Professional Documents
Culture Documents
BP-HZN - BLYOO349O94: Exhibit No. - Worldwide Court Inc
BP-HZN - BLYOO349O94: Exhibit No. - Worldwide Court Inc
;: ::
?t-r3
Exhibit No. Worldwide Court Inc.
BP-HZN.BLYOO349O94
GoMD&C HSSE GoM Gustodlan: Dave Castro D&CHSSE Advloor Manaser Mgmt Doc. Adnln:Sr.OoM H$SE Doc.
Adnlnisbator
1,0Purpoger$cope (TODDI Anrerica arc Nortlr NAM) involved the GOMDrilirg andCompletlons in BPandTransocean to Conlractor of NAMas sn lndependent entalls utilization TODDI the Program. program Thls perform NAMandBPto nsure workaselgnnrents behalf BP.lt le thorosponslblllty TODDI on of of in to that all systems h place enables operations beconducted a safe are hal HSEmanagement mann6r. all the through \4,hich System provldes frarnework that NAMhasan HSEManagement TODDI of HsE TODDI NAMin theimplementa[onthetu are BP operations oonduqted. wllleupport as with eafoguards roquired BP.This System {heprimary ru syatem additional by Management NAM BPHSE / of the also out / accounlabilities jointTODDI document spolls therosponsibilities Team. Steering
CONFIDENTIAL
BP.HZN.BLYOO349O9
Drllllng lnc. (TODDINAM) HsE BP/Gulfof Mexlco (GoM)Transoceanoftshore Deepwater Slptern Brldging Document Management Systanns Table 2.0HSEManagement TODDI between tableprovides brmfidown,by toplc,of the programInterfaces a The following requlremenb, Referencenumbers Systemsand BP'Baddttlonal NAM's HSE Management (XX) relerto TODDINAMsectionandsubsecton.
AddltionalBP Requlrements requifg a operations r) All man-ridfrrg PTW is b) Secondary protection requhed fall point- not anchor wllh an Independent on mainllft point.
Contractorwill dev6lop and
PPE:(4:2.41
Resplratory Protecllon
a Resplratory implement written the Prograrn mete that Protectlon OSHAResphatory Protection Standard 1$tQuartr2009. by Typet lifeveststo be usedduring all personnel over transtero water to MOCrequirod anyworker work for of in excess 28 continrrcus withrn days a42My peiod (HlPo, AllSerlous Incldents DAFWC, and Medlcal Trealmenl, Reslricted Work) be investigated wlll andledby ToDDINAMand supported BPto identify cause by root andconecdve acdon8 wlthln30 day timofame sgtfonhIn BP reporting guidellnes. All Diveoperations mustbe approved fryBP,whlleworklng BP for
DiveOperations
CONFIDENTIAL
BP.HZN-BLYOO349O96
Drllling lnc. (TODDI}{Atvl)HSE OffshoreDeepwater BP/culf of Mexlco (GoM)Traneocean SyslemBrldging Document Management NAM 3,0 BPTTODDI HSESteerlnoTeam; of the managln issueswithinexieting to An HSEStering Teamwill be formed facllltrale efficient of of HSE systemsand lhe inplernentatlon new HSE inftlatlves.The management the HSE to BP Syetemwlll be a jolnt effort belvreen and TODDINAI\4 ensureconsistent Management gape. syelerrc, theilelmente identified and of management understarrdlngall respective personnel, frornBP and TODDIf{AM. of Teamwlll consist rlg andshore-baeed The HSESteering (TheCore intedaces the between companles of dailyfuncllonlng The Teamwlll oonsist the existing bads(Extendad Team). supportsd an bymanagemnton as needed Team),
Corc Toam (Ce.chalr) (Ceohai0 BPGoMD&CHSEAdvisor TODDT NAMHSEGoordinator NAMOIM BP GoMD&CFleld$afetyAdVsor(s) TODDI TODDI NAMRigManager BPGoMD&CWellsTeamLeader(s) BP GoMWellSiteLeade(s) Team E)dended NAMOperations TODDI Manager NAMQHSE Manager TODDI Manager TODDI NAMDivislon
quarterly rwiew/address ard related TheCoreTeamwillconvene, lo HSE bsuesandany leseonE to ftornwitheachof lhe two organizaliono mayimpact that loarned changea improvnents HSE or on the facility.The Extended Teamwil coflvene, requested lheCorTam. as by Theprimary functhnwillba as follows; 1.To resolve BPffODDINAMgapoin the HSEeystem.Manage resolution gapsacross of ihe the dlfierent buslness unltsIn the GoMoperaung area. 2. To review implement programo, wellas delelion chargee theexieting and new ae or to programs. CoreTeamwillbo charged submlttlng planof implementatlonthe The to with a Extended Teampriorlo implementation presentation per$onnol thefaciliiy.Thlsplan and to on should ouglne vihathe programB withlnthe lntentls, howlt lils lntothe cunentHSEsystems parties under program whenanyapplicable companioe, the responsible w{,to are lhe and reporting willtakeplace.
CONFIDENTIAL
BP.HZN-BLYOO349097
Drllling lnc. (TODDINAM)HSE BP/Gulfof Mexico(GoM)TransoceanOllshore Deepwater Management SystemBrldging Document 4.0 RevlsionLoo
Revlslon Deie OctZq.20os Authorlty Name GoM HSSE Dkector, CurtisW. Jackson Gustodlan llame HSSECornplianoo SteveTin* Manager, Revlslon Dtallg to Changedauthority CurdsJackson;changed cusiodianto Stev6Tink. No otherclntent changes.
StveTlnk
DaveGastro
A) Perbrmd document reyiewagainstSMB ohanges.Lhdated to document moel BP GoM9PU and TODDI NAMSMSchanges.. . Addod Fall Protection Remoed MOC,SSE, HUET,FRC, Work Hourc, ElectrlcaI Safety, Mechanlcal Scaffoldlng, Lifting,Hazqrdous Envhonmental Materials, Prooedutoe and Policies, B) Documentation and ChangedCustodian Authority.
asft'u2006
Curtis Jeckson W.
Msd(E. Webster
updabd clrcumentto meet Safe Praotices manualrevlsloris.' Changedmax work hoursto rneel DWOP manual. Extended deliverdale of SSE progremto June 06 . Extendeddellvory date ol Respirato protection ry . plogremto Dec OG RewordedFRC requlraments.Added on restrictions chain usageas tiftinggear r Eleqtical Saiety (GFCI) . Dive Operations and Irntlaltirgnang lssue. Nover postod to tho GoM HSSEwebsite.
oar2u2005
MarkE.Webster
CONFIDENTIAL
BP-HZN-BLYOO349098