Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Name of the Project Design and construction of special steel bridges across rivers mahi and sabarmati involving

g bridge structure, approaches (of 100m length from abutments on both sides) in formation in embankments / cuttings, guiide bunds and protection works including testing and commissioning on design-build lump sum price basis for ikbalgarh vadodara section of western dedicated freigh corridor Qualification Criterion 1. Lead partner should be a Japanese Company 2. Minimum average annual construction turnover of US$ 30 million 1, calculated as total certified payments received for contracts in progress or completed, within the last five (5) years. Note 1: For average annualconstruction turnover, the turnover related to all activities consisting of building/ assembling /erection of physical assets, transportation infrastructure, manufacturing plants, pipe lines, power projects, transmission lines, manufacturing and erection of steel structure, railway project, refineries etc. shall be considered 3. Special Construction Experience - Experience exclusively in the role of Single entity (a Prime Contractor) orPartner in existing or past JV , in at least a) Single contract of 30 million US$ OR b) Two (2) contracts of 20 million US$ each within the last ten (10) years, (prior to the application submission deadline) that have been Substantially Completed or have received Taking-over Certificate for whole of the Works as the result of successfully and substantially completed and that are similar to the proposed Works, i.e. construction of Major Bridges / Important Bridges across perennial rivers / lakes / sea / sea creeks The similar works pertaining to Railways, Highways, Sea Ports Projects shall only be considered.The project shall be considered to have been Substantially Completed if the Applicant has received paymentagainst the work done to the extent of 90% or more of the contract value The similarity shall be based on the physical size, complexity, methods/technology or other characteristics 4. For the above or other contracts executed during the period stipulated above, a construction experience, as prime contractor, management contractor, or subcontractor, in the following key activities: minimum 250 m of well sinking of dia not less than 6m for Major Bridges / Important Bridges across perennial rivers / lakes / sea / sea creeks in any one year (Calendar Year or Financial Year) OR minimum 9500m of Piling of dia not less than 1.0m for Major Bridges / Important Bridges across perennial rivers / lakes / sea/ sea creeks in any one year (Calendar Year or Financial Year) and minimum length of 300m of fabrication and erection of open web structural steel super-structure in different spans with individual span length not less than 30.5m each for Major Bridges / Important Bridges across perennial rivers / lakes / sea / sea creeks in any one year ( Calendar Year or Financial Year)

You might also like