, mt

438.366 643.302 723.303 421.927 1004.060

0.81 0.81 0.81 0.81 0.81

400.000 650.000 660.000 385.000 916.185

3.69 3.68 3.69 3.68 8.07

1476.000 2392 2435.400 1416.800 7393.613

770 693 77 84.38538

/subtotal (1)

3300 ,

/subtotal(2) / crew&stores / liquid stores

3011.185 84 165.54 4 3264.725 1750 5014.725

/subtotal(3) 5 2.04 0

15113.813 420 337.7016 0 15871.515

/ballast /deadweight /light ship /displacement

5 /subtotal(4)

8750 24621.515 1.652

corrected to free surface cofficent

(
absorbtion of water (ice accretion) load

) ( )(5)

91.619 5106.344

8.07 /subtotal(6)

739.361 25362.528

displacement&absorbtion of water (ice accretion), subtotal

(KG) ( )

6/5=

4.97

CALCULATION OF CORRECTED GM

5.845

:
488/ /4

(GM) =

)-

(KG)=

0.88

CALCULATION OF CORRECTED ZG

Method of construction of static stability curve ( ) Consideration of absorption of water (ice accretion) of timber deckcargo Consideration of influence of free surface ( Buoyance of timber deckcargo (permeability coefficient) 5106.344 h= 0.88 Zg=a= D= Angle, Q Lf Ls Ld ) 4.97 Zc= 2.086 Zm=

10% 1.652

5.845

r=

3.734

-30
-2.945 -0.46

-20
-2.075 -0.38

-10
-1.027 -0.16

0
0 0 0

10
1.027 0.16 0.01

20
2.075 0.38 0.06

30
2.945 0.46 0.13

40
3.658 0.47 0.22

50
4.102 0.30 0.28

60
4.296 -0.01 0.31

70
4.295 -0.37 0.27

0.60 0.40 0.20 0.00 -0.20 -0.40 -0.60 -30 -20 -10 0 10 20 30
, GM . ., GZ ., . , . ), .

40

50

60
0.88 48.11 0.58 34 61 1.02

70
> > > > > > > 0.1 1 0.25 30 60 60 1

( Zg STABILITY CONTROL BY ADMISSIBLE GM (Kg MOMENT Mz) , Corrected GM , Corrected KG , Corrected moment Mz 0.88 4.97 25362.5 > < <

Mz)

0.7 Addmissible GM 3.255 Addmissible KG 32776.9 Mz Addmissible moment Mz

You might also like