EBTQ 3103
SAMPLE
QUALITY CONTROL
MATRICULATION NO
TELEPHONE NO.
LEARNING CENTRE
EBTQ3103
Answer 1
a) i. The sample average,
= (X1+X2+X3..+Xn) / n
= (11.95+12.00+12.03+11.98+12.01+12.03+12.02+11.96+12.00+11.98+12.01+12.00+11.97+11.98+
12.00+11.97+11.98+12.00+12.03+11.99+12.00+12.01+12.02+12.03+12.02+11.98+11.98+12.00+
12.01+11.99+12.00+12.01+12.03+12.00+11.98+12.00+12.01+12.04+12.00+12.02+12.00+12.02+
11.96+12.00+11.98+12.02+12.00+11.97+12.05+12.00) / 50
=12.00 cm
ii. The sample standard deviation, s.
=
= 0.0218
b) i. The mean of the process,
= (X1+X2+X3..+Xn) / n
=(601+600+601+598+597+598+602+600+600+599+596+601+599+601+600+602+599+598+597+601+
598+ 598+596+601+598+600+597+601+599+600+597+600+598+600+599+598+596+599+602+601+
599+600+601+599+599+600+599+598+598+600) / 50
=599.22
1
EBTQ3103
ii. The inherent capability of the process.
=3
50
= 124.58 /50
= 1.58
Therefore, 3
=599.22 3 (1.58)
=599.22 4.74
=599.22 + 4.74 and 599.22 4.74
=603.96 and 594.48
Hence, the Inherent Capability is from 594.48 to 603.96 as shown in figure 1.1.
EBTQ3103
iii. The Cp and Cpk
Cp = USL-LSL
6
= 605-595
6 x 1.58
= 10 / 9.48
= 1.05
Since Cp = 1.05 is between 1 < Cp < 1.6 .Therefore the process is somewhat medium relative
capability.
Cpk= minimum USL-
3
or - LSL
3
3 x 1.58
EBTQ3103
Answer 2
a) The x and R charts for this process.
The grand average or central line for X-bar chart is :-
= (0.50345+0.50342+0.50316+0.50315+0.50350+0.50341+0.50326+0.50338+0.50348+
0.50336+0.50319+0.50386+0.50354+0.50340+0.50371+0.50349+0.50335+0.50317+
0.50340+0.50351+0.50337+0.50328+0.50335+0.50342) / 24
= 0.50340
The grand range or central line for R-chart is :-
=(3+4+4+4+5+6+4+3+7+8+3+9+8+6+5+7+4+3+8+4+2+1+3+2) x 10-4
24
= 4.7 x 10-4 or 0.00047
The control limit for X-bar and R-chart:and
= 0.50340+0.577(0.00047)
= 0.50340 - 0.577(0.00047)
= 0.50367
= 0.50313
and
= 2.114(0.00047)
= 0(0.00047)
= 0.000994
=0
Therefore, the x and R table 2.1 was created to get the x and R charts as shown in figure 2.1 for
this process is as the .From the chart, the process is consider as under statistical control although
only 2 point above UCL or out of control but the previous and consecutive points are within the
control range. The investigation is needed to the special cause variation and the process adjustment
may not required.
EBTQ3103
Sample
Number
CL( )
UCLx
LCLx
UCLR
LCLR
CL( )
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
0.50345
0.50342
0.50316
0.50315
0.50350
0.50341
0.50326
0.50338
0.50348
0.50336
0.50319
0.50386
0.50354
0.50340
0.50371
0.50349
0.50335
0.50317
0.50340
0.50351
0.50337
0.50328
0.50335
0.50342
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50340
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50367
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.50313
0.0003
0.0004
0.0004
0.0004
0.0005
0.0006
0.0004
0.0003
0.0007
0.0008
0.0003
0.0009
0.0008
0.0006
0.0005
0.0007
0.0004
0.0003
0.0008
0.0004
0.0002
0.0001
0.0003
0.0002
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0.000994
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.00047
0.50340
0.00047
Table 2.1: x and R control table
EBTQ3103
= Pr
LSL
< x
EBTQ3103
< USL
1.931 x 10 -4
1.931 x 10 -4