2VCO_000096
Classification: Internal
Status: Final
Page 1 of 11
Doc. No. SAMS no: EPN D&W.2VCO_000096 Valid from Rev. no.
Table of contents
1 2 2.1 2.2 2.3 2.4 3 3.1 3.2 3.3 Summary................................................................................................................................................................. 4 Background and verification performance ............................................................................................. 4 Reference ............................................................................................................................ 4 Participants ......................................................................................................................... 5 Programme.......................................................................................................................... 5 Findings and closing of actions............................................................................................ 5 Verified elements ............................................................................................................................................... 6 Rig specific matrix, operating procedures and risk analysis.................................................. 6 Competence and training..................................................................................................... 7 Attachment 1 - Checklist ..................................................................................................... 8
Classification: Internal
Status: Final
Page 3 of 11
Doc. No. SAMS no: EPN D&W.2VCO_000096 Valid from Rev. no.
Summary
Odfjell drillings systems for manual pipe handling were verified on the 14th of December 2009 according to the OLF/NR-081 recommendations and the Statoil requirements. A defined checklist was reviewed, and a total of 4 observations were identified. 1 of the observations was classified as a non conformity. The non conformity refers to the fact that Odfjell does not use the accepted deviation matrix for manual pipe handling on Visund. In general, Odfjell demonstrated systems for manual pipe handling adapted to each rig. No common procedure describing manual pipe handling was established, but such a document on Level-3 of Odfjells management system was in the process of being implemented. As per today all manual handling procedures were therefore being identified for each rig/platform.
2.1
Reference
PSA Facilities regulation, section 55 PSA Activities regulation, section 80 OLF/NR Recommended guidelines for remote pipe handling Rev. 02 Statoil: DW T-06-05 Sikkert arbeid I bore-/brnnomrder
Classification: Internal
Status: Final
Page 4 of 11
Doc. No. SAMS no: EPN D&W.2VCO_000096 Valid from Rev. no.
2.2
Participants
Interviewed personnel: Ronny J. Solheim Inge Gustafsson Tom Rune Spjeld Eva Utskott Margit Ouppstad Statoil Verification team: Rolf Hop Torleif ksendal Verification leader Drilling Supervisor EPN D&W HSE DWB OSPD OSS Rig Manager Songa Trym Operations Manager QHSE Leader MOV QHSE Mgr Opr. Norway QHSE Coord. (observer) Odfjell drilling Odfjell drilling Odfjell drilling Odfjell drilling Odfjell drilling
2.3
Programme
09.00 09.15 11.30 12.00 13.00 13.30 0915 1130 12.00 13.00 13.30 14.00 Opening meeting Interviews and document review Lunch break Interviews and document review Internal Statoil meeting Close up meeting
2.4
Classification: Internal
Status: Final
Page 5 of 11
Doc. No. SAMS no: EPN D&W.2VCO_000096 Valid from Rev. no.
3
3.1
Verified elements
Rig specific matrix, operating procedures and risk analysis
Finding 1: Observation The verified application for deviations for Songa Trym is based on a HAZID performed in 2002. In the process of preparing the new deviation matrix, updating of the existing HAZID was not considered
Classification: Internal
Status: Final
Page 6 of 11
Doc. No. SAMS no: EPN D&W.2VCO_000096 Valid from Rev. no.
Finding 4 Observation On the drawing of red zone on Visund, there is no indication where the normal entrances to the drill floor are located.
3.2
Classification: Internal
Status: Final
Page 7 of 11
Doc. No. SAMS no: EPN D&W.2VCO_000096 Valid from Rev. no.
3.3
Attachment 1 - Checklist
Nr
Ref
Requirement/Question
Comment
C/NC
Er det referanse til OLF 081 og relevante paragrafer fra offshoreregelverket i styringssystemet? Er dette inkludert i oversikten over relevant HMS regelverk?
Er gyldig og oppdatert RRHNDTERINGSMATRISE implementert for alle installasjoner? Kan dette dokumenteres Prosessen for utarbeidelse av matrisen?
Er det manuelle operasjoner med DISP som kunne ha vrt fjernoperert? Dokumenter 4 OLF 081 kap 6 Dokumenter tilhrende risikoanalyse og unntakssknad til Ptil. Hvem har sttt for risikoanalysen? (Kompetanse)
Er hndteringsprosedyrer for alle planlagte manuelle rrhndteringsoperasjoner merket M i matrise etablert? Dekker disse alle aktuelle operasjoner?
Dokumenter/Gi eksempler.
Classification: Internal
Status: Final
Page 8 of 11
Doc. No. SAMS no: EPN D&W.2VCO_000096 Valid from Rev. no.
Hva sier prosedyren om bruk av elevatorer? 8 Hvordan dokumenteres slike gjennomganger? Gi eksempler.
Er det etablert en prosedyre/prosess for en situasjon der en ikke planlagt manuell operasjon oppstr.
OLF 081 kap 6 Utfres SJA fr en ikke planlagt manuell operasjon, (ref rig spesifikk prosedyre) f.eks ved. Utstyrsvikt.
Hvordan dokumenteres dette (inkl deltakere)? Gi eksempler. Gi eksempler p en slik SJA Ved svikt i system for rrhndtering: Blir flytskjema (OLF 081 vedlegg 2) gjennomgtt fr manuell hndtering iverksettes.? Blir dette dokumentert og vedlagt Rapport Etter Hendelse?
10
11
Hvordan gjres OLF 081, riggspesifikk matrise og hndteringsprosedyre(r) for den enkelte del-operasjon lett tilgjengelig for brukerne?
Classification: Internal
Status: Final
Page 9 of 11
Doc. No. SAMS no: EPN D&W.2VCO_000096 Valid from Rev. no.
13
Er gjeldende prosedyrer for manuell hndtering til enhver tid oppdatert i riggspesifikk matrise?
Hvordan sikres dette, f.eks ved nytt utstyr, nye krav etc? 14 OLF 081 kap 6 NORSOK R003 vedl B Gis simulatortrening? (Br krav) Dokumentert kompetanse til personell som er direkte involvert i rrhndteringsoperasjoner.
Tilpasses opplringen den enkelte? (erfaring f.eks) 15 OLF 081 kap 6 16 OLF 081 kap 6 Er ndoperering av rrhndteringsutstyr inkludert i treningen? (BR krav) Hvordan er trening og kompetanse registrert i treningsmatrisen, eller hvordan p annen mte dokumenteres opplringen? I DBR? 17 OLF 081 kap 6 Hvordan oppdateres ndvendig kompetanse? Definerer hver innretning behovet for trening? 18 OLF 081 kap 6 Er treningen basert p mulig svikt i utstyr som normalt fjernopereres?
Hva er minimumsfrekvens? Hver offshoreperiode (BR krav) 19 OLF 081 kap 6 Tilpasses treningen personell sammensetning, gruppekompetanse og nytt utstyr. (BR krav)
20
Hvordan sikres det at utstyr som benyttes, til enhver tid har oppdatert bruksanvisning og dokumentasjon iht. gjeldende regelverk?
21
Hvilken riggspesifikk matrise er oversendt til Ptil? Er dette den samme som gjeldende
Classification: Internal
Status: Final
Page 10 of 11
Doc. No. SAMS no: EPN D&W.2VCO_000096 Valid from Rev. no.
matrise? 22 OLF 081 kap 7 Unntak fra plagte krav slik disse er beskrevet i OLF081 vedlegg 1: Avviksmatrise?
23
Basert p rrdimensjoner? 24 OLF 081 kap 8 Er flgende utstyr merket? Elevatorer Inserts for multirange elevators Slips Inserts for multirange slips Lftesubbe