Professional Documents
Culture Documents
13v401 Si Mech Align Small
13v401 Si Mech Align Small
13v401 Si Mech Align Small
1-2: CONFIRMATION AND ADJUSTMENT OF TENSION POST POSITION 1. Set to the PLAY mode. 2. Adjust the adjusting section for the Tension Arm position so that the Tension Arm top is within the standard line of Main Chassis. 3. While turning the S Reel clockwise, confirm that the edge of the Tension Arm is located in the position described above.
Standard line of Main Chassis
Tension Arm
Fig. 1-2-A
Adjusting section for the Tension Arm position
Tension Band
The Tension Arm top will move to the inside direction of the Main Chassis. Bend
The Tension Arm top will move to the outside direction of the Main Chassis.
Fig. 1-2-B
Fig. 1-1-A
Reel Disk Height Adjustment Jig (JG024A)
1-3: CONFIRMATION OF PLAYBACK TORQUE AND BACK TENSION TORQUE DURING PLAYBACK 1. Load a video tape (T-120) recorded in standard speed mode. Set the unit to the PLAY mode. 2. Install the tentelometer as shown in Fig. 1-3. Confirm that the meter indicates 20 2gf in the beginning of playback. USING A CASSETTE TYPE TORQUE TAPE (JG100A) 1. After confirmation and adjustment of Tension Post position (Refer to item 1-2), load the cassette type torque tape (JG100A) and set to the PLAY mode. 2. Confirm that the right meter of the torque tape indicates 50~90gfcm during playback in SP mode. 3. Confirm that the left meter of the torque tape indicates 25~40gfcm during playback in SP mode.
Tentelometer
Reel Disk
(B)
Fig. 1-1-B
Video Tape
P1 Post
Guide Roller
Fig. 1-3
D2-1