planning software in an organization. The SAP implementation method described in this entry is a generic method and not a specific implementation method as such. It is based on best practices and case studiesfrom various literature sources and presents a collection of processes and products that make up a complete implementation method to allow any organization to plan and execute the implementation of SAP software.
Introduction
The implementation of SAP software, such as SAP R/3 is almost always a massive operation that brings a lot of changes in the organization. The whole process can take up to several years. Virtually every person in the organization is involved, whether they are part of the SAP technical support organization (TSO) or the actual end-users of the SAP software. The resulting changes that the implementation of SAP generates are intended to reach high level goals, such as improved communication and increased return on information (as people will work with the same information). It is therefore very important that the implementation process is planned and executed with the usage of a solid method. There are various SAP implementation methods. An example of how one company, Robert Bosch GmbH, implemented SAP R/3 over 10 years is available. This study shows that designing IT architecture is very critical in SAP implementation practices.
Concept
Definition
CHANGE MANAGEMENT
***Activities involved in (1) defining and installing new values, attitudes, norms, and behaviors within an organization that support new ways of doing work and overcome resistance to change; (2) building consensus among customers and stakeholders on specific changes designed to better meet their needs; and (3) planning, testing, and implementing all aspects of the transition from one organizational structure or business process to another. (www.gao.gov)
All documentation that is required and being delivered whilst performing change management, e.g. the functional test cases and all the other documents a new end-user of SAP requires and the various tools and approaches used to manage change by the TSO. (Anderson, 2003)
Determination of where and when the costs are inquired within the context COST OF OWNERSHIP of the SAP solution stack and ongoing operations. The analysis addresses ANALYSIS all internal and external costs, both one-time as well as recurring (Anderson, 2003)
CUTOVER
The process of transitioning from one system to a new one (Anderson, 2004)
CUTOVER PLAN
All documentation related to planning, preparing and executing cutover, describing how to lock down the system from a technical change managementperspective, preparing the TSO for its new role and rolling out the SAP graphical user interface to all future end users. (Anderson, 2003)
DATA CENTER
A data center is a facility used for housing a large amount of electronic equipment, typically computers and communications equipment. (www.wikipedia.org)
A requirement for the SAP data center, i.e. a physical requirement like power requirements, a rack requirement, a network infrastructure requirement or a requirement to the network server. (Anderson, 2003)
DISASTER RECOVERY Requirement that focuses on downtime that lasts many hours to days or (DR) REQUIREMENT even weeks (Anderson, 2003)
A set of conditions or variables under which a tester will determine if a certain business process works (www.wikipedia.org)
Requirements that describes the amount of time that the system needs to be available to satisfy the needs of the users. (Anderson, 2003)
INSTALLATION DOCUMENTATION
All documentation related to the installation of an end-to-end SAP solution (Anderson, 2003)
OPERATIONS MANUAL
The collection of current state system documentation, day-to-day and other regularly scheduled operations tasks, various installation and operations checklists and how-to process documents. (Anderson, 2003)
SAP
head office is in Walldorf, Germany. SAP was founded in 1972 as Systemanalyse and Programmentwicklung ("Systems Analysis and Product") by five former IBM employees in Mannheim, Germany. (www.wikipedia.org)
A comprehensive project plan that contains all products that are delivered whilst performing an SAP implementation project (Anderson, 2003)
SOLUTION STACK
Set of software subsystems or components needed to deliver a fully functional solution, e.g. a product or service. (www.wikipedia.org)
A list of all vendors that deliver the products that make up the SAP solution stack (Anderson, 2003)
SOLUTION VISION
A test plan that is focused at determining the stability of a given system or entity. It involves testing beyond normal operational capacity, often to a breaking point, in order to observe the results. (www.wikipedia.org)
TEST PLAN
A detail of how the test will proceed, who will do the testing, what will be tested, in how much time the test will take place, and to what quality level the test will be performed. (IEEE 829)
TRAINING
The acquisition of knowledge, skills, and attitudes as a result of the teaching of vocational or practical skills and knowledge that relates to specific useful skills (www.wikipedia.org)
TRAINING PLAN
Consisting of training units, a training plan is the result of hierarchical decompositions of a training goal, tailored according to the learning preferences and prior knowledge of the trainee. A plan is the means by which the trainee satisfies the goal. (www.ece.eps.hw.ac.uk/)
TSO
Technical Support Organization. The people that are committed to implementation and management of SAP. (Anderson, 2003)
TSO CHART
Activity table
The following table provides a summary of all of the activities that form the SAP implementation process. These activities will be described with more detail and elaborated with examples in the rest of this entry. Activity Sub-Activity Description
Refine and communicate a SOLUTION VISION of the future-state of the SAP solution, to sketch a design that meets both business and financial requirements. The focus should be on the companys core business and how the SAP solution will better enable that core business to be successful. Some of the guidance and key requirements for how to put together an ERP and SAP business case for ROI, business benefit, and success includes focusing on competitive pressures, value propositions, and how the solution enables success.
Design and staff the key positions of the SAP Technical Design and initially staff Support Organization (TSO), the organization that is the SAP TSO charged with addressing, designing, implementing and supporting the SAP solution.
Perform a COST OF OWNERSHIP ANALYSIS to determine how to get the best business solution for the least money i.e. to determine where and when the costs are incurred within the context of the SAP solution stack.
Determine all HIGH AVAILABILITY and DISASTER RECOVERY REQUIREMENTS, to plan what to do with later downtime of the SAP system
Select the best SAP hardware and software technology partners for all layers and components of the SAP SOLUTION STACK, based on a side-by-side sizing comparison
Staff TSO
Staff the bulk of the TSO, i.e. fill the positions that directly support the near-term objectives of the implementation, which are to develop and begin installation/implementation of the SAP data center.
Executetraining
Train the various members of the SAP TSO, like data center specialists, high availability specialist and network specialists and train the end-users to give all the required SAP knowledge and skills
Build a new SAP DATA CENTER facility or transform the current data center into a foundation capable of supporting the SAP SOLUTION STACK
Perform installations
Install the (My)SAP components and technological foundations like a web application server or enterprise portal.
Identify and staff the remaining TSO roles, e.g. roles that relate to help desk work and other such support providing work.
Develop a planned approach to the changes in the organization. The objective is to maximize the collective efforts of all people involved in the change and minimize the risk of failure of implementing the changes related to the SAP implementation.
Create a foundation for the SAP systems management and SAP computer operations, by creating a SAP OPERATIONS MANUAL and by evaluating
Test the SAP business processes, by executing functional tests to ensure that business processes work, integration tests to ensure that the organizations business processes work together with other business processes and regression tests to prove that a specific set of data and processes yield consistent and repeatable results.
Perform systems and stress tests Final Preparation Prepare for cutover
Plan, script, execute and monitor SAP STRESS TESTS, to see if the expectations of the end users, defined in service level agreements, will be met.
Plan, prepare and execute the CUTOVER, by creating a CUTOVER PLAN that describes all cutover tasks that have to be performed before the actual go-live
Go Live
Implementation processes
Project preparation
The project preparation phase, depicted below, focuses at two main activities, i.e. to make a setup for the TSO and to define a solution vision. These activities allow anorganization to put in on the right track towards implementation. Design and initially staff the SAP TSO The first major step of the project preparation phase is to design and initially staff an SAP technical support organization (TSO), which is the organization that is charged with addressing, designing, implementing and supporting the SAP solution. This can be programmers, project management, database administrators, test teams, etc. At this point, the focus should be at staffing the key positions of the TSO, e.g. the high-level project team and SAP professionals like the senior database administrator and the solution architect. Next to that, this is the time to make decisions about choosing for internal staff members or external consultants. The image at the right shows a typical TSO chart. Craft solution vision
The second project preparation job is to define a so-called solution vision, i.e. a vision of the futurestate of the SAP solution, where it is important to address both business and financial requirements (budgets). The main focus within the vision should be on the companys core business and how the SAP solution will better enable that core business to be successful. Next to that, the shortcomings of the current systems should be described and short but clear requirements should be provided regarding availability (uptime), security, manageability and scalability of the SAP system.
installation/implementation of the SAP data center. Examples are: data center experts, network infrastructure experts, security specialists and database administration experts. There are many ways to find the right people within or outside the organization for all of the TSO positions and it depends on the organization how much time it wants to spend on staffing. Training One of the most vital stages of the implementation process is training. Very few people within an organization are SAP experts or even have worked with SAP software. It is therefore very important to train the end users but especially the SAP TSO: the people who design and implement the solution. Many people within the TSO need all kinds of training. Some examples of these positions: SAP Network Specialists SAP Database Administrators SAP Security specialists Documentation specialists Et cetera
All of these people need to acquire the required SAP knowledge and skills or even SAP certifications through training. Moreover, people need to learn to do business in a totally new way. To define how much SAP training every person needs, a company can make use of a skillset matrix. With this matrix, a manager can identify who possesses what knowledge, to manage and plan training, by defining the height of expertise with a number between e.g. 1 and 4 for each skill for each employee. Setup SAP data center The next step is to set up the SAP data center. This means either building a new data center facility or transforming the current data center into a foundation capable of supporting the SAP solution stack, i.e. all of the technology layers and components (SAP software products) in a productive SAP installation. The most important factor when designing the data center is availability. The high availability and disaster recovery requirements which should have been defined earlier, give a good idea of the required data center requirements to host the SAP software. Data center requirements can be a: Physical requirement like power requirements Rack requirement Network infrastructure requirement or Requirement to the network server.
Perform installations The following step is to install the required SAP software parts which are called components and technological foundations like a web application server or enterprise portals, to a state ready for business process configuration. The most vital sub steps are to prepare your OS, prepare the database server and then start installing SAP software. Here it is very important to use installation
guides, which are published for each SAP component or technology solution by SAP AG. Examples of SAP components are: R/3 Enterprise Transaction Processing mySAP BI Business Information Warehouse mySAP CRM Customer Relationship Management mySAP KW Knowledge Warehouse mySAP PLM Product Lifecycle Management mySAP SCM Supply Chain Management mySAP SEM Strategic Enterprise Management mySAP SRM Supplier Relationship Management mySAP HCM Human Capital Management
Round out support for SAP Before moving into the functional development phase, the organization should identify and staff the remaining TSO roles, e.g. roles that relate to helpdesk work and other such support providing work.
Functional development
The next phase is the functional development phase, where it is all about change management and testing. This phase is depicted below. Address change management The next challenge for an organization is all about change management / change control, which means to develop a planned approach to the changes the organization faces. The objective here is to maximize the collective efforts of all people involved in the change and to minimize the risk of failure of implementing the changes related to the SAP implementation. The implementation of SAP software will most surely come with many changes and an organization can expect many natural reactions, i.e. denial, to these changes. To fight this, it is most important to create a solid project team dedicated to change management and to communicate the solution vision and goals of this team. This team should be prepared to handle the many change issues that come from various sources like: End-user requests Operations Data center team DBA group Systems management
SAP systems and operations management Next thing is to create a foundation for the SAP systems management and SAP computer operations, by creating a SAP operations manual and by evaluating SAP management applications. The manual is a collection of current state system documentation, day-to-day and
other regularly scheduled operations tasks, various installation and operations checklists and howto process documents. Functional, integration and regression testing Testing is very important before going live with any system. Before going live with a SAP system, it is vital to do many different kinds of testing, since there is often a large, complex infrastructure of hardware and software involved. Both requirements as well as quality parameters are to be tested. Important types of testing are: Functional testing: to test using functional use cases, i.e. a set of conditions or variables under which a tester will determine if a certain business process works Integration testing Regression testing
All tests should be preceded by creating solid test plans. Agreements will be met. This can be done with SAPs standard application benchmarks, to benchmark the organizations configurations against configurations that have been tested by SAPs hardware technology partners. Again, a test plan should be created at first.
Final preparation
Prepare for cutover The final phase before going live with SAP is often referred to as the cutover phase, which is the process of transitioning from one system to a new one. The organization needs to plan, prepare and execute the cutover, by creating a cutover plan that describes all cutover tasks that have to be performed before the actual go-live. Examples of cutover tasks are: Review and update all systems-related operations procedures like backup policies and system monitoring Assign ownership of SAPs functional processes to individuals Let SAP AG do a GoingLive check, to get their blessing to go live with the system Lock down the system, i.e. do not make any more changes to the SAP system
Go live
All of the previously described phases all lead towards this final moment: the go-live. Go-live means to turn on the SAP system for the end-users and to obtain feedback on the solution and to monitor the solution. It is also the moment where product software adoption comes into play. More information on this topic: Product Software Adoption: Big Bang Adoption Product Software Adoption: Parallel Adoption Product Software Adoption: Phased Adoption
In order to successfully implement SAP in an organization, there are several things that are of great importance: 1) Choose the correct SAP Consultants to have the correct blueprint. An SAP Consultant is a professional who has the skills to speak to the managers of a company and help them creating the blueprint. For this the SAP Consultant has the business skills of the business area he/she is working with, and also masters this area on SAP. For example, if this is SAP FI (accountancy) Consultant, this person is an expert on accountancy and payments, gained through experience or by the corresponding studies at the University. Also this person knows SAP FI because has gained by the corresponding training, or the course on the SAP Partner Academy or similar. Benefits: As this person knows about Accountancy he or she will understand the needs of the business and will bring it into reality. 2) SAP R/3 implementation is not an IT project, in fact is an Organization Project impacting all levels of a company. So it is very important to get the support from all the people that are involved in implementing SAP, but more important the participation and commitment of all levels, specially managers, of the company. 3) The Blueprint is the keystone used as the lighthouse who must guide the whole project. A blueprint should never be a merely mapping of IT systems. In fact a blueprint is bringing the strategy of a company into execution through defining its processes across all business areas. Many projects have failed because the focus was on having people with SAP knowledge, but with no business skills and so defining something that works...wrongly. Just remember, processes must change across time, and a manual error automated could be repeated infinitely. 4) Always consider changing the way things have been done before implementing SAP. "This has always been done like this and the Consultant should replicate it on SAP" is the start of a big problem. SAP many times could save you time and money as it allows your organization to automate many processes. 5) Test the SAP hardware and software rigorously by testing your business processes, and to ensure that the end-users are ready to use SAP before going live, because there are many known projects that failed because of a lack of support and SAP knowledge.
6) Design and execute a Change Management Program by communicating as early as needed all the information that end users should have to accept the new technology and designing and executing a training plan in order to reassure a knowledge base within the organizations.