AbhisekBanerjee (4,7)

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

HIG-L4, Niva Park, Phase II Garia.

Kolkata 700 086

abhisek.bb@gmail.com +91-9874391968 (M) +91-33-25251449 (R)

Abhisek Banerjee
Self Summary Experience I
2.7 years Experience in the field of Electronic Energy Metering Industry. In depth knowledge in energy metering & management systems.
February 2006 till date Landis+Gyr Limited (www.landisgyr.com), Indian Entity of Landis+Gyr AG, Switzerland.

Executive Marketing & PM Product Management o Managing New Product introductions into the market. o o o Probe, Attending Industry representation, product testing at utilities. Attending pre-bid discussions at different utilities. Interactions to different manufacturers regarding compatible accessories (MRI,

CT etc.) o Providing Market analysis, investigating opportunities for increased/new business. o Generation of Marketing and Product specifications. o Ensuring products are compliant with regulations and standards in allocated markets. o Authoring and checking of technical literature and data sheets. o Provide technical input to tenders to enable successful completion of tenders

Product Development Meters o Preparing R&D specification. o o o o Finalizing development specifications Comparing 1st Phase development with marketing specs. Complete field-testing of products. Providing marketing inputs and recent trends to R& D.

Software o Coordinating development of Windows based Base Computer Software (BCS) for Polyphase meters. o Development of MRI software. o Testing of software in field conditions.

Training o Provide technical details, sales support to the Sales Organizations nationally. o o Coordinating Installation of metering systems in HT and power plants Providing on site training to customers.

II

July 2005January 2006 Secure Meters Limited (www.securemeters.com)

GET 100% Metering Project, WBSEB (A 100 crore project) o Erection, Testing & Commissioning of 0.2 & 0.5 Class static energy meters o o with communication equipments , CTs & PTs. Commissioned Energy Meters up to 400KV TO 0.4 KV. Preparation of monthly Energy Management Report on ATC Loss, Line Loss, Load Flow, Profiles for WBSEB

Asst. Project In charge Distribution Transformer Project o Erection, Testing & Commissioning of 0.5 Class static energy meters with LPR, CTs. o Co-ordination between WBSEB and Contractors. o Responsibilities: Responsible for Erection, Testing, Commissioning of 5000 DTM across 2 districts of North Bengal. o Achieved full target of installation including submission within time.

Education

Degree

Institution / Board

Year

% / CGPA 83.5 % 76.3% 81.0%

B.Tech (Electrical Engineering) Senior Secondary Secondary

JIS College of Engineering, Kalyani, WBUT Harnett High School, WBCHSE Harnett High School, WBBSE

2005 2000 1998

Computer Skills

OS: Windows, Linux Tools: MS-Ofice, Excel, Power Point Design Tools: CAD,P SPICE,MATALAB Energy Management and AMR Softwares, Tools. DOB: 7th November, 1981 Language Proficiency: English, Hindi, Bengali

Personal Detail s

You might also like