Professional Documents
Culture Documents
SCS Briefing - Vol. 1 Issue 2
SCS Briefing - Vol. 1 Issue 2
SCS Briefing - Vol. 1 Issue 2
The SCS process can give material a much longer shelf life than other processes (eg pickled and oiled
or hot rolled dry). So what proof is there?
Area designated for SCS Line The construction is in good hands SCS Line fully installed and commissioned Water damaged? Sprung and rusty? Rusty edges?
Area designated for SCS Line The construction is in good hands SCS Line fully installed and commissioned Water damaged? Sprung and rusty? Rusty edges?