REFERENCE : OPER/CLR/FCE/01 Clearance for Equipments _________________________ Revision : 0 | Page 1 of 9 RAJPURA POWER STATION

INDEX

A.1: Isolation Condensate Extraction Pump

REFERENCE : OPER/CLR/FCE/01 Clearance for Equipments _________________________ Revision : 0 | Page 2 of 9 RAJPURA POWER STATION

1.0

Objective: To Isolate Condensate Extraction Pump & Ensure PTW can be issued to designated maintenance Personnel to carry out the respective job on the equipment safely & ensure safety of the plant.

2.0

Responsibility: Unit Charge Engineer Field Charge Engineer

3.0 Procedure: Field Charge Engineer responsibility

Equipment Clearance:
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Check CEP is in Stopped condition. check CEP Discharge & bypass MO valve is closed Check Push button in pressed condition Selector Switch in off position Check electrical supply of CEP motor has been isolated Check electrical supply of CEP discharge & bypass MOV is isolated LOTO & Danger tags placed Check breaker earth switch is in ON position Check CEP motor cooling water is isolated Check that CEP suction valve is closed Check Both canister vent line from CEP to condenser are closed Check mechanical sealing from CEP discharge is isolated

Safety Clearance:
a. b. c. d. Ensure all foreign material have been removed from site Ensure all required scaffold, work platforms, ladder, roof platforms, safety native for fragile roof sitting around the equipment are in place safely. Check the area around the equipment to be effected has been cordoned off Check Safety PPE's with the personnel performing the job

REFERENCE : OPER/CLR/FCE/01 Clearance for Equipments _________________________ Revision : 0 | Page 3 of 9 RAJPURA POWER STATION

e. f. g. h. i.

Check other adjoining Equipments are rendered safe Check if protocol is required & given to Shift Work Personnel Clearance from Fire Department Electrical isolation is completed & no Live wires are present in the area. Check whether any toxic substance, gaseous exposure not there.

REFERENCE : OPER/CLR/FCE/01 Clearance for Equipments _________________________ Revision : 0 | Page 4 of 9 RAJPURA POWER STATION

A.2: Normalization of Condensate Extraction Pump


1.0 Objective: To Normalize Condensate Extraction Pump & Ensure the availability and healthiness of the equipment; it can be taken into normal operations & ensure plant reliability. 2.0 Responsibility: Unit Charge Engineer Field Charge Engineer 3.0 Procedure:

Equipment Clearance:
Field Charge Engineer responsibility 1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 PTW has been returned and surrendered Ensure Hotwell is filled to normal level Check suction strainer vent to Pressure balancing line is open Check mechanical sealing line from CST is normalised Check mechanical sealing from CEP discharge is normalised Check Both cannister vent line from CEP to condenser are open check CEP suction valve open CEP discharge MO valve closed LOTO & Danger tag removed Check CEP breaker earth switch in off condition Check Motor cooling water is in normalised condition Check motor bearing oil level > 60 % Check Electrical supply of Discharge MOV & Bypass MOV is normalised Check electrical supply of Motor is Normalised push button in released condition Selector Switch in remote position

REFERENCE : OPER/CLR/FCE/01 Clearance for Equipments _________________________ Revision : 0 | Page 5 of 9 RAJPURA POWER STATION

Safety Clearance:
a. b. d. e. f. g. h. i. Ensure all foreign material have been removed from site Ensure all required scaffold, work platforms, ladder, roof platforms, safety native for fragile roof sitting around the equipment are removed safely. Check Safety PPE's with the personnel performing the job Check other adjoining Equipments are rendered safe Check if protocol is required & returned by Shift Work Personnel Clearance from Fire Department No Live wires are present in the area. Check whether any toxic substance, gaseous exposure is not there.

REFERENCE : OPER/CLR/FCE/01 Clearance for Equipments _________________________ Revision : 0 | Page 6 of 9 RAJPURA POWER STATION

A.3: Normalization of Motor Driven Boiler Feed Pump


1.0 Objective: To Normalize Motor driven Boiler Feed Pump & Ensure the availability and healthiness of the equipment; it can be taken into normal operations & ensure plant reliability. 2.0 Responsibility: Unit Charge Engineer Field Charge Engineer 3.0 Procedure:

Equipment Clearance:
Field Charge Engineer responsibility

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

PTW has been returned and surrendered Check Dearator level is Normal Feedwater line Low point drains are closed Feedwater line high point vents are open Check MDBFP Main pump discharge MOV is closed Both recirculation manual shut-off valves Of MDBFP are in locked open condition check booster Pump suction valve is open Check booster pump suction strainer & casing drain are closed Check MDBFP Main Pump Suction strainer drain & casing drain are closed Check MDBFP Main pump interstage discharge manual shut-off valve is open Check MDBFP Main pump interstage discharge MOV is closed Check MDBFP lube oil level is normal. Check Auxiliary oil pump for MDBFP is running, Pr. Is normal LOTO & Danger Tag removed Check Earth Switch of Breaker in Off Position Check Electrical Supply of MDBFP is normalized

REFERENCE : OPER/CLR/FCE/01 Clearance for Equipments _________________________ Revision : 0 | Page 7 of 9 RAJPURA POWER STATION

17 18 19

Check electrical Supply of MDBFP Discharge, Bypass & Interstage MOV are Normalized Check Push button is in released condition Check Remote selection in LCS

Safety Clearance:
a. b. d. e. f. g. h. i. Ensure all foreign material have been removed from site Ensure all required scaffold, work platforms, ladder, roof platforms, safety native for fragile roof sitting around the equipment are removed safely. Check Safety PPE's with the personnel performing the job Check other adjoining Equipments are rendered safe Check if protocol is required & returned by Shift Work Personnel Clearance from Fire Department No Live wires are present in the area. Check whether any toxic substance, gaseous exposure is not there.

REFERENCE : OPER/CLR/FCE/01 Clearance for Equipments _________________________ Revision : 0 | Page 8 of 9 RAJPURA POWER STATION

A.4: isolation of Motor Driven Boiler Feed Pump


1.0 Objective: To Isolate Motor driven Boiler Feed Pump & Ensure PTW can be issued to designated maintenance Personnel to carry out the respective job on the equipment safely & ensure safety of the plant. 2.0 Responsibility: Unit Charge Engineer Field Charge Engineer 3.0 Procedure:

Equipment Clearance:
Field Charge Engineer responsibility

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Hazards pertaining to the job are identified and preventive measures taken Check LCS selector switch in OFF position Check MDBFP is not running Check Push button is in Pressed condition Check electrical Supply of MDBFP Discharge, Bypass & Interstage MOV are isolated Check Electrical Supply of MDBFP is isolated Check Earth Switch of Breaker in Off Position Check Auxilliary Oil pump is in stopped condition & Electrical Supply of AOP is isolated LOTO & Danger Tag Placed Check MDBFP Main pump discharge MOV is closed Check MDBFP Main pump interstage discharge MOV is closed Check MDBFP Main pump interstage discharge manual shut-off valve is closed Check MDBFP Main Pump Suction strainer drain & casing drain are open Check booster pump suction strainer & casing drain are open check booster Pump suction valve is closed Both reciculation manual shut-off valves Of MDBFP are in closed condition

REFERENCE : OPER/CLR/FCE/01 Clearance for Equipments _________________________ Revision : 0 | Page 9 of 9 RAJPURA POWER STATION

17 18 19

Feedwater line high point vents are open Feedwater line Low point drains are open Booster Pump & MDBFP suction pr. Gauge showing 0 ksc

Safety Clearance:
a. b. c. d. e. f. g. h. i. Ensure all foreign material have been removed from site Ensure all required scaffold, work platforms, ladder, roof platforms, safety native for fragile roof sitting around the equipment are in place safely. Check the area around the equipment to be effected has been cordoned off Check Safety PPE's with the personnel performing the job Check other adjoining Equipments are rendered safe Check if protocol is required & given to Shift Work Personnel Clearance from Fire Department Electrical isolation is completed & no Live wires are present in the area. Check whether any toxic substance, gaseous exposure not there.