BIll No.1 - Preliminaries Item No.

BILL NO. 1 - P R E L I M I N A R I E S

Rupiahs

SCOPE OF WORK The scope of this contract included the provision of labour, materials and equipments for the construction of the Main Contract works of the proposed Rumah Sakit Internasional Bintaro Renovation and Extension, Bintaro, Tangerang, which have a total gross area of approx. 4,012 m2 square metres and the ancillary works. NATURE OF CONTRACT This Contract shall be executed in strict accordance with the Article of Agreement and Condition of Contract as prepared in this Contract Document, Bills of Quantities, Specification and Drawings. DOCUMENT Contract Document shall include the followings : - Letter of Agreement as enclosed in the Bills, Article of Agreement, Condition of Contract, Appendix and Addition to the Condition of Contract, Bills of Quantities, Specifications and Drawings. CONDITIONS OF TENDERING Each Tenderer will be provided with one copy of these Specified Bills of Quantities and one copy of the Tender Form. One (1) original and two (2) copies of the Tender Form and Bills of Quantities are to be filled in, in ink or typed, and sent to the Architect/Owner at the address, time and date as directed in the Tender Form. The Tenderers are to note that the Owner reserves the right not to accept the lowest or any Tender, and in no case will any expenses incurred by any Tenderer in the preparation of this Tender be allowed Tenderers shall submit with their tender a fully priced copy of the Bill of Quantities. Refer also to further instruction under Bill of Quantities' later in this trade. The tender will be checked for Arithmetic errors by the Architects, then will submit a report to Employer before any tender is accepted The only recognized language for all tender and contract documents for this contract will be the English language WORK UNDER A SEPARATE CONTRACT The following work is excluded from this contract and is being carried out by the Owner or under separate contracts : - Mechanical and Electrical Works

Total Carried to Collection

INCLUDED

BILL OF QUANTITIES The Bills are measured generally in accordance with the Standard Method of Measurement for Building Works in Indonesia, First Edition. No alterations or additions shall be made to the Bills of Quantities without the written consent or instruction of the Quantity Surveyors All items in the Bills shall be priced in detail, not grouped together as total prices for any trade or section. Unless otherwise stated all items in these Bills shall be as supplied and fixed in positions as indicated on drawings and/or Specification. The quantities are taken absolutely net unless otherwise stated and these Bills of Quantities shall not be used as a material ordering list Throughout the Bills the following symbols shall be read as : M3 Cubic metre M2 Square metre M Lineal metre Kg Kilogram No Number Quantities stated as provisional are to be priced in the normal manner and are to be used in whole or in part as directed in writing by the Architect. The final cost to the Contract shall be calculated on a quantum meruit basis multiplied by the unit rate. 5/1

JFP.30627.MC-RSIB

DN / 82370871.xls

BIll No.1 - Preliminaries Item No.

BILL NO. 1 - P R E L I M I N A R I E S

Rupiahs

The Bills shall form part of the Contract and become known as the Contract Bills. The priced copy of the Contract Bills is to be available for use of the Architect and/or Quantity Surveyors for the purpose of valuing interim certificates, variations, etc., occuring during currency of Contract and producing the statement of final account. The Contract Bills shall be treated as a confidential document. PROVISIONAL AND PRIME COST SUMS Provisional and/or Prime Cost Sums are provided in these Bills of Quantities. The sum of money so designated shall be inserted in the cash column opposite the item without any alternation and such sums shall be expended as directed by the Architect or deducted wholly or in part if not require the purpose stated. The Contractor will not be allowed profit and/or attendance for items which are not used.

Total Carried to Collection

INCLUDED

MEASUREMENT OF WORK EXECUTED AND METHOD OF VALUATION All quantities given in these Bills of Quantities have been calculated from information supplied to the tenderer by the Architect and Engineer. The Contractor shall price every item for which he requires remuneration. If any item contained in these Bills is not priced, it shall be deemed that either : (a). The cost has been included elsewhere; or (b). No remuneration is required in respect of that item

All calculations, dimensions, abstracts and any other documents connected with variations, etc., and valuation of the Works shall be made available to the Contractor at the office of the Quantity Surveyor. SPECIFICATION AND BILLS OF QUANTITIES The Specification and Bills shall be read in conjunction one with the other. Any item included in either one and not in the other shall be deemed to be included in the other in the content of this contract. No allowance will be made for non-complience of any item due to lack of understanding. SITE CONDITION The site of the work is located at Jalan M.H. Thamrin Blok B3 No. 1, Sektor 7 Bintaro Jaya, Tangerang 15224. The Contractor is advised that the existing Building at the surrounding area of the site will be in continous operating during the period of this contract and that construction activities must be confined to those areas which will least interference to the Employer. Immediately on taking possession of the site and before commencing work, the Contractor shall check the setting out, the actual levels and contours of the site against those shown on the drawings and in the event of any discrepancy, shall immediately notify the Architect. Unless the above has been complied with, no claims for a discrepancy in the setting out, levels and contours will be considered. The Tenderer is advised to visit all parts of the site and fully acquaint himself with all the conditions likely to effect the works especially the enter ticketing charge for his workmen to the site, the nature of the existing building to be demolished, water sources and levels, position of works, site difficulties, means of access, etc. RESPONSIBILITY Whether expressly stated or not in these Bills, all descriptions, Specifications and Quantities are implied to be directed at or towards the tenderer tendering for and later awarded the Contract. No allowance will be made for non-compliance of a clause due to lack of understanding.

Total Carried to Collection

INCLUDED

THE CONTRACT SUM The final contract sum will be adjusted only for : 5/2

INCLUDED

JFP.30627.MC-RSIB

DN / 82370871.xls

BIll No.1 - Preliminaries Item No.

BILL NO. 1 - P R E L I M I N A R I E S - Variation of the quantities given in the BQ - Alteration to the Contract works as and when instructed by Architect. CONDITIONS OF CONTRACT The Contractor shall allow here for any costs involved in complying with the terms of the Conditions of Contract. CONTRACT PERIOD The Tenderer is to tender on the Employer's set time for completion which is 240 (two hundred and forty) calender days from the date of commencement on site whole of the Works or is to state in his tender the time required to complete the work. Extension of the Contract Period for wet weather or Public Holidays will not be allowed and such delays, if then occur, are deemed to be included in the overall Contract Period as given above BONUS AND LIQUIDATED DAMAGES Liquidated Damages will be deducted from amounts due to the Contractor in accordance with the Conditions of Contract at the rate of 0,1 % of the Contract sums per day for everyday that the Contract remains unfinished after the date fixed for completion with the maximum amount would be 5 % of the Contract sum Bonus payments will not be paid The Certificate of Practical Completion will be issued by the Architect and at his sole discretion. DAMAGE TO EXISTING PROPERTY The Contractor shall arrange for the conveyance of materials, plant, etc., so as to cause a minimum of damage to existing conditions area. The Contractor shall be responsible for any damage caused by his carriers or workmen to any existing conditions, etc., from whatsoever cause arising and shall maintain, repair and reinstate same, to their original condition to the satisfaction of the Architect or alternatively shall bear the cost of such maintenance and restoration as a deduction from money due to him under this Contract. The Contractor is to maintain and protect employer property including that of electricity, operational of the existing property and similar undertakings and is to make good or pay for the reinstatement of all damage thereto. RESTRICTED USE OF SITE The Contractor shall be responsible for keeping all persons under his control (including those employed by his own sub-contractors and suppliers) within the boundaries of the site. (refer to Site Conditions).

Rupiahs

INCLUDED

INCLUDED

INCLUDED

F G

11,000,000

INCLUDED

Total Carried to Collection

11,000,000

TEMPORARY ACCESS TO SITE Provide any necessary temporary works for access to and about the site and remove same at completion and make good to the satisfaction of the Architect. SITE VISIT The Contractor shall be deemed to have visited the site before tendering and ascertained exactly the site conditions under which the work would be executed as no claim for extra payment caused by insufficient and inadequate information will be considered. SITE ACCESS Allow for providing and forming any temporary cross-overs and/or unobstructed access and other works necessary for entry to the site and obtaining wayleaves required and subsequently clearing away as and when directed by the Architect and making good all works disturbed or damaged at this own expense to the satisfaction and approval of the Architect. PUMPING AND DRAINAGE Remove all water resulting from any source which may accumulate on the site from time to time by providing sufficient drainage and/or pumping systems to the Architect's approval. The site shall be maintained in a dry condition by the Contractor at all times at his expense. ADJACENT BUILDINGS Before commencement of the Works the Contractor shall take an adequate survey of any adjacent existing condition which may likely be effected by the execution of the works. Such survey should include their conditions, record of defects, extent of voults and under-slab structures and location of existing utility services.

34,650,000

INCLUDED

INCLUDED

INCLUDED

INCLUDED

JFP.30627.MC-RSIB

5/3

DN / 82370871.xls

BIll No.1 - Preliminaries Item No. F

BILL NO. 1 - P R E L I M I N A R I E S The Contractor shall take photographs of existing structures and/ or buildings in the vicinity before commencement of the work to keep as record of evidence of the conditions of these existing structures and/or buildings before the execution of the work. Should damages to the existing structures and/or adjoining building be discovered during the execution of the work, the Contractor shall be responsible to reinstate and make good the damaged works at his own expense with materials and workmanship to match in every aspect with the surrounding works to the satisfaction and approval of the Architect. ORDER OF WORKS The works shall be proceeded with in such an order as the Architect may direct, or in the acsence of such instruction, in the most workman like manner.

Rupiahs

INCLUDED

Total Carried to Collection

34,650,000

VISITORS TO SITE The Contractor shall not allow unauthorised visitors access in the Works. All authorised visitors indentities shall be entered into a visitors book which shall be available for inspection by the Architect at all times Authorised visitors shall be directed to the Contractor's site office, for identification, before being allowed on to the Work. FLUCTUATIONS It is a condition of this Contrac that the Employer shall not become liable for a claim from the Contractor and/or Sub-Contractors and suppliers as a result of changes in the rate of exchange of Rupiahs into foreign currency or rises and falls in the cost of materials, labour, plant, overheads and the like. However, in certain exceptional cases, and only then if the fluctuation should be officially legislated, the Employer may at his own discretion, entertain claims for a loss which the Contractor claims he has incurred due to the change in foreign currency relationship against the Rupiahs which has occured after the date for submission of tenders. In all such cases claims shall be substantiated in detail in writing and agreed in writing by the Quantity Surveyor. WORK PROGRAMME AND PERFORMANCE The Contractor is to allow for the preparation and maintenance of time and progress charts. The time and progress charts are to be delivered to the Architect within one week of the award of the Contract and they are to be checked by and agreed with the Architect prior to commencement of the works. The whole of the works must be proceeded with in such sections and at such times as may be ordered by the Architect. The Contractor must allow in his charts for all days which may become due as a result of adverse weather conditions, public holidays and other similar contingencies. Site meetings will be held to monitor the progress of the work plotted on the Barchart and S - Curve schedule. PAYMENTS TO THE CONTRACTOR The Contractor shall note that the Employer will make payments to him in his representative office location. The Contractor shall prepare a detailed application for progress payments each month and submit them to the Architect/Quantity Surveyor for his approval.

5,500,000

INCLUDED

INCLUDED

INCLUDED

Total Carried to Collection

5,500,000

TEST AND SAMPLES After the signing of the Contract the Architect shall be at liberty to call for the submission of samples of materials or the execution of samples of workmanship for approval and for any further samples as are required, until the samples submitted or executed are, in his opinion, satisfactory. Samples 5/4

3,300,000

JFP.30627.MC-RSIB

DN / 82370871.xls

BIll No.1 - Preliminaries Item No.

BILL NO. 1 - P R E L I M I N A R I E S after approval, shall indicate the standard of materials and workmanship to be maintained in the execution of the works.

Rupiahs

The Contractor shall arrange for tests of any materials to be carried out as and when the Architect or Engineer may direct and at such laboratories as instructed. SITE MANAGEMENT AND ESTABLISHMENT COSTS Provide for all on and off site management and establishment costs including cost of Forman-in-Charge referred to in Clause of the Conditions of contract. The Contractor shall submit to the Architect details of the Foreman which he propose to employ for this project. The foreman shall be employed on a full time basis on this project after approval by the Architect. PLANT, TOOLS, MATERIALS, LABOUR, ETC. Provide all necessary plant, tools, materials, labour, etc. necessary for the proper execution of the works. The Contractor is entirely responsible for all labour employed and shall Indemnify the Employer against all obligations and risks. The Contractor must meet all labour regulations in force in the area and provide necessary facilities during the whole period of the contract. The contractor in necessary shall provide sufficient hoisting or lifting plant for proper execution of the works within the programme constraints. Or using the existing sevice lift with keep carefully and maintain as stated in 'Damage To Existing Property' REPORT TO ARCHITECT The Contractor is to deliver daily to the Clerk-of-Works a report as to the number of operatives employed on the works in each trade, etc., and delivery notes for all materials delivered to the site. This is to be done in an approved form of works diary which is to be kept at the job site and accessible to the Architect or his representative for inspection at any working hour and this diary is to be handed over to the Architect on completion of work. SAFE GUARDING THE WORKS Safe guard the Works, materials and plant against damage or theft including all necessary watching and lighting for the security of the Works, and protection of the public, and provide shelter for any watchman and/or security guards so required. INCLUDED 19,250,000 163,711,797

16,500,000

Total Carried to Collection

202,761,797

The Contractor shall be solely responsible for safety of all his own materials and the materials supllied by the Employer, fixed or unifixed, and all the materials of the Contractor or supplier which are under sub-contract to the Contractor. The Contractor must provide security guards or coordinate with site security for a daily 24 hour security system to ensure complete safety of the works and materials. The Employer shall be indemnified by the Contractor for whatever loss due to damage or theft. SCHEDULE OF CONTRACT CLAUSES The Contractor shall allow against each item set out below for any cost involved in complying with the terms of the conditions of contract : Clause No. 1. - Contractor's obligations 2. - Architect's instructions 3. - Contract document 4. - Statutory obligations, notices, fees and charges 5. - Levels and setting out of the works 6. - Materials, goods and workmanship to conform to description, testing and inspection 7. - Royalties and patent rights 8. - Foreman-in charge 9. - Acces for Architect to Works 10. - Clerk-of-Works 11. - Variation, provisional and prime cost sums 12. - Contract Bills 13. - Contract Sum 14. - Unifixed goods and materials 15. - Practical Completion and Defects Liability 16. - Sectional Completion 17. - Assignment or subletting 18. - Injury to persons and property and Employer's indemnity 19. - Insurance against injury to persons and property 20. - Insurance of Work against Fire, etc. 5/5

JFP.30627.MC-RSIB

DN / 82370871.xls

BIll No.1 - Preliminaries Item No.

BILL NO. 1 - P R E L I M I N A R I E S 21. - Possession, completion and postponement 22. - Damages for no-completion 23. - Extension of time 24. - Loss and expense caused by disturbance of regular progress of works 25. - Determination by Employer 26. - Determination by Contractor 27. - Nominated Sub - Contractors 28. - Nominated Suppliers 29. - Arstist and Tradesmen 30. - Cartificates and Payments 31. - Outbreaks of Hostilities 32. - War Damage 33. - Antiquities 34. - Arbitration

Rupiahs

Total Carried to Collection

INCLUDED

OVERTIME AND SHIFTWORK The Contractor is to allow after getting approval from the Employer for any working in shifts and/or overtime and for additional plant, equipment, etc., as, may be necessary for the completion of the works within the stipulated periods. TRANSPORTING MATERIALS Take care in loading and unloading materials for the work that the streets and footpaths are not obstructed or the traffic impeded, and conform with person in charge at the building management regulation for carting, loading and loading all materials plant, earth, etc., to or from the building site. RESPONSIBILITY FOR THE WORKS Keep all persons including those employed by Nominated Contractors and Conrtractors under control and within the boundaries of the site, and be responsible for the care of works generally, and for all works executed and materials deposited on the site by the Contractor and suppliers, together with all risks arising from carelessness of operatieves, damage or loss by theft or any other cause, and make good all such damage or loss, and allow for all necessary watching and protective lighting. SETTING OUT The Contractor is to employ a surveyor approved by the Architect to set out the works. The Contractor is also required to set up leveling which must be tied to an existing level and shall use these level to set out all the works. The marking level positions are to be decided on site and approved by the Architects and must be properly protected. The Contractor will be responsible for the accuracy of all setting out and establishing all levels accurately Any errors in setting out and any consequential loss to the Employer will be made good at the Contractor's expense and to the satisfaction of the Architect. TEMPORARY WORKS Provide, erect and maintain on the site in position directed by the Architect adequate, for use during the execution of this Contract. (a) Consultant's site office and Contractor's site office with separate rooms size 3 x 3 m for all Nominated Sub-Contractors for the storage of materials. (b) Stores for cement and other perishable materials are to have a floor raised above ground level. (c) Sanitary accommodation. (d) Provide other such temporary buildings as may be necessary for the works for carpenters and bar benders, etc. No other temporary buildings will be allowed unless with the written permission of Architect or building management Make proper arrangements for and pay all charges in connection with conservancy. Temporary water and power shall be supplied to the site by Contractor. Total Carried to Collection

INCLUDED

22,000,000

INCLUDED

3,300,000

7,700,000

G H

I J K

33,000,000

TEMPORARY SCREENS Provide, erect and maintain all necessary temporary screens, alter, shift and adapt from time to time as required and clear away on completion. MAINTAIN EXISTING SERVICES Uphold, protect and maintain all existing drains, sewers, water mains, electric cables, telephone cables, and other property of a like nature and make good or pay for making good all damage thereto and any consequential 5/6

INCLUDED

5,500,000

JFP.30627.MC-RSIB

DN / 82370871.xls

BIll No.1 - Preliminaries Item No.

BILL NO. 1 - P R E L I M I N A R I E S damage or loss arising out of such damage, including damage by flooding. Delays to the Contract Period caused by such work shall not be deemed to require time extentions. These delays shall be absorbed in the Contract Period. CLEARING OF SITE Any demolished materials should be put into sacks and removed from the Project location in a timely manner as they should not be allowed to accumulate. Clear up and remove all rubbish and debrish from the site at regular intervals or as directed by the Architect. On completion of the work, clear up and remove from the site all rubbish, debrish, plant, surplus materials except those materials ordered to be left on site At all stages of the works the Contractor shall be responsible for maintaining the site in a clean and orderly fashion at all time. The Contractor shall be responsible for the daily removal of all rubbish and debris resulting from the above and he shall maintain a safe and clean site for all workman at all times. Should the Contractor fail to maintain the work in a timely and orderly manner to the detriment of the works or to standards acceptable, the Employer may employ such persons considered necessery to clean up the works, and the cost of such persons together with the costs of all necessery plant and equipment will be born by the Contractor or deducted from monies due to the Contractor in interim progress payment. SHOP DRAWINGS Before commencing fabrication or manufacture of any prefabricated or off site manufactured item the Contractor shall submit shop drawings of the item indicating all details and dimensions. The Contractor shall not commence manufacture until the shop drawings have been approved and signed by the Architect. The signing of such drawings by the Architect shall not relieve the Contractor of the responsibility for the correctness of all dimensions.

Rupiahs

27,500,000

1,100,000

1,100,000

Total Carried to Collection

35,200,000

AS BUILT DRAWING As soon as possible or maximum 30 (thirty) days after the construction of the work have already finished completely, the Contractor shall issue two copies blue print of the as built drawing which showing all deviation made during the executive and send to the Architect/Consulting Engineer for their approval. After approved by the Architect/Consulting Engineer, the Contractor shall issue four copies of the blue print and one tranparant paper print to be submitted to the Architect for the distribution in bundle. INSURANCE Provide Insurance Cover against the following with the Insurance Company approved by the Employer, CONTRACTORS ALL RISK INCLUDING PUBLIC LIABILITY COVER

3,300,000

25,300,000

Contractors all risk including Public Liability Cover. i. Works Loss or damage to the Contract Works caused by any of the following perils : Strom, tempest, hurricane, cyclone, typhoon, tidal wave, flood inundation, landslide, rockslide, subsidence, earthquake, fire lightning and explosion, external accidental damage from any cause, loss or damage consequent upon the use of faulty or unsuitable material, faulty or bad workmanship, faulty design, (excluding the cost of replacing defective parts which caused the accident). Loss or damage to works material caused by burglary, theft, sabotage, violence, etc. Removal of debris resulting from the above. ii. Third Party Liability Rp 500.000.000.- any one accident unlimited in period. WORKMAN'S COMPENSATION INSURANCES The Contractor is solely liable for accidents or injuries to work people on 5/7

INCLUDED

INCLUDED

JFP.30627.MC-RSIB

DN / 82370871.xls

BIll No.1 - Preliminaries Item No.

BILL NO. 1 - P R E L I M I N A R I E S site, travelling to and from site and at temporary yards.

Rupiahs

The Employer shall not be liable for or in respect of any damages for compensation under the Fatal Accident Ordinance, the Workmen's Compensation Ordinance or at Common Law by or in consequence of any accident or injury to any workman or other person whether in the employment of the Contractor or any Sub-Contractor and the Contractor shall indemnity and keep indemnified the Employer againts all claims, demands, proceedings, costs, charges and expense whatsoever in respect thereof or in relation thereto.

Total Carried to Collection

28,600,000

WORKMAN'S COMPENSATION INSURANCES (Cont'd) Maintain and cause every Sub-Contractor to maintain such insurances as are necessary to cover all liability in respect of all workmen and other persons who may be employed on the works including paying all costs. The workmen's compensation insurances are to be taken out with the Insurance Broker or Company to be approved by the Employer and the policies and receipts are to be deposited with the Employer prior to commencement of the work. The policies are to cover the period from the commencement of the contract until the end of the Defects Liability period and until further work of any kind is being carried out. ORDERING MATERIALS Place order for specified materials at the earliest possible date after notification of award of this Contract or at such times as may be specifically state elsewhere herein for any particular materials. TEMPORARY YARDS Arrange for and lease temporary yards as may be required until such times as sheds and stores may be transferred to the site and sufficient working areas are available on the site or lease temporary yards for the duration of the Contract whichever is considered the more convinient. CONTRACTOR TO PROVIDE ALL THINGS NECESSARY Provide all necessary hoists, ladders, scaffolding, staging, tackle, tarpaulins, tools and other plant (mechanical or otherwise) and allow for all labour and materials in installing, operating, moving, adapting and maintaining same as necessary. Provide all necessary transport to and from the site for labour, materials,plant,etc.,for the execution and completion of the works. PROGRAMME OF WORKS/CRITICAL PATH CHART Within fourteen (14) days after acceptance of his tender the Contractor shall submit to the Architect a BAR CHART Programme and Man Power Schedule of all works including nominated sub contractors and supplier's works. As soon as possible but not exceeding 3 weeks after commencement of work the contractor shall submit a CRITICAL PATH CHART for the programme. The CHART shall be revised, modified and adjusted as required to suit his works plan but shall conform to the stipulated completion dates. The Contractor shall discuss and adjust his programme proposals with Architect. Once adjusted they shall not be departed from without the written approval of the Architect The programme shall be planned for early completion of Building, with finishing from top, down to level 1

INCLUDED

INCLUDED

INCLUDED

INCLUDED

INCLUDED

Total Carried to Collection

INCLUDED

PROTECTION OF WORK Cover up and protect all the works and materials from the weather and other possible demage and suspend all operations during weather which, in the Architect's opinion shall be detrimental to the works. Case up, cover up and the like during the execution of the works and make good any damage caused by such want of protection until the Employer takes possession after Practical Completion and thereafter also until the Final Certificates is issued if any damage is done by the Contractor's employees or representatives. Extra care and caution to be exercised in regard to manufacturers or Specialists protective wrappings. Such wrapping shall only be remove at final cleaning up of the Building. 5/8

27,500,000

JFP.30627.MC-RSIB

DN / 82370871.xls

BIll No.1 - Preliminaries Item No.

BILL NO. 1 - P R E L I M I N A R I E S

Rupiahs

JOB CONFERENCES Site meetings will be held between the Employer's representative, the Architec, Consultants, Contractor and Sub-Contractors at intervals of one week or more or as directed by the Architect. The purpose of these meetings is to assist in attaining full co-operation between all concerned on the job as well as checking the progress of the works. Minutes will be kept by the Builder or by such parties as may be so directed. All necessary accommodation and facilities for the meeting will be provided by the Contractor in the site office. PHOTOGRAPHS Engage and pay an approved photographer to take six (6) nos 6"x4" photographs from view points selected by the Architect each month during the progress of works. Supply four (2) prints of each photograph to the Architest endorsed with the name of the works and the date of photographing. HOURS OF WORK The hours of work shall be between 8 am to 5 pm Monday to Saturday, however between the hours of 8 am to 9 am and after 4 pm non noisy work only shall be carried out. NO NIGHT OR HOLIDAY WORK The Contractor shall state whether or not he intends to do overtime works unless otherwise subject to any provision to the contrary contained in the Contract none of the permanent works shall save hereinafter provided be carried out during the night or on the gazetted day of rest without the permission in writing of the Architect or his representative expect where work is unavoidable or absolutely necessary for the saving of life or property, or for the safety of the works in which case immediately notify the Architect or his representative. Provide always that the provisions of this clause shall not be applicable in the case of any work normally carried out by ratary or double shifts. Holiday works will be permitted on written application.

INCLUDED

1,100,000

INCLUDED

INCLUDED

Total Carried to Collection

28,600,000

OVERTIME & BONUS PAYMENT The Contractor shall allow for overtime payment if he causes his workmen to work overtime with the written permission of the Architect, in order to complete the works in accordance with his programme and completion dates. All overtime payments to Clerk-of Works and Employer's supervisory staff caused by such overtime work shall be borne by the Contractor. COST OF SAMPLES All samples shall be supplied by the Contractor at his own cost if the supply thereof is clearly intended by or provided for in the Bills if not, then at the cost of the Employer. Approved samples shall be displayed on site as minimum standards of materials and workmanship which will be permitted for this Contract. Make due allowance of time for presentation, inspection and possible rejection of samples. Time extensions will not be entertained on this account. DUST PREVENTION Make adequate provision by spraying, erecting screens or other suitable methods including regularly cleaning out all rubbish and debris at daily intervals againts any nuisance or demage by dust and debris to all work under this Contract or to persons and property in the vicinity and take responsibility for any complaints demage or claim in connection herewith. COST OF TESTS The cost of making any test shall be borne by the Contractor if such test is clearly intended by or provided for in the Bills and (in the cases of test under loads or of a test to ascertain whether the design of any finished or partially finished work is appropriate for the proposes which it was intended to fulfil) is particularised in the Bills in sufficient detail to enable the Contractor to price or allow in his rates. If any test is ordered by the Architect which is either (a) not so intended by or provided for, or (b) (in the cases above mentioned) is not so particularized, or (c) though so intended or provided for, is ordered by the Architect to be carried out by an independent person at any place other than the site or the place of manufacture or fabrication of the material tested, then the

INCLUDED

INCLUDED

INCLUDED

INCLUDED

JFP.30627.MC-RSIB

5/9

DN / 82370871.xls

BIll No.1 - Preliminaries Item No.

BILL NO. 1 - P R E L I M I N A R I E S cost of such test shall be borne by the Contractor if the test shows the workmanship or materials not the Architect's instruction but otherwise by the Employer. GUARANTEES On behalf of the Employer obtain written guarantees from all sub-contractors or suppliers and deliver such guarantees to the Architects before issue of Certificate of Practical Completion.

Rupiahs

INCLUDED

Total Carried to Collection

INCLUDED

GUARANTEES (Cont'd) The guarantees shall cover the Employer againts all faulty materials and/or workmanship for the periods particularly stated. Where no period is stated the guarantee shall be one (1) year. All guarantee periods shall commence from the date of completion or handing over of building to Employer. ERROR CORRECTIONS Should the Contractor make any errors in his extensions and/or total, such errors shall be so rectified and adjusted that, when correctly calculated, the total of the Final Summary shall represent the same amount as that tendered by the Contractor in Form of Tender. The next aggregate amount of such errors, whether a net deduction or a net eddition, will be calculated as a percentage of the total of the Final Summary of the Bills of Quantities and all unit rates through out the BIlls of Quantities shall be subject to such percentage increase or decrease as the case may be. Provided always that Provisional or Prime Cost Sums shall be excluded from the calculation and shall not be subject to such percentage adjustment. CONTRACTOR'S SITE AGENT The contractor shall employ and constantly keep upon the works for the entire contract period a competent site engineer of approved qualification to be approved by the Architect. CONTROL OF WORKERS The contractor must ensure that all workers employed by him and the nominated sub contractors are strictly confined within the building site. When it is necessary for the workers to enter the premises of the adjoining existing building for execution of work, written permission must be obtained from the Employer's representative. The contractor shall remove from the site any worker who in the opinion of the Architect misconducts himself or is considered undesirable. GENERAL ATTANDANCE UPON ALL TRADES Allow for the general attendance of one trade upon another. VALUE ADDED TAXES Provision shall be made in the prices for all value added taxes enforced under law for the duration of the contract. Indemnify the Employer against all claims for value added taxes. LIGHTING AND POWER Provide all adequate lighting and power for the works with all temporary wiring and meters; and alter, adapt and maintain as necessary, and pay all charges in connection with same. On completion, disconnect and remove all temporary connections as required. Adequate lighting shall be provided by the Contractor to all other work areas. INCLUDED INCLUDED

INCLUDED

INCLUDED

INCLUDED

22,000,000

Total Carried to Collection

22,000,000

POWER FOR TESTING OF AIRCONDITIONING AND SERVICES Apply for, profide and pay for all necessary power, lighting and cabling, etc., for testing of airconditioning Permanent connection and Public Utilities Board demand charges will be borne by the Employer. TELEPHONE Provide telephone line to the Contracctor's site office and pay all charges in connection with same for installation and expenses during execution of the works. Arange and pay for disconnection and removal on completion of Contract. SCAFFOLDING The Contractor shall provide and maintain all scaffolding including planks, battens, catwalks, gangways, ladders, etc., necessary for carrying out of this 5 / 10

INCLUDED

3,300,000

22,000,000

JFP.30627.MC-RSIB

DN / 82370871.xls

BIll No.1 - Preliminaries Item No. contract. D E Scaffolding shall be of the type approved by the relevant authorities at all times Scaffolding shall be taken down and removed only on the written instruction of the Architect. BARRICADES The contractor shall erect and maintain barricades during the contract period and pay all charges in connection therewith. No advertisement, poster and the like shall be affixed or exhibisted on the hoardings unless otherwisse authorised and directed by Architect. HEALTH AND WELFARE Provide for all costs incurred by complying with all health and welfare regulations including such regulations which may be enforced from time to time during the currency of the contract, pertaining to worksites and workpeople employed thereon. CLEANING BUILDING ON COMPLETION Clean thoroughly all floors, pavings and wall finishes, windows, doors and glass (inside and out), touching up painted or polished work, sanitary fittings, ventilators, light fittings and mechanical equipment, drains, rainwater goods, replace and remove all damaged work and leave the whole of the premises and surrounding grounds on practical completion to the complete satisfaction of the Architect. SAFETY During the currency of the contract, maintain safety precautions in accordance with the regulations of the relevant authorities. The contractor must provide on the site first aid equipment and crash helmets for site personnel, consultants and such authorised visitors who may be on site from time to time. Total Carried to Collection 29,150,000 INCLUDED INCLUDED

BILL NO. 1 - P R E L I M I N A R I E S

Rupiahs

INCLUDED

3,850,000

TEMPORARY FIRE EXTINGUISHERS The contractor shall provide portable fire extinguishers as approved, to be fixed at various locations to be decided by the Architect. The fire extinguishers shall be 2 gallon soda acid type type and fully charged and ready for instant use at all times. The extinguishers are not to be removed unless with the Architect's instructions. The extinguishers shall remain the property of the contractor. When flammable combustible materials are to be stored or used the contractor shall provide protective coverings and to adhere strictly to any instructions given by the Architect concerning the storage of such combustible materials. COMPLETION TESTS Properly ease all doors and casements, remove, oil and replace all locks, latches, hinges, etc., and adjust all ironmongery. Test all services for proper operation and all cocks, valves, switchgear and moving parts must be tested and adjusted. On practical completion leave all equipment and moving parts to the complete satisfaction of the Architect. GENERAL The contractor's attention is drawn to certain construction procedure and alternative methods of construction as suggested by the Engineer and shall be allow herein any expenses involved in complying with same. FLUCTUATION IN BASIC PRICES (NOT APPLICABLE)

INCLUDED

B C

INCLUDED

INCLUDED

F G COMPLIANCE WITH LOCAL AUTHORITIES The Contractor must strictly adhere to the following health requirements, and shall allow here whatever cost involved for conforming to such requirements. Any see pages exposed and/or created and all other mosquito breeding places arising from the earth works and/or construction works should be underdrained or otherwise dealt with at the expense of the developer/contractor to the satisfaction of the Commissionir of Public Health. The Contractor shall undertake to prevent the incidence of earth littering/froppings from earth moving vebicles. In the event of earth littering/droppings occuring on public roads/drains, such earth shall be removed by them at their own expense to the satisfaction of this Department. The Contractor is to conform to all other rules and requirements as issued by the relevant local Authorities. 5 / 11 INCLUDED

JFP.30627.MC-RSIB

DN / 82370871.xls

BIll No.1 - Preliminaries Item No.

BILL NO. 1 - P R E L I M I N A R I E S

Rupiahs

SITE VERIFICATION OF DIMENSIONS Contractor shall verify all dimensions on site, and resolve all discrepancies with the Architect/Engineer before beginning work.

INCLUDED

Total Carried to Collection

INCLUDED

SERVICES MANUALS On complettion of this contract provide line drawings of all services showing location of valves, runs, etc., together with any service manuals of equipment installed. Two copies of drawings and manuals shall be forwarded to the Architect one month after date of practical completion. NOMINATED SUB-CONTRACTORS The definition of the term "Nominated Sub-Contractor" shall be a Contractor nominated by the Architect and employed by the Employer for the execution of work of a specialist nature under the direction of the Main Contractor. Tenderers are advised to visit the Architect or Construction Cost Consultants office by prior appointment to study the Contract Documents and Drawings for the Nominated Sub-Contractors Work and thoroughly accquaint themselves with the Conditions of Nominated Sub-Contract. MAIN CONTRACTOR'S RELATIONSHIP TO NOMINATED SUB-CONTRACTORS The Main Contractor shall be fully responsible for the whole of the Contract Works including work executed by Nominated Sub-Contractor nominated by the Architect and employed by the Employer concurrently with the Main Contractor The Main Contractor shall be responsible for ensuring that all Nominated SubContract Works are properly programmed, executed and completed within the contract period for the Main Contract Works. No extensions of the contract period shall be allowable in respect of delay by Nominated SubContractors for any reason whatsoever. All instructions given by the Architect to the Main Contractor referring to the work of the Nominated Sub- Contractor shall be forwarded directly to the Nominated Sub-Contractors without delay and the Main Contractor shall ensure that the instructions are carried out promptly. MAIN CONTRATCOR'S GENERAL ATTENDANCE UPON SPECIALIST CONTRACTORS The Main Contractor shall allow for providing the following general attendance upon the Nominated Sub-Contractor's contract : a) Access for, and facilitating the unloading and taking to store of plant, materials and equipment, providing look-up storage space and working space and facilitating the taking from store and distribution of materials and equipment about the works. b) Free and reasonable use of the Main Contractors plant, particularly hoists and cranes, scaffolding, gantries, ladders, etc. c) Power, lighting, water and other temporary facilities specifically required for the Specialist Contractor Works including facilities for testing and commissioning completed nominated sub-contract works. Total Carried to Collection

INCLUDED

INCLUDED

INCLUDED

INCLUDED

INCLUDED

d) Planning and co-ordinating and organising the execution of the Main Contractor's and all Nominated Sub-Contractors work so as to ensure the correct sequence and timing of all the operations and completion of the works on schedule. Nominated Sub-Contractorss must inspect the Main Contractors programme and signify their agreement to its contents, in writting, having particular regard to the completion times shown for their own sub-contract works. e) The use of mess rooms, sanitary accommodation and welfare facilities and the provision of site office accommodation f) Covering up and protecting all the Nominated Sub-Contractorss completed works as the works proceed, watching and provising security against theft and damage until the work is handed over to the Employer. g) Clearing away rubbish and the like as required during and upon
JFP.30627.MC-RSIB

5 / 12

DN / 82370871.xls

BIll No.1 - Preliminaries Item No.

BILL NO. 1 - P R E L I M I N A R I E S completion of the works. PAYMENTS TO NOMINATED SUB-CONTRACTORS At the time of every valuation of the Works for certificate purposes for the Nominated Sub-Contractors, the Main Contractor shall sign the Nominated SubContractor's application before each Nominated Sub-Contractors. Each application will showing of : a) The gross amount claimed in the current application. b) The amount received to date The application of Nominated Sub-Contractors will not be considered unless such statements has been signed by the Main Contractor. The Architect will thereafter issue separate certificates to each Nominated SubContractor. DIRECT PAYMENTS TO NOMINATED SUB-CONTRACTORS All certificates for the Nominated Sub-Contract Works, shall be issued by the Architect to the Main Contractor who will forward the certificate to the Nominated Sub-Contractor. Upon presentation of the Certificate to the Employer by the Nominated SubContractor the Employer will make payment direct to the Nominated Sub-Contractor.

Rupiahs

INCLUDED

INCLUDED

Total Carried to Collection

INCLUDED

NOMINATED SUB-CONTRACT PROCUREMENT CONTRACTS The supply of certain imported materials and equipment required for certain of the Specialist Contract Works may be arranged under Procurement Contracts entered into by the Nominated Sub-Contractor and the Employer in order that facilities available to the Employer are obtained. The existance of such Procurement Contract shall not effect the Nominated Sub-Contractors constructural obligation and responsibilities to the Main Contractor. The Employer undertakes to disclose to, and obtain the agreement of, the Main Contractor to all relevant programming details in respect of Procurements Contract however, it is a condition of this Contract that the Employer shall not be liable to the Main Contractor for any consequences arising out of the Nominated Sub-Contractors performance of Procurement Contracts. PERFORMANCE BOND The Contractor shall provide a performance bond equal to 5 % of the awarded sum in the form of a Banker's guarantee and in the format as shown in the Appendix of this document. Other form of guarantee is not acceptable. FIRE PREVENTION Due to the fire hazard inherent in plywood/timber and fiber reinforced paint, the Contractor shall warn and responsible for his workmen (including those employed by nominated sub-contractor) that smoking is prohibited at all time within the confine of or at job site. The use of welding or torch cutting equipment or flame heating equipment in the above hazardous location shall only be done by prior permission of, and subject to the supervision of the Development Manager. PRICES Rates and prices for all items in the Bills must include for all necessary ordinary outting, waste, labour, hoists, tools, takle, good sufficient, nails, screws, spikes, plugs, glue, putty, tow, solder, carting, hauling, transporting, unloading, storing, crating, hoisting, raking, framing, fitting, fixing and setting complete together with all supervision, profit and establisment charges. All rates and prices unless stated as provisional shall remain fixed for the duration of this contract. The basis of evaluating new rates shall be calculated by inference, pro-rate or reference to other similar items in these Bills of Quantities.

INCLUDED

INCLUDED

INCLUDED

INCLUDED

JFP.30627.MC-RSIB

5 / 13

DN / 82370871.xls

BIll No.1 - Preliminaries Item No.

BILL NO. 1 - P R E L I M I N A R I E S

Rupiahs

Total Carried to Collection

INCLUDED

COLLECTION Page 5 / 1 Page 5 / 2 Page 5 / 3 Page 5 / 4 Page 5 / 5 Page 5 / 6 Page 5 / 7 Page 5 / 8 Page 5 / 9 Page 5 / 10 Page 5 / 11 Page 5 / 12 Page 5 / 13 Page 5 / 14 Page 5 / 15 Page 5 / 16 Page 5 / 17 Page 5 / 18 Page 5 / 19 Page 5 / 20 INCLUDED INCLUDED INCLUDED 11,000,000 34,650,000 5,500,000 202,761,797 INCLUDED 33,000,000 35,200,000 28,600,000 INCLUDED 28,600,000 INCLUDED 22,000,000 29,150,000 INCLUDED INCLUDED INCLUDED INCLUDED

BILL NO. 2 - P R E L I M I N A R I E S Carried to Final Summary Rp. 430,461,797

JFP.30627.MC-RSIB

5 / 14

DN / 82370871.xls

Bill No. 2 - Structure Works

Item No.

BILL NO. 2 STRUCTURE WORKS

2.1 - FRAME & UPPER FLOOR

Qty

Unit

Rate

Rupiahs

Concrete works Vibrated reinforced concrete fc 30 Mpa A Column Vibrated reinforced concrete fc 25 Mpa B C D Suspended beams Suspended slabs 200mm thick Ditto but 175mm thick Bar reinforcement; high tensile steel BJTD-40 deformed E F G H I J K L M N O P Q General reinforcing bars in columns, 25mm diameter Stirrups in columns, 10mm diameter General reinforcing bars in suspended beams, 25mm diameter Ditto, 19mm diameter Ditto, 16mm diameter Ditto, 10mm diameter Stirrups in beams, 13mm diameter General reinforcing bars in suspended beams, 16mm diameter Trimmers, 16mm diameter Dowels, 19mm diameter General reinforcing bars in suspended slabs, 13mm diameter Dowel in slabs, 16mm diameter Ditto, 25mm diameter Sundries R S HILTI HIT HY-150 Demolish exisiting column stump and lean concrete, chipping to exisiting slab top reinforcement 487 3.33 No m3 85,800 110,000 41,784,600 366,300 4,423.00 1,303.00 3,418.32 789.45 1,039.60 2,474.99 785.67 23,437.66 32.86 665.72 3,309.74 36.34 138.70 kg kg kg kg kg kg kg kg kg kg kg kg kg 7,670 7,670 7,670 7,670 7,670 7,670 7,670 7,670 7,670 7,670 7,670 7,670 7,670 33,924,410 9,994,010 26,218,514 6,055,082 7,973,732 18,983,173 6,026,089 179,766,852 252,036 5,106,072 25,385,706 278,728 1,063,829 72.40 185.68 2.27 m3 m3 m3 788,320 788,320 788,320 57,074,368 146,375,258 1,789,486 29.70 m3 714,510 21,220,947

To Collection

Rp.

589,639,193

Formworks A B C D E F Sides of rectangular columns Ditto but square columns Sides and soffit of beams Soffit of slabs; exceeding 3500mm Edge of slabs not exceeding 200mm high, 200mm high Ditto, 175mm high 284.79 5.27 340.14 964.42 94.00 29.00 m2 m2 m2 m2 m m 68,790 68,790 79,430 63,770 12,754 12,754 19,590,704 362,523 27,017,320 61,501,063 1,198,876 369,866

To Collection

Rp.

110,040,353

COLLECTION

Page No. 6 / 1

589,639,193

Page No. 6 / 2

110,040,353

JFP.30627.MC-RSIB

6/1

DN / 82370871.xls

Bill No. 2 - Structure Works

Item No.

BILL NO. 2 STRUCTURE WORKS

2.1 - FRAME & UPPER FLOOR

Qty

Unit

Rate

Rupiahs

BILL NO. 2.1 - FRAME AND UPPER FLOOR Carried to Summary at end of Bill No. 2 Rp. 699,679,546

JFP.30627.MC-RSIB

6/2

DN / 82370871.xls

Bill No. 2 - Structure Works Item No. BILL NO. 2 STRUCTURE WORKS

2.2 - ROOFS

Qty

Unit

Rate

Rupiahs

The following steel structure including all site welding,fabricating, assembling, cutting, drilling, bolting and fixing in position and all necessary completion structural steel work with prime coating 2 times and finish paint 1 time (as shown on Dwg No. S2-104) A B C D E F G H I J K L M N O P Q Rafter beam, WF 250x125x5x8mm (code : R1) Ditto, WF 400x200x8x13mm (code : R1(R ) ) Ditto, WF 400x200x8x13mm (code : R2) Ditto, WF 450x200x9x14mm (code : R3) Ditto, WF 200x100x5.5x8mm Purlin, C 100x50x20x1,6mm Ditto, UNP 200x80x7.5mm Sag rods, 12mm diameter Wind bracing, 19mm diameter Turn buckle, 19mm diameter M16 ramset chemset masonry anchors Stiffeners, 12mm thick Ditto, 8mm thick High Tensile Anchor bolt; 19mm diameter Ditto; 16mm diameter Ditto; 12mm diameter Trusses span 14500mm (refer to Roof Steelwork Plan Dwg. No. 088045-S15 - grid line 11,12/E-G) Kolom Sc 1 HB 200 x 200 x 8 x 12 Purlin CNP 200 x 75 x 20 x 3,2 Plate copel t = 16 mm ( u/ rafter) Sagrod L 65 x 65 x 6 Anchor bolt dia 20 mm 2,664.00 7,260.00 5,676.00 5,776.00 170.64 1,074.48 2,170.96 106.80 642.24 24 16 791 834.28 374 106 1,624 2 kg kg kg kg kg kg kg kg kg No No kg kg No No No No 12,947 12,947 12,947 12,947 12,947 13,167 12,947 17,765 14,465 47,644.3 76,230 12,243 12,243 7,623 6,352.5 3,176.8 34,490,808 93,995,220 73,487,172 74,781,872 2,209,276 14,147,678 28,107,419 1,897,302 9,290,002 1,143,463 1,219,680 9,685,682 10,214,090 2,851,002 673,365 5,159,123 INCLUDED

R S T U V

798.72 13,256.10 345.40 709.20 32.00

kg kg kg kg No

13,717 13,167 13,860 14,069 41,927

10,956,042 174,543,069 4,787,244 9,977,735 1,341,648

To Collection

Rp.

564,958,892

0.5mm thick 'Spandek Hi-Ten' metal roofing with zincalume/ approved finish fixed to steel purlins (measured nett-no allowance made for laps), including daily housekeeping/ sweeping metallic debris which may corrode finishing. All fixing screws used shall be stainless steel. A To roof cover 0.25 thick polyglass glasswool insulation with density 32kg/m3 complete with single aluminium foil and wire net fixed to steel purlins B Below roof cover Aluminium sheet flashing ( Gauge 18 , minimum 400mm and maximum 540mm girth once bent) and fixed to steel purlins C Ridge capping 10m thick glassfibre reinforced cement fixed to steel purlin and tight with 12mm steel anchor as shown on drawing no. A724 - section 6, including all necessary fixing accessories and finishing as specified D Glassfibre gutter; 980mm girth 91.20 m 831,600 75,841,920 159.20 m 104,500 16,636,400 1,494.92 m 47,644 71,224,417 1,494.92 m2 156,272 233,613,391

To Collection

Rp.

397,316,128

JFP.30627.MC-RSIB

6/3

DN/82370871.xls/Bill No 2.2

Bill No. 2 - Structure Works Item No. BILL NO. 2 STRUCTURE WORKS

2.2 - ROOFS

Qty

Unit

Rate

Rupiahs

COLLECTION

Page 6 / 3

564,958,892

Page 6 / 4

397,316,128

BILL NO. 2.2 - ROOF Carried to summary at and of Bill No. 3

Rp.

962,275,020

JFP.30627.MC-RSIB

6/4

DN/82370871.xls/Bill No 2.2

Bill No. 2 - Structure Works

Item No

BILL NO. 2 STRUCTURE WORKS

SUMMARY

Unit

Rate

Rupiahs

SUMMARY

BILL NO. 2.1 BILL NO. 2.2

FRAME AND UPPER FLOOR ROOFS

Rp. Rp.

699,679,546 962,275,020

BILL NO. 2 - STRUCTURAL WORKS Carried to Final Summary Rp. 1,661,954,566

JFP.30627.MC-RSIB

6/5

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL WORKS

3.1 - DEMOLITION WORKS

Qty

Unit

Rate

Rupiahs

Demolish existing works, remove material and debris out site, make good and clean disturbed surfaces to receive new works A B C D E F G H I J To brickwall; level 1 Ditto; level 2 To doors; wooden doors Ditto; steel doors Ditto; aluminium glass doors To ceiling finishes; gypsumboard at level 1 Ditto; gypsumboard at level 2 To floor finishes; ceramic tile at level 1 Ditto; ceramic tile at level 2 To existing roof cover 1,590 422 101 3 1 1,273 533 1,834 546 776 m2 m2 No No No m2 m2 m2 m2 m2
16,500 16,500 55,000 77,000 77,000 11,000 11,000 16,500 16,500

26,235,000 6,963,000 5,555,000 231,000 77,000 14,003,000 5,863,000 30,261,000 9,009,000 4,266,900

5,500

BILL NO. 3.1 - DEMOLITION WORKS Carried to summary at and of Bill No. 3

Rp.

102,463,900

JFP.30627.MC-RSIB

7/1

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 UPPER STRUCTURE

3.2 - EXTERNAL WALLS

Qty

Unit

Rate

Rupiahs

LEVEL 1 Brickwork in cement and sand (1:3) mortar complete with reinforcement, lintels, siffeners, anchorage latching and accessories as described A Walls, 150mm thick Plaster in cement and sand ( 1:3 ) mortar smooth finishes with cement coating B 25 mm thick to walls and columns Prepare and apply three coats of ICI or equal approved weathersield paint and in accordance with manufacturer's written instructions C To wall and column (code : PT 1) 12mm thick glassfibre reinforced concrete complete with and including stiffeners, finishing joint filler,beads,gasket & silicone sealant fixed to steel L50x50x5mm framing and all necessary fixing and in accordance with the manufacturer's instruction D External cladding LEVEL 2 Brickwork in cement and sand (1:3) mortar complete with reinforcement, lintels, siffeners, anchorage latching and accessories as described E Walls, 150mm thick Plaster in cement and sand ( 1:3 ) mortar smooth finishes with cement coating F 25 mm thick to walls and columns Prepare and apply three coats of ICI or equal approved weathersield paint and in accordance with manufacturer's written instructions G To wall and column (code : PT 1) 373 m2 20,350 7,590,041 373 m2 47,790 17,824,475 373 m2 87,990 32,818,070 55 m2 605,000 33,275,000 41 m2 20,350 834,350 m2 INCLUDED m2 INCLUDED

To Collection

Rp.

92,341,937

LEVEL 3 Brickwork in cement and sand (1:3) mortar complete with reinforcement, lintels, siffeners, anchorage latching and accessories as described A Walls, 150mm thick Plaster in cement and sand ( 1:3 ) mortar smooth finishes with cement coating B 25 mm thick to walls and columns Prepare and apply three coats of ICI or equal approved weathersield paint and in accordance with manufacturer's written instructions C To wall and column (code : PT 1) 610 m2 20,350 12,413,500 610 m2 47,790 29,151,900 610 m2 87,990 53,673,900

JFP.30627.MC-RSIB

7/2

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 UPPER STRUCTURE

3.2 - EXTERNAL WALLS

Qty

Unit

Rate

Rupiahs

To Collection

Rp.

95,239,300

COLLECTION

Page 7 / 2

92,341,937

Page 7 / 3

95,239,300

BILL NO. 3.2 - EXTERNAL WALLS Carried to summary at and of Bill No. 3 Rp. 187,581,237

JFP.30627.MC-RSIB

7/3

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL WORKS STEEL DOORS

3.3 - DOORS & WINDOWS

Qty

Unit

Rate

Rupiahs

Supply and install 'Bostico' 55mm thick steel doors leaves and 150mm thick frame as radiation steel door including one side plumb fixed inside complete all with factory paint finish including all necessary fixing accessories as shown on drawing no. 30627-A600 to A603 and 30627-A604 sec 5 and as specified A Single door single swing; overall size 800mm x 2150mm (kode : D9/1RD) Ditto; overall size 900mm x 2150mm (kode: D10/1RD) Double door equal leaf double swing; overall size 1600mm x 2150mm high (kode : D16E/1RD) WOODEN DOORS Supply, assemble, set and install 40mm thick solid core flush door consist of 3mm thick sungkai plywood covered both sides on 9mm plywood backing complete with stain finish including all necessary fixing accessories as shown on drawing no. 30627A600 to A603 and as specified D Single door single swing; size 700mm x 2100mm high (kode : D8/1SC) Single door single swing, with kick plate 80x20 (m.s); size 800mm x 2100mm high (kode : D9/1SC) Ditto but only kick plate; size 800mm x 200mm Single door single swing, with view panel 60x60 (m.s); size 800mm x 2100mm high (kode : D9/2SC) Ditto but only 6mm thick float clear glass including necessary framing; size 600mm x 600mm Single door single swing, with view panel 20x30 (m.s); size 800mm x 2100mm high (kode : D9/6SC) Ditto but only 6mm thick float clear glass including necessary framing; size 200mm x 300mm Single door single swing, with view panel 25x165 (m.s); size 800mm x 2100mm high (kode : D9/7SC) Ditto but only 6mm thick tempered clear glass including necessary framing; size 250mm x 1650mm Single door single swing, with kick plate 90x20 (m.s); size 900mm x 2100mm high (kode : D10/1SC) Ditto but only kick plate; size 900mm x 200mm 9 No. 2,497,000 22,473,000 1.51 2,239,834 2 No. 27,253,188 54,506,375 1.72 21,390,583

B C

1 2

No. No.

28,292,688 44,324,500

28,292,688 88,649,000

1.94 3.44

19,739,084 17,394,789

26

No.

2,497,000

64,922,000

1.68

2,006,518

F G

26 1

No. No.

825,000 2,497,000

21,450,000 2,497,000

0.16 1.68

6,960,938 2,006,518

No.

110,000

110,000

0.36

412,500

No.

2,497,000

4,994,000

No.

82,500

165,000

No.

2,497,000

12,485,000

No.

214,500

1,072,500

17

No.

2,497,000

42,449,000

17

No.

825,000

14,025,000

To Collection

Rp.

358,090,563

WOODEN DOORS (Cont'd) Supply, assemble, set and install 40mm thick solid core flush door consist of 3mm thick sungkai plywood covered both sides on 9mm plywood backing complete with stain finish including all necessary fixing accessories (cont'd) A Single door single swing,with buffer plate 110x85 and clear float glass 20x30 (m.s); size 900mm x 2100mm high (kode:D12/6SC) Ditto but only buffer plate; size 1100mm x 850mm Ditto but only 6mm thick float clear glass including necessary framing; size 200mm x 300mm Double door equal leaf double swing, with 6mm thick tempered clear glass 25x165 (m.s); size 1300mm x 2100mm high (kode : D14E/7SC) Ditto but only 6mm thick tempered clear glass including necessary framing; size 250mm x 1650mm (2 No) Double door equal leaf double swing, with 6mm thick tempered clear glass (m.s); size 1400mm x 2650mm high (kode:D15E/7SC) Ditto but only 6mm thick tempered clear glass including necessary framing; size 550mm x 700mm (2 No) and size 550mm x 1540mm (2 No) Double door equal leaf double swing, with buffer plate 110x85 and float clear glass 15x60 (2 No) (m.s); size 1500mm x 2650mm high (kode: D16E/3SC) 14 No. 3,047,000 42,658,000

B C

14 14

No. No.

1,100,000 82,500

15,400,000 1,155,000

No.

5,236,000

5,236,000

No.

214,500

214,500

No.

5,236,000

5,236,000

No.

948,640

948,640

No.

5,236,000

20,944,000

JFP.30627.MC-RSIB

7/5

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL WORKS

3.3 - DOORS & WINDOWS

Qty

Unit

Rate

Rupiahs

I J

Ditto but only buffer plate; size 1100mm x 850mm Ditto but only 6mm thick float clear glass including necessary framing; size 150mm x 600mm (2 No) Double door equal leaf double swing, with 6mm thick tempered clear glass (m.s); size 1500mm x 2650mm high (kode:D16E/7SC) Ditto but only 6mm thick tempered clear glass including necessary framing; size 550mm x 700mm (2 No) and size 550mm x 1540mm (2 No) Double door equal leaf double swing, with 6mm thick tempered clear glass (m.s); size 1500mm x 2100mm high (kode: D16E/7SC) Ditto but only 6mm thick tempered clear glass including necessary framing; size 250mm x 1650mm (2 No)

4 4

No. No.

2,200,000 165,000

8,800,000 660,000

No.

5,236,000

5,236,000

No.

948,640

948,640

No.

5,236,000

5,236,000

No.

948,640

948,640

To Collection

Rp.

113,621,420

WOODEN DOORS (Cont'd) Supply, assemble, set and install 40mm thick solid core flush door consist of 3mm thick sungkai plywood covered both sides on 9mm plywood backing complete with stain finish including all necessary fixing accessories (cont'd) A Double door equal leaf double swing, with buffer plate 170x85 and 6mm thick clear float glass 15x60 (2 No); size 1700mm x 2100mm high (kode:D18E/3SC) Ditto, ditto; size 1700mm x 2350mm high (kode:D18E/3SC) Ditto, ditto; size 1700mm x 2650mm high (kode:D18E/3SC) Ditto but only buffer plate; size 1700mm x 850mm Ditto but only 6mm thick float clear glass including necessary framing; size 150mm x 600mm (2 No) Double door unequal leaf double swing, with 6mm thick clear float glass 60x60 and buffer plate 140x85 (m.s); size 1400mm x 2100mm high (kode : D15U/2SC) Ditto but only buffer plate; size 1400mm x 850mm Ditto but only 6mm thick float clear glass including necessary framing; size 600mm x 600mm Double door unequal leaf double swing, with 6mm thick clear float glass 20x30 and buffer plate 140x85 (m.s); size 1400mm x 2100mm high (kode: D15U/6SC) Ditto but only buffer plate; size 1400mm x 850mm Ditto but only 6mm thick float clear glass including necessary framing; size 200mm x 300mm MECHANICS DOORS Approved steel door made from specialist with mechanically system as described and specified, fix including all finishing and as manufacturer's instruction L M N O P Q Roll-up grille door "ex.Bunka"; size 6400mm x 2700mm high Ditto; size 4400mm x 2700mm high Ditto; size 3300mm x 2700mm high Ditto; size 3000mm x 2700mm high Folding door; size 3400mm x 2700mm high Ditto; size 3200mm x 2700mm high 1 1 1 1 1 2 No. No. No. No. No. No. 19,812,416 13,417,016 10,388,084 9,562,011 24,558,336 23,113,728 Rp. 19,812,416 13,417,016 10,388,084 9,562,011 24,558,336 46,227,456 209,648,720 1 No. 5,236,000 5,236,000

B C D E

2 1 4 4

No. No. No. No.

5,236,000 5,236,000 2,200,000 165,000

10,472,000 5,236,000 8,800,000 660,000

No.

5,236,000

5,236,000

G H

1 1

No. No.

2,200,000 165,000

2,200,000 165,000

No.

5,691,400

34,148,400

J K

6 6

No. No.

2,200,000 55,000

13,200,000 330,000

To Collection

MECHANICS DOORS (Cont'd) Approved steel door made from specialist with mechanically system as described and specified, fix including all finishing and as manufacturer's instruction

JFP.30627.MC-RSIB

7/6

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No. A B C D E

BILL NO. 3 ARCHITECTURAL 3.3 - DOORS & WINDOWS WORKS Roll-up grille door "ex.Bunka"; size 4700mm x 2700mm high Ditto; size 1850mm x 2700mm high Ditto; size 4300mm x 2700mm high Ditto; size 4100mm x 2700mm high Folding door "ex.Kenari Jaya"; size 6800mm x 2700mm high

Qty 1 1 1 1 1

Unit No. No. No. No. No.

Rate 14,243,089 5,507,150 13,141,659 12,590,944 49,068,483

Rupiahs 14,243,089 5,507,150 13,141,659 12,590,944 49,068,483

To Collection

Rp.

94,551,324

DOOR FRAMES 50 x 150mm thick approved steel door framing made from 1.6mm thick metal to suit final opening for wooden doors including spray paint finish/duco finish including all necessary fixing accessories and as shown on drawings A Single door single swing; overall size 800mm x 2150mm high (kode : D8/1SC) Ditto; overall size 900mm x 2150mm high (kode : D9/1SC) Ditto; overall size 900mm x 2150mm high (kode : D9/2SC) Ditto; overall size 900mm x 2150mm high (kode : D9/6SC) Ditto; overall size 900mm x 2150mm high (kode : D9/7SC) Ditto; overall size 1000mm x 2150mm high (kode : D10/1SC) Ditto; overall size size 1000mm x 2150mm high (kode:D12/6SC) Double door equal leaf double swing; overall size 1400mm x 2150mm high (kode : D14E/7SC) Ditto; overall size 1500mm x 2700mm high (kode: D15E/7SC) Ditto; overall size 1600mm x 2700mm high (kode: D16E/3SC) Ditto; overall size 1600mm x 2700mm high (kode: D16E/7SC) Ditto; overall size 1600mm x 2150mm high (kode: D16E/7SC) Ditto; overall size 1800mm x 2150mm high (kode: D18E/3SC) Ditto; overall size 1800mm x 2400mm high (kode:D18E/3SC) Ditto; overall size 1800mm x 2700mm high (kode:D18E/3SC) 9 No. 1,631,163 14,680,463 5.10 431,778 2,202,069

B C D E F G H

26 1 2 5 17 14 1

No. No. No. No. No. No. No.

1,656,738 1,656,738 1,656,738 1,656,738 1,711,738 1,711,738 3,262,325

43,075,175 1,656,738 3,313,475 8,283,688 29,099,538 23,964,325 3,262,325

5.20

430,115

2,236,596 2,236,596 2,236,596 2,236,596

5.30

436,009

2,310,846 2,310,846

5.70

772,656

4,404,139

I J K L M N O

1 4 1 1 1 2 1

No. No. No. No. No. No. No.

3,262,325 3,312,325 3,312,325 3,312,325 3,362,325 3,362,325 3,362,325

3,262,325 13,249,300 3,312,325 3,312,325 3,362,325 6,724,650 3,362,325

5.80

759,334

4,404,139 4,471,639

JFP.30627.MC-RSIB

7/7

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No. P Q

BILL NO. 3 ARCHITECTURAL 3.3 - DOORS & WINDOWS WORKS Ditto; overall size 1500mm x 2150mm high (kode : D15U/2SC) Ditto; overall size 1500mm x 2150mm high (kode:D15U/6SC)

Qty 1 7

Unit No. No.

Rate 3,262,325 3,262,325

Rupiahs 3,262,325 22,836,275

To Collection

Rp.

190,019,900

EXISTING DOORS Install existing wooden solid core flush door with steel framings including repair from demolish and refinish paint as described including all necessary fixing accessories and ironmongeries as shown on drawing no. A600-A603 and as specified A Single door single swing; size 700mm x 2100mm high (kode : D8/1SC) Ditto; with kick plate 80x20; size 800mm x 2100mm high (kode: D9/1SC) Ditto; with view panel 20x30 (m.s); size 800mm x 2100mm high (kode : D9/6SC) Ditto; with kick plate 90x20 (m.s); size 900mm x 2100mm high (kode : D10/1SC) Ditto; with buffer plate 90x85 and clear float glass 20x30 (m.s); size 900mm x 2100mm high (kode: D10/6SC) Ditto; with buffer plate 110x85 and clear float glass 20x30 (m.s); size 900mm x 2100mm high (kode:D12/6SC) Double door equal leaf double swing, with buffer plate 170x85 and 6mm thick clear float glass 15x60 (2 No); size 1700mm x 2700mm high (kode:D18E/3SC) Ditto, ditto; size 1700mm x 2400mm high (kode:D18E/3SC) Double door unequal leaf double swing, with 6mm thick clear float glass 60x60 and buffer plate 140x85 (m.s); size 1400mm x 2100mm high (kode : D15U/2SC) Ditto, ditto; size 1400mm x 2100mm high (kode:D15U/6SC) Install existing fire rated steel door with steel framings including repair from demolish and refinish factory paint finish including all necessary fixing accessories and ironmongeries as shown on drawing no. A600-A603 and as specified K L Single door single swing; overall size 800mm x 2150mm (D9/1RD) Double door unequal leaf double swing with georgian glass; size 1200mm x 2650mm high (kode : D13U/4FR) Double door unequal leaf double swing; overall size 1500mm x 2150mm high (kode : D15U/1RD) Install existing glass doors, consisting of 1.3mm thick aluminium and 60micron powder coating main and sub-frames finish (ditto) N Double door equal leaf glazed with 6mm thick tempered clear glass; size 1800mm x 2350mm (kode : D18E/7AL) 1 No. 880,000 880,000 1 1 No. No. 550,000 880,000 550,000 880,000 2 No. 550,000 1,100,000

41

No.

550,000

22,550,000

No.

550,000

1,650,000

28

No.

550,000

15,400,000

No.

550,000

2,200,000

18

No.

550,000

9,900,000

No.

880,000

880,000

H I

1 1

No. No.

880,000 880,000

880,000 880,000

No.

880,000

2,640,000

No.

880,000

880,000

To Collection

Rp.

61,270,000

EXISTING DOORS (Cont'd) Install existing 1.3mm thick aluminium glass doors and 27 x 100mm thick aluminium door frames, finish 60micron powder coating main and sub - frames finish including all necessary fixing accessories as shown on drawing no. 30627-A600 to A603 and 30627-A604 sec 8 and as specified A Double door equal leaf glazed with 6mm thick tempered clear glass 50x124 (2 No) & 50x70 (2 No) (m.s); size 1400mm x 2350mm (kode : D15E/7AL/2400) Ditto but only tempered clear glass including necessary 1 No. 330,000 330,000

No.

330,000

330,000

JFP.30627.MC-RSIB

7/8

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL 3.3 - DOORS & WINDOWS WORKS framing; size 50x124 (2 No) and 50x70 (2 No)

Qty

Unit

Rate

Rupiahs

To Collection

Rp.

660,000

EXTERNAL WINDOWS Supply and install glass window (type 2), consisting of aluminium main and sub-frames 60micron powder coating finish, with and including 6mm thick stopsol reflective glazing classic dark blue, complete including gaskets, silicone sealant and all necessary fixing accessories A Fixed windows; overall size 1500mm x 600mm (code: W18) Supply and install glass window (type 3), consisting of aluminium main and sub-frames 60micron powder coating finish, with and including 6mm thick stopsol reflective glazing classic dark blue, complete including gaskets, silicone sealant and all necessary fixing accessories B Sliding windows; overall size 1500mm x 1650mm (code: W19) INTERNAL WINDOWS Supply and install glass window (type 1), consisting of wooden main and sub-frames veneer finish, with/and including 5mm thick indofloat clear glass, complete including gaskets, silicone sealant and all necessary fixing accessories C Fixed windows; including door opening 800 x 2100mm; overall size 3400mm x 2150mm high (code: W1) Ditto; overall size 2550mm x 2150mm high (code: W2) Ditto; including door opening 1400 x 2650mm; overall size 6400mm x 2700mm high (code: W3) Ditto; including door opening 800 x 2100mm; overall size 1250mm x 2150mm high (code: W4) Ditto; overall size 400mm x 2150mm high (code: W5) Ditto; overall size 950mm x 2700mm high (code: W6) Ditto; overall size 3000mm x 2700mm high (code: W7) Ditto; including door opening 1500 x 2650mm; overall size 3000mm x 2700mm high (code: W22) Supply and install glass window (type 4), consisting of 1 No. 6,030,750 6,030,750 25 No. 4,241,875 106,046,875 12 No. 2,392,500 28,710,000

D E

1 1

No. No.

4,523,063 3,060,750

4,523,063 3,060,750

No.

2,165,625

4,331,250

G H I J

6 1 1 1

No. No. No. No.

709,500 2,116,125 6,682,500 3,716,625

4,257,000 2,116,125 6,682,500 3,716,625

JFP.30627.MC-RSIB

7/9

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL 3.3 - DOORS & WINDOWS WORKS aluminium main and sub-frames 60micron powder coating finish, with and including 5mm thick indofloat clear glass, complete including gaskets, silicone sealant and all necessary fixing accessories Fixed windows; overall size 900mm x 1350mm high (code: W9)

Qty

Unit

Rate

Rupiahs

No.

2,102,375

2,102,375

To Collection

Rp.

171,577,313

INTERNAL WINDOWS (Cont'd) Supply and install glass window (type 5), consisting of wooden main and sub-frames veneer finish, with/and including 5mm thick indofloat clear glass, complete including gaskets, silicone sealant and all necessary fixing accessories A B Sliding windows; overall size 1500mm x 1050mm high (code: W8) Ditto; overall size 900mm x 1050mm high (code: W21) Supply and install aluminium louvre (type 6), consisting of aluminium main frames and leaves 60micron powder coating finish complete including gaskets, silicone sealant and all necessary fixing accessories C Fixed louvre; overall size 1500mm x 200mm high (code: LV1) EXISTING WINDOWS Install existing fixed glass windows with its framings including repair from demolish and refinish factory paint finish including all necessary fixing accessories and ironmongeries as shown on drawing no. A600-A603 and as specified D E F G H I Fixed windows; overall size 3600mm x 2700mm high (code: W11) Ditto; overall size 1300mm x 1350mm high, ditto (type W12) Ditto; overall size 1300mm x 1350mm high, ditto (type W13) Ditto; overall size 9600mm x 600mm high, ditto (type W14) Ditto; overall size 6000mm x 600mm high, ditto (type W15) Ditto; overall size 1500mm x 1650mm high (type W20) 1 1 5 1 1 4 No. No. No. No. No. No. 2,673,000 482,625 482,625 1,584,000 99,000 680,625 2,673,000 482,625 2,413,125 1,584,000 99,000 2,722,500 21 No. 1,815,000 38,115,000 0.30 8,167,500 1 1 No. No. 1,299,375 779,625 1,299,375 779,625

To Collection

Rp.

50,168,250

COLLECTION

Page 7 / 5

358,090,563

Page 7 / 6

113,621,420

Page 7 / 7

209,648,720

Page 7 / 8

94,551,324

Page 7 / 9

190,019,900

Page 7 / 10

61,270,000

JFP.30627.MC-RSIB

7 / 10

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL WORKS

3.3 - DOORS & WINDOWS

Qty

Unit

Rate

Rupiahs

Page 7 / 11

660,000

Page 7 / 12

171,577,313

Page 7 / 13

50,168,250

BILL NO. 3.3 - DOORS & WINDOWS Rp Carried to summary at and of Bill No. 3 1,249,607,489

JFP.30627.MC-RSIB

7 / 11

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL WORKS LEVEL 1

3.4 - INTERNAL WALLS AND PARTITIONS

Qty

Unit

Rate

Rupiahs

1.331

Brickwork in cement and sand (1:2) mortar complete with reinforcement, lintels, siffeners, anchorage latching and accessories as described A Walls, 150mm thick Brickwork in cement and sand (1:4) mortar complete with reinforcement, lintels, siffeners, anchorage latching and accessories as described B Walls, 150mm thick Gypsum board partition with parimeter framing U channels, covered both sides with 12mm thick gypsum board including metal stud vertically, and all necessary fixing accessories joint stopping, corner and end beads C Gypsum board partition, 120mm thick Insulation D Rockwool insulation 32kg/m3, 40mm thick to gypsum partition Approved cubicle partitions including doors, hardware and necessary fixing accessories, all as specified E F To public toilet, grid line 3 - J Ditto, grid line 10 - E LEVEL 2 Brickwork in cement and sand (1:2) mortar complete with reinforcement, lintels, siffeners, anchorage latching and accessories as described G Walls, 150mm thick Brickwork in cement and sand (1:4) mortar complete with reinforcement, lintels, siffeners, anchorage latching and accessories as described H Walls, 150mm thick Gypsum board partition with parimeter framing U channels, covered both sides with 12mm thick gypsum board including metal stud vertically, and all necessary fixing accessories joint stopping, corner and end beads I Gypsum board partition, 120mm thick 787.12 m2 143,000 Rp. 112,558,455 366,662,697 543.63 m2 81,780 44,458,429 205.10 m2 87,990 18,046,943 32.84 24.74 m2 m2 1,155,000 1,155,000 37,930,200 28,574,700 78.00 m2 38,500 3,003,000 52000 78.00 m2 143,000 11,154,000 194000 1,179.00 m2 81,780 96,418,620 111000 165.00 m2 87,990 14,518,350 119000

To Collection

LEVEL 2 (Cont'd) Insulation A Rockwool insulation 32kg/m3, 40mm thick to gypsum partition Approved cubicle partitions including doors, hardware and necessary fixing accessories, all as specified B To toilet LEVEL 3 Brickwork in cement and sand (1:2) mortar complete with reinforcement, lintels, siffeners, anchorage latching and accessories as described C Walls, 150mm thick Brickwork in cement and sand (1:4) mortar complete with reinforcement, lintels, siffeners, anchorage latching and accessories as described D Walls, 150mm thick 190.00 m2 81,780 15,538,200 282.00 m2 87,990 24,813,180 17.10 m2 1,155,000 19,750,500 572.99 m2 38,500 22,060,079

To Collection

Rp.

82,161,959

JFP.30627.MC-RSIB

7 / 15

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL WORKS COLLECTION

3.4 - INTERNAL WALLS AND PARTITIONS

Qty

Unit

Rate

Rupiahs

Page 7 / 14

366,662,697

Page 7 / 15

82,161,959

BILL NO. 3.4 - INTERNAL WALLS AND PARTITIONS Carried to summary at and of Bill No. 3 Rp. 448,824,655

JFP.30627.MC-RSIB

7 / 16

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL WORKS LEVEL 1

3.5 - WALL FINISHES

Qty

Unit

Rate

Rupiahs

Plaster in cement and sand ( 1:2 ) mortar smooth finishes with cement coating A 20 mm thick to walls and columns Plaster in cement and sand ( 1:4 ) mortar smooth finishes with cement coating B 20 mm thick to walls and columns Backing; cement and sand (1:2) as described C D 15mm thick to receive ceramic tile 30mm thick x 200mm high to receive ceramic boder Supply and install approved ceramic tiles bedded and jointed in cement and sand (1:3) on screed (m.s) and pointed in white or coloured cement as described E Ceramic tile size 200mm x 200mm, glossy surface; to wall (code: CT 5A) Ditto size 200mm high, ditto; border to wall (code: CT5B) Supply and fix approved wallpaper bedded and jointed in glue as specified architect instruction G Vinyl wall covering to wall (code : WF 1) Prepare and apply three coats of acrylic emulsion paint and in accordance with manufacturer's written instructions H To wall and column, PT2 2,265.07 m2 14,850 33,636,290 1,918.35 m2 87,239 167,354,552 195.72 m2 107,120 20,965,526 195.72 100.79 m2 m 24,890 4,978 4,871,471 501,733 2,508.38 m2 42,360 106,254,977 378.96 m2 47,790 18,110,498

145.99

32,136

4,691,535

To Collection

Rp.

356,386,581

LEVEL 2 Plaster in cement and sand ( 1:2 ) mortar smooth finishes with cement coating A 20 mm thick to walls and columns Plaster in cement and sand ( 1:4 ) mortar smooth finishes with cement coating B 20 mm thick to walls and columns Backing; cement and sand (1:2) as described C D 15mm thick to receive ceramic tile 30mm thick x 200mm high to receive ceramic boder Supply and install approved ceramic tiles bedded and jointed in cement and sand (1:3) on screed (m.s) and pointed in white or coloured cement as described E Ceramic tile size 200mm x 200mm, glossy surface; to wall (code: CT 5A) Ditto size 200mm high, ditto; border to wall (code: CT5B) Ceramic tile size 325mm x 650mm 'Rectificado'; to floor Supply and fix approved wallpaper bedded and jointed in glue as specified architect instruction 47.69 m2 107,120 5,108,553 133.40 72.10 m2 m 24,890 4,978 3,320,326 358,914 33601.5 670.00 m2 42,360 28,381,200 57186 199.00 m2 47,790 9,510,210 64516.5

F G

26.90 122.64

m m2

32,136 184,510

864,458 22,628,306

JFP.30627.MC-RSIB

7 / 16

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL WORKS

3.5 - WALL FINISHES

Qty

Unit

Rate

Rupiahs

Vinyl wall covering to wall (code : WF 1) Prepare and apply three coats of acrylic emulsion paint and in accordance with manufacturer's written instructions

791.18

m2

87,239

69,021,594

To wall and column, PT2 Prepare and apply three coats of majestic optima antibacterial paint and in accordance with manufacturer's written instructions

3,124.00

m2

14,850

46,391,400

To wall and column, PT3

356.00

m2

27,500

9,790,000

To Collection

Rp.

195,374,961

LEVEL 3 Plaster in cement and sand ( 1:2 ) mortar smooth finishes with cement coating A 20 mm thick to walls and columns Plaster in cement and sand ( 1:4 ) mortar smooth finishes with cement coating B 20 mm thick to walls and columns Backing; cement and sand (1:2) as described C D 15mm thick to receive ceramic tile 30mm thick x 200mm high to receive ceramic boder Supply and install approved ceramic tiles bedded and jointed in cement and sand (1:3) on screed (m.s) and pointed in white or coloured cement as described E Ceramic tile size 200mm x 200mm, glossy surface, to wall (code: CT 5A) Ditto size 200mm high, ditto, border to wall (code: CT5B) Ceramic tile size 325mm x 650mm 'Rectificado'; to floor Supply and install approved tiles bedded and jointed in cement and sand (1:3) on screed (m.s) and pointed in coloured cement as described H Homogeneous tile size 200mm x 200mm, polished; to wall (code: CT2A) Ditto size 200mm high, ditto; border to wall (code: CT2B) Supply and fix approved wallpaper bedded and jointed in glue as specified architect instruction J Vinyl wall covering to wall (code : WF 1) Prepare and apply three coats of acrylic emulsion paint and in accordance with manufacturer's written instructions K To wall and column, PT2 1,740.03 m2 14,850 25,839,446 560.57 m2 87,239 48,903,454 271.28 m2 158,740 43,062,987 193.00 m2 107,120 20,674,160 193.00 101.00 m2 m2 24,890 4,978 4,803,770 502,778 1,093.70 m2 42,360 46,329,132 699.50 m2 47,790 33,429,105

F G

101.00 168.63

m m2

32,136 184,510

3,245,736 31,113,921

61.05

31,748

1,938,215

To Collection

Rp.

259,842,705

COLLECTION

Page 7 / 16

356,386,581

JFP.30627.MC-RSIB

7 / 17

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL WORKS Page 7 / 17

3.5 - WALL FINISHES

Qty

Unit

Rate

Rupiahs 195,374,961

Page 7 / 18

259,842,705

BILL NO. 3.5 - WALL FINISHES Carried to summary at and of Bill No. 3 Rp. 811,604,247

JFP.30627.MC-RSIB

7 / 18

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL WORKS LEVEL 1

3.6 - FLOOR FINISHES

Qty

Unit

Rate

Rupiahs

Screed; cement and sand (1:3) as specified A B C Beds; 20mm thick to receive homogeneous tile Beds; 25mm thick to receive carpet tile Backing; 20mm thick x 100mm high to receive skirting Supply and install approved tiles bedded and jointed in cement and sand (1:3) on screed (m.s) and pointed in coloured cement as described C Homogeneous tile size 400mm x 400mm, unpolished; to floor (code: CT 1) Ditto size 200mm x 200mm; to floor (code: CT 5) Ditto size 300mm x 300mm; to floor (code: CT 6) Ditto skirting 400mm x 100mm high (code: SK 3) Ditto skirting 300mm x 100mm high (code: SK 5) Supply and install approved vinyl flooring laid on screed including glued and other necessary fixing accessories, making level surface before applying as specified H I Vinyl "TARKETT "; to floor (code: VIN 1) Ditto; skirting 100mm high (code: SK 1) Stainless steel hairline finish as described and specified J Skirting 100m high (code: SK 4) Supply and install approved tiles bedded and jointed in cement and sand (1:3) on screed (m.s) and pointed in coloured cement as described K Ceramic tile size 200mm x 200mm; to floor Supply and install approved carpet tiles 'interface' laid on screed including glue and other necessary fixing accessories, making level surface before applying as specified L Interface carpet tiles; to floor 93.50 m2 275,000 25,712,500 85.71 m2 107,120 9,181,255 90.59 m 192,500 17,438,575 231.19 178.25 m2 m 228,415 113,850 52,807,264 20,293,763 308360.3 844.00 m2 191,710 161,803,240 1,107.57 85.71 1,187.25 m2 m2 m 24,890 30,100 2,489 27,567,417 2,579,871 2,955,065 33601.5 40635

D E F G

71.91 20.75 1,092.80 31.15

m2 m2 m m

107,120 169,550 31,890 30,160

7,702,999 3,518,163 34,849,392 939,484 40716

To Collection

Rp.

367,348,988

LEVEL 1 (Cont'd) Supply and install approved 'Kamper' wood solid fixed including screed, glued and/or other necessary fixing accessories, as specified A To skirting Supply and install approved marble 'Ujung Pandang' bedded and jointed in cement and sand (1:3) on screed (including) and pointed in coloured cement as described B C Marble tile size 600mm x 600mm, polished finish; to floor Ditto; to skirting LEVEL 2 Screed; cement and sand (1:3) as specified D E Beds; 20mm thick to receive homogeneous tile Backing; 20mm thick x 100mm high to receive skirting Supply and install approved tiles bedded and jointed in cement and sand (1:3) on screed (m.s) and pointed in coloured cement as described F Homogeneous tile size 400mm x 400mm, unpolished; to floor (code: CT 1) 469.73 m2 191,710 90,051,938 764.90 468.25 m2 m 24,890 2,489 19,038,361 1,165,474 103.80 65.30 m2 m 457,510 91,640 47,489,538 5,984,092 113.68 m 77,000 8,753,360

JFP.30627.MC-RSIB

7 / 20

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No. G H I J

BILL NO. 3 ARCHITECTURAL 3.6 - FLOOR FINISHES WORKS Ditto size 200mm x 200mm; to floor (code: CT 5) Ditto size 300mm x 300mm; to floor (code: CT 6) Ditto skirting 400mm x 100mm high (code: SK 3) Ditto skirting 300mm x 100mm high (code: SK 5) Supply and install approved vinyl flooring laid on screed including glued and other necessary fixing accessories, making level surface before applying as specified

Qty 51.41 18.46 332.65 29.70

Unit m2 m2 m m

Rate 107,120 169,550 31,890 30,160

Rupiahs 5,507,039 3,129,893 10,608,209 895,752

K L

Vinyl "TARKETT "; to floor (code: VIN 1) Ditto; skirting 100mm high (code: SK 1) Supply and install approved tiles bedded and jointed in cement and sand (1:3) on screed (m.s) and pointed in coloured cement as described

793.22 500.21

m2 m

228,415 113,850

181,183,346 56,948,909 153697.5

Ceramic tile size 325mm x 325mm 'Rectificado'; to floor

22.08

m2

109,910 Rp.

2,426,813 433,182,724

To Collection

LEVEL 2 (Cont'd) Supply and install approved carpet tiles 'interface' laid on screed including glue and other necessary fixing accessories, making level surface before applying as specified A Interface carpet tiles; to floor Supply and install approved 'Kamper' wood solid fixed including screed, glued and/or other necessary fixing accessories, as specified B To skirting Supply and install approved 'Merbau' wood solid parquet flooring laid on screed including glued and/or other necessary fixing accessories, making level surface before applying as specified due to tender notice 'Klarifikasi-1 dated 6-Mar-09' C D To floor To skirting Prepare and apply approved waterproofing membrane on clean surfaces as specified , strictly in accordance with the manufacturer's instruction E To floor, including up turn 200mm high (code: WP1) LEVEL 3 Screed; cement and sand (1:3) as specified F G Beds; 20mm thick to receive homogeneous tile Backing; 20mm thick x 100mm high to receive skirting Supply and install approved tiles bedded and jointed in cement and sand (1:3) on screed (m.s) and pointed in coloured cement as described H Homogeneous tile size 400mm x 400mm, unpolished; to floor (code: CT 1) Ditto size 200mm x 200mm; to floor (code: CT 2) Ditto size 200mm x 200mm; to floor (code: CT 5) Ditto skirting 400mm x 100mm high (code: SK 3) 772.99 m2 191,710 148,189,913 875.54 621.10 m2 m 24,890 2,489 21,792,191 1,545,918 213.53 m2 93,500 19,965,055 66 65 m2 m 693,000 77,000 45,634,050 5,028,100 40.60 m 77,000 3,126,200 70.20 m2 275,000 19,305,000

I J K

52.55 50.00 621.10

m2 m2 m

107,120 107,120 31,890

5,629,156 5,356,000 19,806,879

To Collection

Rp.

295,378,461

LEVEL 3 (Cont'd) Trowelled smooth A Trowelled smooth to surface concrete slab (code: CTF1) Prepare and apply approved waterproofing membrane on clean 211.77 m2 5,500 1,164,735

JFP.30627.MC-RSIB

7 / 21

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL 3.6 - FLOOR FINISHES WORKS surfaces as specified , strictly in accordance with the manufacturer's instruction To floor, including up turn 200mm high (code: WP1) Supply and install approved tiles bedded and jointed in cement and sand (1:3) on screed (m.s) and pointed in coloured cement as described

Qty

Unit

Rate

Rupiahs

341.69

m2

93,500

31,948,015

126225

Ceramic tile size 325mm x 325mm 'Rectificado'; to floor

30.36

m2

109,910

3,336,868

To Collection

Rp.

36,449,618

COLLECTION

Page 7 / 20

367,348,988

Page 7 / 21

433,182,724

Page 7 / 22

295,378,461

Page 7 / 23

36,449,618

JFP.30627.MC-RSIB

7 / 22

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL WORKS

3.6 - FLOOR FINISHES

Qty

Unit

Rate

Rupiahs

BILL NO. 3.6 - FLOOR FINISHES Carried to summary at and of Bill No. 3 Rp. 1,132,359,791

JFP.30627.MC-RSIB

7 / 23

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL WORKS LEVEL 1

3.7 - CEILING FINISHES

Qty

Unit

Rate

Rupiahs

1200mm x 600mm steel grid suspension system consist of main 'T' bar and cross 'T', edge trim as shown on drawing no. 30627-A307 A B Suspension system for gypsum board tile Ditto but to drop ceiling Suspension system including premary channel, suspension and furring channel clip brackets screen bolds,plugs edge etc, all necessary fixing accessories as described C Suspension system for gypsum board seamless 12mm thick prefinished plasterboard tiles, fixing on suspension system (m.s) including making holes for lighting fitting,sprinkler holes and other requirement for mechanical and electrical, and all necessary fixing accessories as specified D E F G To ceiling (code : C1) To ceiling (code : C2) Drop ceiling 300mm high ditto Ditto 150mm high ditto 13mm thick prefinished plasterboard tiles, fixing on suspension system (m.s) including making holes for lighting fitting,sprinkler holes and other requirement for mechanical and electrical, and all necessary fixing accessories as specified H To ceiling (code : C3) 9mm thick gypsum board, fixing on suspension system (m.s) including making holes for lighting fitting, sprinkler holes and other requirement for mechanical and electrical, and all necessary fixing accessories as specified I To ceiling (code : GBP1) Aluminium profile 'U' shape fixed with all necessary fixing accessories including paint finish as specified J Cornice 10x10mm Prepare and apply three coats of acrylic emulsion paint and in accordance with manufacturer's written instructions To surface of flat and drop ceiling, PT 7 1,741.00 m 9,350 16,278,350 13.00 m2 49,500 643,500 6.00 m2 60,500 363,000 1,294.00 522.00 10.00 109.00 m2 m2 m m 60,500 60,500 30,250 30,250 78,287,000 31,581,000 302,500 3,297,250 81675 13.00 m2 38,500 500,500 1,816.00 19.35 m2 m2 38,500 38,500 69,916,000 744,975 51975

3,669.00

m2

14,850

54,484,650

To Collection

Rp.

256,398,725

LEVEL 2 1200mm x 600mm steel grid suspension system consist of main 'T' bar and cross 'T', edge trim as shown on drawing no. 30627-A307 A B Suspension system for gypsum board tile Ditto but to drop ceiling 12mm thick prefinished plasterboard tiles, fixing on suspension system (m.s) including making holes for lighting fitting,sprinkler holes and other requirement for mechanical and electrical, and all necessary fixing accessories as specified C D E F To ceiling (code : C1) To ceiling (code : C2) Drop ceiling 300mm high ditto Ditto 150mm high ditto 13mm thick prefinished plasterboard tiles, fixing on suspension system (m.s) including making holes for lighting fitting,sprinkler holes and other requirement for mechanical and electrical, and all necessary fixing accessories as specified G To ceiling - water resistant (code : C4) 24.00 m2 99,000 2,376,000 734.00 816.00 10.00 109.00 m2 m2 m m 60,500 60,500 30,250 30,250 44,407,000 49,368,000 302,500 3,297,250 1,574.00 19.35 m2 m2 38,500 38,500 60,599,000 744,975

JFP.30627.MC-RSIB

7 / 25

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL 3.7 - CEILING FINISHES WORKS Aluminium profile 'U' shape fixed with all necessary fixing accessories including paint finish as specified Cornice 10x10mm Prepare and apply three coats of acrylic emulsion paint and in accordance with manufacturer's written instructions

Qty

Unit

Rate

Rupiahs

1,328.00

9,350

12,416,800

To surface of flat and drop ceiling, PT 7

3,380.00

m2

14,850

50,193,000

To Collection

Rp.

223,704,525

LEVEL 3 1200mm x 600mm steel grid suspension system consist of main 'T' bar and cross 'T', edge trim as shown on drawing no. 30627-A307 A B Suspension system for gypsum board tile Ditto but to drop ceiling Suspension system including premary channel, suspension and furring channel clip brackets screen bolds,plugs edge etc, all necessary fixing accessories as described C Suspension system for gypsum board seamless 12mm thick prefinished plasterboard tiles, fixing on suspension system (m.s) including making holes for lighting fitting,sprinkler holes and other requirement for mechanical and electrical, and all necessary fixing accessories as specified D E F To ceiling (code : C1) To ceiling (code : C2) Drop ceiling 300mm high ditto 13mm thick prefinished plasterboard tiles, fixing on suspension system (m.s) including making holes for lighting fitting,sprinkler holes and other requirement for mechanical and electrical, and all necessary fixing accessories as specified G To ceiling - water resistant (code : C4) 6mm thick fibrous cement, fixed including steel purlins as shown on drawing no. A704 & A704 and all necessary fixing accessories as specified H To external ceiling (code : FC) Aluminium profile 'U' shape fixed with all necessary fixing accessories including paint finish as specified I Cornice 10x10mm Prepare and apply three coats of acrylic emulsion paint and in accordance with manufacturer's written instructions J To surface of flat and drop ceiling, PT 7 1,030.00 m2 14,850 15,295,500 1,119.00 m 9,350 10,462,650 102.00 m2 49,500 5,049,000 59.00 m2 99,000 5,841,000 245.00 684.00 220.00 m2 m2 m 60,500 60,500 30,250 14,822,500 41,382,000 6,655,000 102.00 m2 38,500 3,927,000 929.00 66.00 m2 m2 38,500 38,500 35,766,500 2,541,000

To Collection

Rp.

141,742,150

COLLECTION

JFP.30627.MC-RSIB

7 / 26

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL WORKS Page 7 / 25

3.7 - CEILING FINISHES

Qty

Unit

Rate

Rupiahs 256,398,725

Page 7 / 26

223,704,525

Page 7 / 27

141,742,150

BILL NO. 3.7 - CEILING FINISHES Carried to summary at and of Bill No. 3 Rp. 621,845,400

JFP.30627.MC-RSIB

7 / 27

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL WORKS LEVEL 1

3.8 - SANITARY FITTINGS AND FIXTURES

Qty

Unit

Rate

Rupiahs

Supply and install the following approved sanitary fittings complete with all necessary accessories and fittings, including assembling, providing all jointing materials, making all connections to services and vents and cutting and pinning or pluging and scewing brackets, etc. and pointing with approved sealant to wall and floors and making good and cleaning down on completion all as described A Wall hunging lavatory LW 236 CJ, complete with all necessary fittings and accessories (code: HB1) Semi recessed lavatory LW 660 CJ, ditto (code: HB4) Floor mounted closet CW 420 J / SW 420 JP complete with all necessary fittings and accessories (code: WC5) Urinal UW 447 JT1M complete with flush valve and all necesssary fittings and accessories (code: URL) Basin Tap TX 108 LDN at Toilet (code: TP5) Ditto TX 108 LDN at Disable Room (code: TP3) Service sink SKW 322 B (code: S1) Ditto tap T 30 ARQ13N (code: TP4) Ditto BLANCOFLEX (code: SNK1) Ditto BLANCOPLUS 45 (code: SNK2) Ditto tap TX 604 KDN (code: TP6) Floor waste TX 1 BN (code: FW) Spray nozzle TGB 500 AZRV20 (code: SPY2) Double robe hook TS 118 WS (code: HK6) Soap dispencer TS 125 R (code: DSP) Paper holder TX 703 AESV1 (code: DTP) Glass shelf TX 705 AES (code: SLF1) Handycap grab bar, mirror with texture, HGB 00400 - HENZEL Standard (code: GRB4) 1 No. 1,719,740 1,719,740

B C

8 12

No. No.

1,525,700 1,529,990

12,205,600 18,359,880

No.

2,242,460

13,454,760

E F G H I J K L M N O P Q R

8 1 2 2 2 1 3 10 12 12 5 12 1 1

No. No. No. No. No. No. No. No. No. No. No. No. No. No.

504,350 504,350 2,770,020 298,430 1,375,000 1,375,000 579,150 235,400 411,400 121,990 252,340 282,260 441,100 EXCLUDED

4,034,800 504,350 5,540,040 596,860 2,750,000 1,375,000 1,737,450 2,354,000 4,936,800 1,463,880 1,261,700 3,387,120 441,100

To Collection

Rp.

76,123,080

LEVEL 1 (CONT'D) Supply and fix mirrors complete with framing to wall A B C D Mirror glass 2400 x 800 x 6mm (Code : MRR6) Mirror glass 2500 x 800 x 6mm (Code : MRR7) Mirror glass 2000 x 800 x 6mm (Code : MRR8) Mirror glass 500 x 800 x 6mm (Code : MRR9) Supply and fix vanity counter E Toilet vanity counter; overall size 2500mm x 315mm x 300mm high; form hole for 2 No wash hand basin, with marble STN 1 finish vanity counter top, apron and fascia including backing as specified & shown on dwg. A501 Ditto; overall size 2400mm x 315mm x 300mm high; form hole for 2 No wash hand basin, ditto Ditto; overall size 2000mm x 315mm x 300mm high; form hole for 2 No wash hand basin, ditto 1 1 2 1 No. No. No. No. 1,161,600 1,210,000 968,000 242,000 1,161,600 1,210,000 1,936,000 242,000

No.

2,337,500

2,337,500

No.

2,244,000

2,244,000

No.

1,870,000

3,740,000

JFP.30627.MC-RSIB

7 / 29

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL WORKS

3.8 - SANITARY FITTINGS AND FIXTURES

Qty

Unit

Rate

Rupiahs

To Collection

Rp.

12,871,100

LEVEL 2 Supply and install the following approved sanitary fittings complete with all necessary accessories and fittings, including assembling, providing all jointing materials, making all connections to services and vents and cutting and pinning or pluging and scewing brackets, etc. and pointing with approved sealant to wall and floors and making good and cleaning down on completion all as described A Wall hunging lavatory LW 236 CJ, complete with all necessary fittings and accessories (code: HB1) Ditto, ditto (code: HB3) Semi recessed lavatory LW 660 CJ, ditto (code: HB4) Scrub sink (code: SNKT) Ditto BLANCOFLEX (code: SNK1) Ditto BLANCOPLUS 45 (code: SNK2) Ditto but at Dirty Utility (code: SNK3) Ditto tap TX 604 KDN (code: TP6) Floor mounted closet CW 420 J / SW 420 JP complete with all necessary fittings and accessories (code: WC5) Urinal UW 447 JT1M complete with flush valve and all necesssary fittings and accessories (code: URL) Basin Tap TX 108 LDN at Toilet (code: TP5) Ditto TX 108 LDN at Disable Room (code: TP3) Ditto TX 108 LDN (code: TP2) Floor waste TX 1 BN (code: FW) Spray nozzle TGB 500 AZRV20 (code: SPY2) Double robe hook TS 118 WS (code: HK6) Soap dispencer TS 125 R (code: DSP) Paper holder TX 703 AESV1 (code: DTP) Glass shelf TX 705 AES (code: SLF1) 3 No. 1,719,740 5,159,220

B C D E F G H I

8 2 1 5 1 1 6 7

No. No. No. No. No. No. No. No.

1,525,700 1,525,700 1,375,000 1,375,000 1,375,000 1,375,000 579,150 1,529,990

12,205,600 3,051,400 1,375,000 6,875,000 1,375,000 1,375,000 3,474,900 10,709,930

No.

2,242,460

4,484,920

K L M N O P Q R S

2 3 8 6 7 7 3 7 3

No. No. No. No. No. No. No. No. No.

504,350 504,350 504,350 235,400 411,400 121,990 252,340 282,260 441,100

1,008,700 1,513,050 4,034,800 1,412,400 2,879,800 853,930 757,020 1,975,820 1,323,300

To Collection

Rp.

65,844,790

LEVEL 2 (Cont'd) Supply and fix mirrors complete with framing to wall A B Mirror glass 1300 x 800 x 6mm (Code : MRR4) Mirror glass 1600 x 800 x 6mm (Code : MRR5) 1 1 No. No. 629,200 774,400 629,200 774,400

JFP.30627.MC-RSIB

7 / 30

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No.

BILL NO. 3 ARCHITECTURAL WORKS

3.8 - SANITARY FITTINGS AND FIXTURES

Qty

Unit

Rate

Rupiahs

Mirror glass 500 x 800 x 6mm (Code : MRR9) Supply and fix vanity counter

11

No.

242,000

2,662,000

Toilet vanity counter; overall size 1600mm x 315mm x 300mm high; form hole for 2 No wash hand basin, with marble STN 1 finish vanity counter top, apron and fascia including backing as specified & shown on dwg. A501 Ditto; overall size 1300mm x 315mm x 300mm high; form hole for 2 No wash hand basin, ditto Fibre glass handrail fixed to wall complete with all necessary fixing accessories, all as approved and specified

No.

2,640,000

2,640,000

No.

2,145,000

2,145,000

Pawling handrail; to wall

134.2

1,045,953

140,366,913

To Collection

Rp.

149,217,513

LEVEL 3 Supply and install the following approved sanitary fittings complete with all necessary accessories and fittings, including assembling, providing all jointing materials, (cont'd) A Wall hunging lavatory LW 236 CJ, complete with all necessary fittings and accessories (code: HB2) Floor mounted closet CW 420 J / SW 420 JP complete with all necessary fittings and accessories (code: WC2) Basin Tap TX 108 LDN at ensuite toilet (code: TP1) Service sink BLANCOFLEX 45 (code: SNK1) Ditto tap TX 604 KDN (code: TP6) Floor waste TX 1 BN (code: FW) Spray nozzle TGB 500 AZRV20 (code: SPY2) Shower S90230W / P40515PIV / TX472SESV1 (code: SWR) Tap TX 468 SEL (code: TP14) Double robe hook TS 118 WS (code: HK6) Paper holder TX 703 AESV1 (code: DTP) Glass shelf TX 705 AES (code: SLF1) Handycap grab bar, mirror with texture, HGB 00400 - HENZEL Standard (code: GRB3) Ditto; mirror with texture, HGB 01500 - HENZEL Shower sliding rail (code: SLR1) 19 No. 1,719,740 32,675,060

18

No.

1,529,990

27,539,820

C D E F G H I J K L M

19 1 1 18 18 18 18 18 18 18 18

No. No. No. No. No. No. No. No. No. No. No.

504,350 1,375,000 579,150 235,400 411,400 1,375,000 579,150 121,990 282,260 441,100 EXCLUDED

9,582,650 1,375,000 579,150 4,237,200 7,405,200 24,750,000 10,424,700 2,195,820 5,080,680 7,939,800

N O

18 18

No. No.

EXCLUDED 550,000 9,900,000

JFP.30627.MC-RSIB

7 / 31

DN / 82370871.xls

Bill No. 3 - Architecture Works

Item No. P Q

BILL NO. 3 ARCHITECTURAL 3.8 - SANITARY FITTINGS WORKS AND FIXTURES Double Towel Bar St Steel (code: RLTW) Soap holder S 6 N (code: SPH) Supply and fix mirrors complete with framing to wall

Qty 18 18

Unit No. No.

Rate 121,990 55,000

Rupiahs 2,195,820 990,000

Mirror glass 500 x 800 x 6mm (Code : MRR9) Fibre glass handrail fixed to wall complete with all necessary fixing accessories, all as approved and specified

19

No.

242,000

4,598,000

Pawling handrail; to wall

325.8

1,045,953

340,771,536

To Collection

Rp.

492,240,436

COLLECTION

Page 7 / 29

76,123,080

Page 7 / 30

12,871,100

Page 7 / 31

65,844,790

Page 7 / 32

149,217,513

Page 7 / 33

492,240,436

BILL NO. 3.8 - SANITARY FITTINGS AND FIXTURES Carried to summary at and of Bill No. 3 Rp. 796,296,919

JFP.30627.MC-RSIB

7 / 32

DN / 82370871.xls

Bill No. 3 - Architectural Works

Item No

BILL NO. 3 ARCHITECTURAL WORKS

SUMMARY

Unit

Rate

Rupiahs

SUMMARY

BILL NO. 3.1 BILL NO. 3.2 BILL NO. 3.3 BILL NO. 3.4 BILL NO. 3.5 BILL NO. 3.6 BILL NO. 3.7 BILL NO. 3.8

DEMOLITION WORKS EXTERNAL WALLS DOORS & WINDOWS INTERNAL WALLS & PARTITIONS WALL FINISHES FLOOR FINISHES CEILING FINISHES SANITARY FITTINGS AND FIXTURES

Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.

102,463,900 187,581,237 1,249,607,489 448,824,655 811,604,247 1,132,359,791 621,845,400 796,296,919

BILL NO. 3 - ARCHITECTURAL WORKS Carried to Final Summary Rp. 5,350,583,638

JFP.30627.MC-RSIB

7 / 35

DN / 82370871.xls

Bill No. 4 - B W I C

Item No.

BILL NO. 4 - BUILDERS WORK IN CONNECTION WITH NOMINATED SPECIALIST-CONTRACTORS

Qty

Unit

Rate

Rupiahs

Notes : A Cutting away and making good to other than structural work will be carried out by the Nominated Subcontractors concerned but the Main Contractor shall provide all necessary supervision in connection therewith. The Main Contractors attention is drawn to the the Standard Method of Measurement of Construction Works in Indonesia and in particular the coverage rules for sections 03100, 03200, 03300, 04200 and 09220 in respect of those items which are held to be included in the rates for concrete work, brickwork and blockwork and plaster and render. The Nominated Subcontractors will supply pipe and cable sleeves or conduits for the services they are installing and the Main Contractor shall build in all sleeves supplied by the Nominated Subcontractors. The Main Contractor shall make provision for services through all walls slabs and the like. If a sleeve is not in position at the time of casting / construction the Main Contractor should allow for leaving a hole and for building in a sleeve later. All sleeves will be provided by the Nominated Subcontractors ; these will be either issued to the Main Contractor for him to build in or they will be placed on the service at the point of penetration of the structure for final positioning and building in by the Main Contractor later. The following work packages will be executed by Nominated Subcontractors: Mechanical and Electrical Services Installations

Builing Automation System Signage Gondola

Builders Work in Connection with Nominated Subcontractors A The Main Contractor shall allow for making his own arrangements with Nominated Subcontractors as to the time and manner of the execution of their work and is to obtain full particulars of their requirements with regard to the formation in the reinforced concrete structure of all chases, recesses, holes, openings etc. and shall form these features as the concrete is placed. The Main Contractor shall allow for building in all pipes, pipe sleeves, anchors, brackets and the like sundry items supplied by the Nominated Subcontractors into concrete, reinforced concrete, brickwork and blockwork. The Main Contractor shall be responsible for ensuring that the setting out of items built into the works is correct. In the event of the Main Contractor failing to form chases, recesses, holes, openings, etc. in the structural work he will be required to cut them at his own expense. No cutting, however, shall be carried out without specific approval of the Site Project Management. In the event of pipes, pipe sleeves, anchors, brackets and the like sundry items being incorrectly positioned in the works the Main Contractor shall carry out at his own expense all necessary work to correct the error to the Site Project Managements approval. The Main Contractor shall inform all Nominated Subcontractors of the casting of reinforced concrete, allowing them sufficient time for the laying of their cables, conduit, pipes, etc.

JFP.30627.MC-RSIB

8/1

DN / 82370871.xls

Bill No. 4 - B W I C

Item No.

BILL NO. 4 - BUILDERS WORK IN CONNECTION WITH NOMINATED SPECIALIST-CONTRACTORS

Qty

Unit

Rate

Rupiahs

Builders Work in Connection with Nominated Subcontractors (Cont'd) A The Main Contractor shall allow for forming all chases, recesses, holes and penetrations through concrete work and brickwork / blockwork for the works of the Nominated Subcontractors. The Main Contractor shall allow for building or casting in all pipes, pipe sleeves, anchors, brackets and the like sundry items supplied by the Nominated Subcontractors into concrete, reinforced concrete and masonry. The Main Contractor shall allow for building in tie backs provided by the Nominated Subcontractor for Gondola System into the exterior cladding of the building The Main Contractor shall allow for supplying and installing the steel hoisting beam and hooks above each lift shaft in accordance with the requirements of the Nominated Subcontractor for Lifts

ls

15,000,000

15,000,000

ls

10,000,000

10,000,000

ls

N/A

ls

N/A

BILL NO. 4 - BUILDERS WORK IN CONNECTION WITH NOMINATED SPECIALIST-CONTRACTORS Carried to Final Summary

Rp.

25,000,000

JFP.30627.MC-RSIB

8/2

DN / 82370871.xls

Bill No. 6 - Provisional Sums

Item No.

BILL NO. 5 - PROVISIONAL SUMS

Qty

Unit

Rate

Rupiahs

Provide the Provisional Sums for work to be executed by Main Contractor which is shall be expended at the discretion of and under the direction of the Site Project Management and may be deducted wholly or in part from the Contract Sum if not required. The Main Contractor shall have no claim on these sums A Allowances for divert existing services at the site, to all pipes, ducts, stormwater, drains, sewers, electrical and telephone cables and the like during the contract, including to make good any damage due to any cause of the works Allowance for demolition existing building in accordance to the connecting and repair any damage Allowance for shelter cover to ticket booth entry, ATM room, MRI chiller room, renovation to existing chiller room, fire stops 1 Item 50,000,000 50,000,000

Item

100,000,000

100,000,000

Item

200,000,000

200,000,000

BILL NO. 5 - PROVISIONAL SUMS Carried to Final Summary

Rp.

350,000,000

JFP.30627.MC-RSIB

9/1

DN / 82370871.xls

Final Summary

Item No

FINAL SUMMARY

Qty

Unit

Rate

Rupiahs

MAIN CONTRACT WORKS to the proposed RS INTERNASIONAL BINTARO RENOVATION & EXTENSION at Bintaro, Tangerang, Banten for PT. AFFINITY HEALTH INDONESIA

FINAL SUMMARY

BILL NO. 1 BILL NO. 2 BILL NO. 3 BILL NO. 4

PRELIMINARIES STRUCTURAL WORKS ARCHITECTURAL WORKS BUILDERS WORK IN CONNECTION WITH NOMINATED SPECIALIST CONTRACTORS PROVISIONAL SUMS

Rp. Rp. Rp.

430,461,797 1,661,954,566 5,350,583,638

Rp. Rp.

25,000,000 350,000,000

BILL NO. 5

SUB-TOTAL ADD VALUE ADDED TAX 10% TOTAL CARRIED TO FORM OF TENDER

Rp. Rp. Rp. Rp.

7,818,000,000 781,800,000 8,599,800,000 8,599,800,000

Says

: Eight Billion, Five Hundred and Ninety Nine Million, Eight Hundred Thousand Only

PT. GELORA BANGUN LESTARI

Ir. Iswanto Supangkat Contractor's Signature

.............................................................. Witness's Signature

Address :

Date :

Jl. Puri Kencana, Blok K7 No.3-H, Rukan Puri Niaga, Jakarta 11610 13 April 2009

Address :

Date :

Jl. Puri Kencana, Blok K7 No.3-H, Rukan Puri Niaga, Jakarta 11610 13 April 2009

JFP.30627.MC-RSIB

10 / 1

DN / 82370871.xls