ColdStorageWarehouseManual(Draft)

For

ColdStoragesWarehousesforHorticultureProduceandProcessedFoodItems
{Ref.Clause2(1)(xii)ofTheWarehousingdevelopmentandRegulatoryAuthority(WarehouseAccreditation)Regulation,2011}

February 2012

Contents

Sl.No.PartNo.&Particulars Preface
1. Form1,ApplicationFormforWarehouseAccreditation

PageNo.
Page iii
Page 1

Section1,DescriptionofColdStorageWarehouse Page 2 Section2,IdentityofWarehousemanandCapacitytoDischargeLiability Page 3 Section3,GoodstobeStored,StorageConditionsandInsuranceCover Page 4 Section4,ManagerialCompetencePage 5 Section5,StorageWorthinessofWarehouse Page 6 2. 3. Annexure1 CheckListforAccreditationAgency Page 14

Annexure 2 Guidelinesfor Grading,Packaging, MarkingandLabeling,Stackingand Storage Page18 Annexure 3 ListofcommoditiesnotifiedforissuanceofNWRsbythecoldstorage warehouses Page26

4.

ii

Preface
Department ofAgriculture&Cooperation,MinistryofAgriculturehadvideitsnotificationNo.F th No.4569/2011Hort.,Dated14 December2011,constituted atwentytwomemberCommittee for recommendingnorms foraccrediting coldstrorage. Thecompositionofthe Committeeisat Appendix1. ThetermsofReferenceoftheCommitteeareasfollows i. ii. Preparationofchecklistforaccreditationofcoldstorages/CA/MAstorages. Preparation of standards for storages, packaging and preservation of potato, apple and otherfruits&vegetableswhichcanbestoredincoldstorages/CA/MAstoragesforlong /mediumduration. AnyotherissuethattheCommitteemayconsiderimportantorrelevanttothesubjector maybeassignedtoitbytheGovernment.

iii.

ThoughShriAmitSahayAdditionalCommissionerwasinitiallydesignatedasthemembersecretaryofthe committeewhowasreplaced by ShriOMPrakash,Additional Commissioner(Hort)byanothernotification th dated 11 January 2012. Finally, Shri Sushil Singla was designated as the membersecretary of the Committee. TheCommitteeinitsfirstphysicalmeetingdecidedtocoverformofapplicationforaccreditationofthecold storage warehouse and prepare a cold storage warehouse manual. It is being clarified that provisions of generalWarehouseManual,asfarastheyarerelevanttocoldstoragewarehouses,shallbeapplicable. It is further reiterated that the Accreditation of cold storage warehouse is available only for those cold storageswhichhavebeensetupwithscientificdesignbasedonheatloadcalculationkeepinginviewcritical storage conditions, energy efficiency, environmental concern, safety of workmen and goods stored and automationof controlsanddataloggingorwhichhavebeenmodernizedandupgradedtomeettheabove mentionedbasiceligibilitycriterion. I take this opportunity to thank all the members of the Committee without whose contributions it would have been impossible to finalize Committees recommendations. Special mention is due to the valuable guidancereceived fromShriKarnailSingh, memberWDRA,Dr.S.K.Goel PrincipalSecretary(Ariculture & Marketing), Govt of Maharashtra and valuable inputs provided from Shri Gurmit Singh and Shri Prabhat Saxena. My special thanks to Dr. R. K. Sharma Sr. Deputy Director NHB and Shri Lal Singh Sr. Assistant Director, NHB who supported in making correspondences and organizing consultative meetings of the CommitteeinabsenceofmembersecretaryoftheCommittee. The recommendations of the Committee are being submitted for approval of the Government and acceptanceofthesamebyWarehouseDevelopmentRegulatoryAuthority.
th

Dated 14 February2012

BijayKumar ChairmanoftheCommittee&ManagingDirector NationalHorticultureBoard,Gurgaon 122015

iii

iv

Form 1
ApplicationformforAccreditationofColdStorageWarehouse
(Seeclauses2(1iv), 3(2) and12ofWarehousing DevelopmentandRegulatoryAuthority(WarehouseAccreditation)Regulation,2011

To, TheOfficerInCharge, ColdStorageWarehouseAccreditationAgency .. SubjectApplicationforaccreditationofcoldstoragewarehouse DearSir,

PassportSize Photoof Applicant

I, Mr./ Mrs./ Ms. ., age, son of / daughter of / wife of., Resident of villagetaluka, district. State. hereby apply for accreditationof/renewalofaccreditationofcoldstoragewarehousenamedas, situated at survey Novillage / town..district., State. The particulars of the saidcoldstoragewarehouseareenclosedherewithasSection1to Section 5. I/wehereby,declarethat:(pl.strikeoutwordsorphrasesmentionedbelowinitalicswhicharenot applicable) a. I am / we are proprietors of the cold storage warehouse; or, I am duly authorised representative of the applicant company* to make this application for accreditation / renewalofaccreditation oftheabovementionedcoldstoragewarehouse, b. IamawarethattheaccreditationisasperprovisionsoftheWarehousing(Developmentand Regulation)Act2007andrulesframedthereunder.I,hereby,undertaketoabidebyallterms &conditionsofaccreditations /renewalofaccreditation. c. All applicable laws and statutory requirements in relation to the warehouse for which the applicationisbeingsubmitted,arecompliedwith. d. I/wehereby,solemnlydeclarethatallinformationhereinfurnishedaretruetobestofmy/ our knowledge and that in case it is proved to be untrue / false, I /we undertake to indemnifypersonorpersonsconcernedinthisbusinessagainstanylossarisingoutofsuch falseoruntrueinformationandcancellationofaccreditation. Enclosures:
1.1 DemandDraft fortheamountofapplicationfeeorproofofpaymentofprescribedapplicationfee through electronictransferofmoneytowardsapplicationfee 1.2 Incaseacompanyisapplicant,thenattestedCopyofRegistrationcertificateofcompany 1.3 IncaseaCompany* isapplicant,thenattestedcopyof MemorandumofAssociationandArticlesofAssociation /Rules&Regulations 1.4 when acompany*isapplicant,then attestedcopyofresolutionofCompany formakingapplicationonits behalfforaccreditation oritsrenewal underprovisionsofWDRA2007andRules& Regulationsmadethere under,indicatingthefullparticularsofthepersonwhoisauthorisedtomakeapplicationforaccreditation 1.5 Originalcopyofauthoritytothepersontomakeapplicationasapplicantonbehalfofacompany* for accreditationoritsrenewal underprovisionsofWDRA2007whichneedtobesignedbyCEOofthecompany*if theapplicanthimselfisnottheCEOoftheapplicantcompany*. 1.6Incaseofapplicationofrenewalofaccreditation,attestedcopyoflastaccreditationbeenclosed.

Place Date

Yourssincerely, SignatureofApplicant NameofApplicant. Profession PANNO./VoterIDNo./UIDNo. PhoneNo..CellNo.

*Company hereinafterreferredto includesanylegalpersonsuchascooperativesociety,registeredfirmetc.

Section 1

DescriptionofColdStorageWarehouse
{Ref.S.2(s)oftheWarehouseDevelopmentandRegulation)Act,2007)

1. NameofColdStorageWarehouse.................................................... 2. PostalAddressofColdStorageWarehouse........................................................... .............................................................. .................................................... 3. Location ofColdStorageWarehouse a. SurveyNo..................................................... b. RevenueVillage/TownCity................................................ c. Tahsil................................................................. d. District..................................................................... e. State........................................................................ f. PINCode................................................................... g. AtSitePhoneNo......................FaxNo................................emailID ................. 4. Technical Audit report by engineer empanelled with accreditation agency to the effect of InstallationbeingasperdatasheetenclosedasPart6: a. NameandRegistrationNo.of engineerempanelled with accreditationagency/ NHB / NCCD ............................. b. Dateof issueof RegistrationCertificate.......................................................................... 5. ParticularsofIndustrialLicense(ifapplicableunderlocallaws) a. IssuingAuthority b. PeriodofValidityfrom.....................to....................... 6. ParticularsofcoldstorageLicense (Ifapplicableunderlocallaws) a. IssuingAuthority b. PeriodofValidity from.....................to....................... 7. NoObjectionCertificatefromPollutionControlBoard (ifapplicableunderlocallaws) a. IssuingAuthority b. PeriodofValidity from.....................to....................... 8. FiresafetyCertificate(ifapplicableunderlocallaws) a. IssuingAuthority b. PeriodofValidity from.....................to....................... 9. ParticularsofNoC/approvalbylocalplanningauthorityforcoldstporage 10. Ifthecoldstoragehasbeensetup asperscientificdesign?Ifyesthen ticktheapplicableoption a. In accordance with technical standards prescribed by Department of Agriculture & CooperationandunderGovt.scheme.Ifso,particularsofschemeandletterofintentissued bequoted..................................... or, b. Inaccordancewith anyothernationalorinternationallyrecognisedstandarddesignpractice based on heat load calculation keeping in view critical storage conditions of goods to be stored, energy efficiency, environmental concern, safety of work men and goods, automation in control etc.,then the design methodology followed must be quoted ..

Date......................SignatureofApplicant Place....................... (NameofApplicant)

Section 2 IdentityofWarehousemanandCapacitytoDischargeLiability
{S.2(v),S.6ofWarehouse(DevelopmentandRegulation)Act,2007andClause3oftheWarehousingDevelopmentandRegulatoryAuthority (WarehouseAccreditation)Regulation,2011} (IncaseofIndividualorProprietaryFirmtheidentitydetailsofindividualorproprietorneedtobegiven;forpartnershipfirmtheidentitydetailsof all partnersbegivenbyattachingseparatesheetsforeachoneofthemandincaseofCompany*the identitydetailsofChiefExecutiveOfficerbe given)

1. NameofWarehouseman Mr./Ms./Mrs.................................................... 2. Status ofwarehousemanProprietor/JointOwners/Partners/ChiefExecutiveoftheCompany* 3. Numberofjointowners/membersofpartnershipfirm(ifapplicable).................. 4. DateofBirthofWarehouseman................................................................... 5. FathersName/HusbandsName............................................ 6. ContactDetailsofWarehouseman a. ResidentialAddress......................................................... ........................................................... b. TelephoneNo. ()()
STDCode No.

Passport SizePhotoof Warehouse man

c. d. e. f. 7. 8. 9. 10. 11.

MobileNo........................................ EmailId................................... PANNo.forwarehouse/warehouseman(asapplicable)................................... UIDNo./VoterIDNo.ofwarehouseman(ifany)...................

TypeoftitleoverWarehouse Ownership/Lessee Certifiedcopyofsaledeed/leasedeed forsiteland ....................... Particularsofcopyofrecordofrightshowingtitleofwarehouseman....................... Whetherthereisanychargeonwarehouseassets,ifyesthendetailstherefor................ Networthofwarehouse,Rs..............ason....................... Enclosures 2.1AttestedcopyofAuditedAnnualAccountofthewarehouse(forregisteredCompany* theonefiledwiththeRegistrarbesubmitted) 2.2Attestedcopyofacquisitiondeed(purchase,lease)forwarehouse 2.3Attestedcopyofrecordofrightindicatingrightonlandandimmovablepropertyof warehouse 2.4Proofofadequatenetworthofwarehouse(CACertificate/Certificateofbankerof warehouse) 2.5 Statementofdetailsofanychargeonwarehouse(mortgage/attachment /pending litigationinrespectofassetsofthewarehouse etc) 2.6AttestedCopyoflatestIncomeTaxReturnofwarehouse 2.7AttestedCopyofanyotherreturnfiledwithstatutoryauthority(LicensingAuthority/ Servicetax/salestaxetc.) Date ....................SignatureofApplicant Place.......................

* Companyhereinafterreferredtoincludesanylegalpersonsuchascooperativesociety,registeredfirmetc.

Section3 GoodstobeStored,StorageConditionsandInsuranceCover
{Ref.Clause3oftheWarehousingDevelopmentandRegulatoryAuthority(WarehouseAccreditation)Regulation,2011}

1. ListofProduce/GoodstobeStored a. b. c. d. e. ...................................... ........................................... ......................................... ............................................ ..........................................

2. QualityGradingSystem 3. SystemofPriceAssessmentforProduceofferedforStorages 4. CriticalStorageConditionsofferedbyWarehouseKeeper a. Plput tickmarkagainsttheTypeofColdStorage applicableandindicatecriticalstorage conditionsofferedfor eachtypeofgoodstobestored(Pl. attachadditionalsheetifno.ofgoods


arelarge)

i. StorageforHorticultureProducenotrequiringPreCooling A. ifconformstoNHBCSType1 Y/N B. PullDown Pulldownrate.............., RH...........%, CO level....................... 2 C. Holding Temperature......................Humidity.........................CO level................. 2

ii. Storagefor HorticultureProducerequiringPreCooling


A. IfconformstoNHBCSType2 YorN A. A B.. Precooling: hydrocoolers/forcedairprecooling/vacuumprecooling batchsizeandrate B B ofprecooling C. Pulldown (1)Pulldownrate....................,(2)RH...........%,(3)CO level ........ C. 2 C D. Holding Temperature......................Humidity.........................CO level................. D. 2 D

iii. CAStorage
A. IfconformstoNHBCSType3 A. A B. Precooling: hydrocoolers/forcedairprecooling/vacuumprecoolingbatchsizeandrate B. B ofprecooling or, C. Pulldown (1)Pulldownrate....................,(2)RH...........%,(3)CO level ........ C. 2 C D. Holding Temperature..................,RH(%).......................,N2 level...............,O2 D. D level.............,CO level................. 2

b. FrozenStorage i. Chillingor IQFwithfrozenstorage(Chilling/IQFrateand holdingtemperaturerange) ii. Blastfreezing(Coolingrate andholdingtemperature range) 5. Enclosures


a. b. c. d. AttestedCopyofInsurancePolicyagainstFire/Floods/Theft/Burglary/Riotetc DetailsofInsuranceCovermadeavailableforGoodsStored AttestedCopyofSystemPerformanceData sheet generatedbydata loggerfor Past 1year AttestedCopyofSurveillanceReport,ifany(forrenewalof certificateof accreditation)

Date....................SignatureofApplicant Place....................

Section4 ManagerialCompetence
{ref.S.4ofwarehousing(DevelopmentandRegulation)Act,2007andclause3ofTheWarehousingDevelopmentandRegulatory Authority(WarehouseAccreditation)Regulation,2011}

1. ParticularsofManagerialManpowerandJobChart S. No. 1 2 3 4 5 6 Designation Assigned* Project Engineer Manager Supervisor Accountant Record Keeper Computer Operator Function/Job Chart* Minimum Training Educational Details Qualification DetailsofJob Experience Remarks

* Thesearebywayofexampleandoneormorefunctionmaybeclubbedkeepinginviewworkload

2.ParticularsofOperatingPersonneltheirJobChart S. No. 1 2 3 4 5 6 7 8 Designation Assigned* Operator Mechanic Electrician Plumber Grader Weigher Sampler Security Officer Function/Job Chart* Minimum Training Educational Details Qualification DetailsofJob Experience Remarks

*Thesearebywayofexampleandoneormorefunctionmaybeclubbedkeepinginviewworkload

3. Puttickmarkagainst followingManuals ifmaintainedatColdStorageWarehouse a. OperatingManualforWarehouseReceiptSystem b. OperationManualforPlant&MachineriesincludingAnnualMaintenance c. SafetyManualAgainstHazardsofFire/RefrigerantLeakage d. OperationManualforHazardsCoveredbyInsurancePolicies

Date.........................SignatureofApplicant Place..............................

Section 5 StorageWorthinessofWarehouse
{ref.S.4ofwarehousing(DevelopmentandRegulation)Act,2007andclause3ofTheWarehousingDevelopmentandRegulatory Authority(WarehouseAccreditation)Regulation,2011}

Note For cold storages set up in accordance with technical standards prescribed by DAC in this regard in which case implementationprotocolhasbeenfollowed underGovernmentschemesofNHM/HMNEHA/NHB/APEDA/MoFPIetc.,applicant maysubmitacopyofbasicdatasheetinprescribedformat,dulyapprovedbysuchschemeimplementingagencyatthetimeof issue ofletter ofintent/inprincipleapprovaltotheprojectproposalandalsoacopyof Joint InspectionReportpreparedbefore releaseofsubsidyundertheschemeasevidenceforstorageworthinessofcoldstorage.Applicationsforcoldstorages notcovered bythisprovisionmustsubmitbasicdatasheetinfollowingformat forlatestpositionpriortodateofapplication.

ModelBasicDataSheet
(Ref.Section2ofrelevant TechnicalStandardsofNHBasisapplicable)

A.Identification NameofColdStorage LocationofColdStorage NameofPromoterCompany/Owner Typeofcompany (Proprietorship/Partnership/Pvt.Ltd/Ltd) PostaladdressofPromoter

Area/Village District

Town State

Tel/Fax Presentactivityinbrief NameofCEO/MD NameofManager/ContactPerson B. BasicColdStoreDesignConsiderations i) CommodityStorageRequirements TypeofCommodities/Produce Ideal/RecommendedStorageConditions O Temperature(DBin C) HumidityRH(%)Range AirCirculation(CMH/MTofProduce) Ventilation(AirChanges/Day) CO2 Range(PPM) O ProduceCoolingRate( C/day) O FreezingPoint C Others O ColdChamberDrybulb(DBin C) ColdChamberRH(%) MaxStorageperiod(months) Maxproducttemp( C) atthetimeofloading Dailyloadingrate(MT/day) ineachcoldchamber LoadingPeriod (months) O Pulldownrate( C/day) UnloadingPeriod(months)
O

Mob.No

Email

Phone/MobileNo

Dailyunloadingrate(MT/day) fromeachcoldchamber O AnteRoomConditions(T C&RH%) O Sorting&GradingArea(T C&RH%) SpecialProvisions CIPCtreatmentforProcessPotatoes SpecialProvisions MA/EthyleneControl/ Fumigation/FreshAiretc ii) FreshAir/VentilationSystem BriefDescriptionofCO2 Extraction/Ventilation System CO2 ConcentrationControlRange(PPM) Monitoring&ControlInstrument Type Accuracy VentilationCapacity(MaxAirChanges/Day) DesignConsiderationsforEnergyRecoveryand PreventingWettingofProduce iii) ColdStoreChamberSizingandCapacity No.ofchambers: Type :Mezzanine/Palletized MaxHeightofBuilding Details TotalCapacityofEachColdStore Chamber(MT) InternalChamberDimensions Lx BxH (m) No.ofmezzaninefloors XHeight(m)perfloor Size&WeightofBagsorBoxesbeing stored TotalnumberofBags/Boxes/crates storedineachColdStoreChamber iv)AnteRoom&ProcessAreas Details AnteRoom Sorting&GradingArea Loading/Unloadingdock v)MachineRoom&UtilityAreas Details MachineRoom OfficeArea Length(m) Width(m) Height(m) Length(m) Width(m) Height(m) CSChamber1 CSChamber2 CSChamber3 CSChamber4

Toilets&Changingrooms Anyother vi)Building&ConstructionDetails Typeofconstruction: Civil/ PreengineeredBuilding

TypeofExternalwallsofcoldchambers TypeofInternal/Partitionwalls TypeofRoof/Ceiling TypeofInternalstructure/Racks Typeofmezzaninegrating TypesofLightingfixturesincold Chambers TypesofLightingfixturesinProcess& OtherAreas vii)InsulationandVaporBarrier TypeofInsulation: Insulating Sheets/ MetalSkinCompositepanels Wall External Ceiling/Roof Internal Floor

TypeofInsulation Typeofmaterial EPS /MetalSkinPUF CompositePanels /XPS/PUR,Others RelevantISCode 3 Density (kg/m ) ThermalConductivityat+10C kvalue(W/m.K) Thermaldiffusivitym2/h Watervapourtransmissionrate, ng/Pa.sm,Max. Waterabsorptionafter 24himmersion, percentagebymass. RelevantISCodeofPracticefor ThermalInsulationofColdStore TotalInsulationThickness(mm) No.oflayers& Thickness/layer(mm) Typeofvaporbarrier&thickness (microns) TypeofBituminous/StickingCompound TypeofCladding/Covering/External Finish Locking/Fixing&SealingSystemincase ofMetalSkinCompositePanels Anyotherinfo

viii)ColdStoreDoors&AirCurtains TypeofInsulation Details No.ofInsulateddoors Typehinged/sliding InsulationMaterial EPS/PUF/Others ThicknessofInsulation(mm) Typeofcladding Sizeofdooropening ProvisionofStripcurtains nos.& overlap% Aircurtains,ifany Others ix)MaterialHandling ProposedPractice: Manual /SemiAutomated/Automated Procedure MaterialHandlingProcedures &Equipments CapofElectricElevator Ratingofmotor(kW) Anyotherdevice x)Grading,SortingWashing&PackingLine(optional) ProposedPractice: Manual /SemiAutomated/Automated Procedure ProcessLine TotalConnectedLoad(kW)
PleaseattachaPlan &LayoutoftheproposedColdStoreunitinaccordancetothe Statutory Building ByLawsand BISBuildingCodes& StandardsdulyapprovedbyaRegisteredArchitectandStructuralEngineer.Thedrawingsshoulddetailoutinsulationtype,thickness,and fixingmethodologyinsectionaldetails.

BriefDescription

BriefDescription

C. HeatLoadCalculation ofCoolingSystem Summary AmbientConditions Summer DryBulbTemperature(C) WetBulbTemperature (C)

Monsoon

Winter

Refrigeration Load TransmissionLoad ProductLoad InternalLoad Lightingload Occupancyload InfiltrationLoad Ventilation/FreshAirLoad EquipmentLoad Fanmotorsetc. TotalLoad(kW/24hrs)

DuringLoading(kW)

DuringPullDown(kW) DuringHolding(kW)

CompressorOperation Hours/Day Multipliers TotalRefrigerationLoad TotalLoad(KW)

LoadingPeriod PullDownPeriod Holdingperiod SafetyFactor DefrostPeriod PeakPeriod

HoldingPeriod

LeanPeriod

PleaseattachdetailedheatloadcalculationsheetsoftheproposedcoldstoreunitinaccordancetotheprescribedTechnicalStandardsandGuidelines dulyapprovedbyaQualifiedEngineer.

D. CoolingSystem Design&EquipmentSelection i) CoolingSystemConfiguration TypeofRefrigerant TypeofSystem Typeofcompressor Typeofcapacitycontrol Typeofcondenser CoolingTowers (ifapplicable) Typeof coolingcoil Typeofdefrosting HumidificationSystem&Control (BriefDescription) ii) CompressorDetail Compressor Nos. Make&Model Comp. RPM OperatingParameters Refrigeration Evap.SST./Cond. Capacity O Temp( C) (KW) Motor Total Rating. Electric (KW) Power. (BkW) RemarksWorking /Standby Ammonia/Freon/Others DirectExp/GravityFeed/Overfeed Reciprocating / Screw /Scroll/Others AutomaticInsteps / Stepless Atmospheric/Evaporative/Shell&Tube/PlateHeat Exchanger/ Other FRPInducedDraft/Others Ceilingsuspended / FloorMounted/Others Air/Water / Electric / Hotgas

iii) CondenserDetails Condenser Make& Model Nos. OperatingParameters Condenser ElectricFan Cond.Temp.(SDT)/in/out Capacity /PumpMotor O watertemp( C)&flow (kW) Rating (lps) (kW) Total Electric Power (BkW) RemarksWorking /Standby

10

iv) CoolingTowerDetails(ifapplicable) Cooling Tower Make& Model Nos. OperatingParameters CoolingTower Fan&Pump DB&WBTemp,in/out Capacity(KW) Capacity O watertemp( C) (CMH/LPS)& Motor(kW) Total Electric Power (BkW) RemarksWorking /Standby

v) AirCoolingUnits(ACU) ACUMake Nos. &Model Operating Cooling ParametersEvap. Capacity (SST) (kW) O &TD*( C) AirFlow (CMH)& FaceVelocity (M/S) Materialof CoilTubes &Fins Finpitch TotalFan (mm) ElectricPower (BKW)

(*) TD TemperaturedifferencebetweenEvap.(SST) C&ReturnAir(atcoilinlet). Please attach Detailed Technical Data Sheets of each equipment namely Compressors, Condensers, Cooling Towers, Air Cooling Units giving General Layout, Dimensions, Material of Construction, Rated Capacity, Operating Parameters and COP (please note that the Air CoolingUnitdatasheetshouldincludeheattransferarea,finspacing,no.ofrows,airflow,facevelocity,fanstatic,airthrow,FanMotor BKW/KW,finspacing,etc)dulyCertifiedbytherespectiveequipmentmanufacturerswithreferencetotheRelevantCodes&Standards.

E. ElectricalInstillation TotalConnectedload(kW) Estimatedpowerrequirement at PeakLoadPeriod(BkW) Estimatedpowerrequirement atHolding LoadPeriod(BkW) Estimatedpowerrequirement atLean LoadPeriod(BkW) CapacityofTransformer(KVA) (proposed) SizeofCapacitorforpowerfactor correction &theiroperation Make&Capacityofstandby D.G. Set(KVA) F. SafetyProvisions DetailsofFireFightingequipment Handling Refrigerants&Leaks

Dry

Waterbased LeakDetection Handlingmeasures Safetydevices LP/HPcutouts,safetyvalves,shutoffvalves etc. DetailsofEmergencyalarmsystem &pushbuttonsystemincoldchambers

11

EmergencylightinginColdchambers&otherareas Lighteningarrestors Anyothersafetyprovisions G. Codes&StandardsFollowed Building Design&Structure ConstructionMaterials ThermalInsulation&Application RefrigerationEquipment&Systems Electrical&MechanicalSystems FoodSafety Others H. EnergySavingEquipment&Measures DetailsofEnergySavingdevices BriefDescriptionandSavings LightFixturesCFL/LED NaturalLightingforgeneralareas VFDforfans/compressors RefrigerantControlsandAutomation AirPurger PowerFactorController Energyrecoveryheatexchangerfor Ventilation System Renewable/SolarEnergye.g. PVlighting PLCControl,&DataAcquisition Anyotherfeaturese.g.waterrecycling,rain waterharvesting

I.

Operation&Maintenance Nos./Details

Description ProposedstaffforOperation&Maintenance ProposedAnnualMaintenanceContracts(ifany) Training&PreventiveMaintenanceprocedures Sanitation&Hygienepractice PollutionControl

12

J.

EstimatedPerformanceParametersofProposedColdStore PeakPeriod HoldingPeriod LeanPeriod

Parameters CoefficientOfPerformance(COP) OftheColdStoreUnit PowerConsumption(KWH/Day) TotalElectricityCost(Rs/Day) ElectricityCosttowardsStorage(Rs/MT /Day) K. OtherInformation

Enclosures i. Applicantmustsubmitforrecordasbuiltdrawings,includingcoldstorelayout,P&Iandelectrical drawingandanoperation&maintenancemanualalongwithalistofessentialsparepartssuppliedto himbytherefrigerationcontractingagency. ii. Heshouldalsosubmitacopyofthecertificateofsatisfactorycommissioningofthecoolingsystemin conformancetotheperformanceindicatorsasperprescribedstandardsasissuedbytherefrigeration contractingagencytohim.

Place . Date

Signatureand NameofWarehousemanwithseal

Place .. Date .

Signatureand NameofProjectEngineerwithseal

13

Annexure1

Checklisttobefilledupbytheexaminersoftheaccreditationagency
Nameandcompletepostaladdressofwarehouse:___________________________________ _____________________________________________________________________________ Sl. No. 1. Parameters AbouttheApplicantandApplicationinForm1 a. b. c. Iftheapplicationisaccompaniedbyprescribedapplicationfee? Whethertheapplicantisproprietorofcoldstoragewarehouse? In case of joint owners whether all the joint owners have singed the application/authorisedoneofthemforthispurposeinwriting? d. Incasethewarehousebelongstoacompany,then
i. Ifthecompanyhasmandate,asperitsconstitution,torunbusinessof warehouse? ii. If the application is supported by attested copy of duly passed resolution of the Board of Management of the applicant Company to apply for accreditation indicating the particulars of person who is authorisedtomakeapplicationonitsbehalf? iii. If the particularsof authorisedpersonmatches with the particulars of applicant? iv. If the application has been accompanied with attested copy of such resolutionasmentionedin(ii)above?

Comments/Findingsof Examiners

If the photograph of the applicant is duly affixed with self attestationbyproprietor/attestationbyCEOofapplicantcompany? f. Incaseofrenewal,whataretheparticularsoflastvalidcertificate ofaccreditation? g. Overall comments regarding locus / competence of Applicant to makethisapplication? AbouttheDescriptionofColdStorageWarehouse a. Whether a registered architect has certified the civil structure of cold storage to be as per provisions of BIS code and local building bylaws and as per building plan duly approved by competent authority b. Whether any engineering firm having expertise in refrigeration engineering has certified that the cold storage has been commissionedasperencloseddatasheetatPart6 c. Ifindustriallicense,ifapplicable,isduringitsvalidityperiod? d. Ifcoldstoragelicence,ifapplicable, isduringitsvalidityperiod? e. Ifpollutioncontrollicence,ifapplicable,isduringitsvalidityperiod? f. Iffiresafetycertificate,ifapplicable, isduringitsvalidityperiod? g. If approval / NoC from local planning Authority, if applicable, is duringvalidityperiod? h. Overall Assessment If the warehouse has all necessary statutory clearances/NoObjectionCertificates? IdentityofWarehousemanandcapacitytoDischargeLiability a. Ifcoldstorageisownedbywarehousemanoritison lease? b. Ifattestedcopyofdocumentsofacquisitiondeed(purchase/lease) hasbeenfurnished? c. If attested copy of record of right on land shows the title of warehousemanonlandandcoldstorage?

e.

14

d. Whether CA certificate or Bankers certificate shows adequate net worthofwarehouse? e. If a copy of latest income tax return of proprietor / company owningthecoldstoragehasbeenprovidedornot? f. Overall Assessment of Identity of Warehouseman and capacity to DischargeLiability Goodstobe Stored,StorageConditionsandInsuranceCover a. Whetherthecoldstoragewarehouseoffersprescribedcriticalstorage conditionsforgoodstobestored? b. Whether quality grading system adopted commensurate with AGMARK,CODEXoranyotherstandard? c. Whether the arrangement for quality grading adequate? Whether testingfacilitiesofgoodsto bestored inthewarehouse,inform ofa smalllaboratory,areavailable?Ifso,givedetailsofmajortestswhich canbecarriedout. d. List of laboratories for chemical analysis of the samples (wherever necessary)withwhomthewarehousehastiedup. e. Whetherthecriterionadoptedforpricingfairandrational? f. Whether norm for determining shelflife of produce to be stored fair andrational? g. Whether the warehouse has its own weighbridge? If so, the details withcapacityanddateoflastcalibration. h. No.ofbeambalances,platformbalanceswiththeirdetails. i. Whether the weights/platform balance used in the warehouse are timelycalibratedanddulystampedbyconcernedweights&measures Department. j. Whether the PLC readings for past period support claim that critical storageconditionsaregenerallyachievedincoldstorage? k. Whetherautomaticdataloggerforpowerpackoperationinplace? l. Whether electricity consumption is within acceptable limits of design consumptionlevels? m. Whether the fire alarm and refrigerant leakage alarm systems functional? n. In case of renewal of accreditation, whether the surveillance data supportiveofproper systemmanagement? o. Whether the warehouses as well as the goods stored in the warehouse(s) are insured? Whether insurance cover provided adequateandfair?Ifso,thenameoftheinsurancecompanyandrisks covered. p. List of banks operating within approachable distance from the warehouse.Anytieupofthewarehousewithanyofthesebanks. q. OverallassessmentregardingGoods to beStored,Storage Conditions andInsuranceCover ManagerialCompetence,ManPowerandSecurityArrangement a. Ifthecoldstoragehasafulltimemanagerwhoiswellconversantwith provisions of WDRA 2007 and Management of Cold Storage for perishablefooditems? b. If the cold storage has engaged a full time or part time project engineerwhoisregisteredwitharecognisedprofessionalorganisation ? c. If the cold storage has a full time supervisor who can monitor functioning of cold storage through PLC and who is conversant with stacking,packagingandcoldstoragemanagement?

15

d. Whether sufficient office equipment, viz. telephone, computers, photocopiers, fax and furniture (table, chairs, almirah, etc.) are availableintheoffice(s)ofthecoldstoragewarehouse? e. Ifthecoldstoragehasadequatenumberoffunctionalstaffforcarrying out functions like quality grading, weighing, sampling, account keeping,recordmanagementandsecurityarrangement? f. IftheOperatingManualFollowedbytheColdStorageselfexplanatory andelaborate anddisplayedatrelevantplaces ? g. If the manual for dealing with fire hazard, leakage of refrigerant self explanatory anddisplayedatrelevantplaces? h. Ifthe coldstoragehassecuritymenscabinandproperlightinginthe campus? i. If the cold storage fully protected by compound wall / barbed wall fencing? j. Ifgatepasssystemincoldstoragefollowedproperly? k. Overall assessment of Managerial Competence, Man Power and SecurityArrangement? StorageWorthinessofColdStorageWarehouse a. IncasethecoldstoragehasbeensetupunderGovernmentschemeof NHB/NCCD/SHM/APEDA/MoFPIetc.andaspertechnicalstandards prescribedbyDACthen, i. Whether the copies of basic data sheet enclosed is the one approvedbyconcernedagency ii. Whether Joint Inspection Report issued by the Joint Inspection Team deputed by concerned scheme implementing has certified that the project has been found to be commissioned as per prescribedtechnicalstandards? b. In cased the cold storage has not been set up under any government scheme of NHB ./ NHM/ APEDA/ MoFPI or has not been sett up following implementation protocols prescribed under approved TechnicalStandardsthen, i. whether the basic data sheet being submitted by applicant is accompaniedbyacertificatefroma chartered graduatemechanical /refrigerationengineeringfirmthattheheatloadcalculationhas beendoneasper procedurelaidoutbyASHRAEFundamentalsand Refrigeration Handbook with safety factor of 5% to 10% on estimated load and that the design is energy efficient, takes in to account safety of work men and goods stored and environmental concern. ii. Whether the refrigeration contracting agency has issued a certificate of satisfactory commissioning of the cooling system in conformance to the performance indicators as per prescribed standards. iii. The refrigeration contracting agency has provide as built drawings, including cold store layout, P&I and electrical drawing and an operation & maintenance manual along with a list of essentialspareparts. c. Ifenergyefficiency devices,automated controlsand fire&refrigerant leakagealarmshavebeenputinplaceandarefunctional? d. If operation of cold storage can be effectively controlled and monitoredbyPLC? e. Ifenergyconsumptionleveliswithin1020%ofdesignlevel? f. Whether stacking, packaging and handling system is as per design and prescribedguidelines

16

g. Whether firefighting arrangements are there in the warehouse? If so,

detailsofarrangementsincludingnumberandtypeoffireextinguishers, sandbuckets,etc.tobegiven. h. Name of the nearest Fire Brigade Station and distance. Whether telephone numbers of nearest Fire Station are displayed at different prominentplacesinthewarehouseornot? i. NameandAddressofAnnualMaintenanceContractAgency j. IfcopiesoffollowingoperatingManualsmaintainedinwarehouseand usedforassigningjobchartsandtrainingpurposes
i. AcopyofOperatingManualforWarehouseReceiptSystem ii. AcopyofOperationManualforPlant&MachineriesincludingAnnual Maintenance iii. AcopyofSafetyManualAgainstHazardsofFire/RefrigerantLeakage iv. AcopyofOperationManualforHazardsCoveredbyInsurancePolicyfor InsuranceClaims k. OverallAssessmentofStorageWorthiness

FinalRecommendation Caserecommendedforaccreditation Case not recommendedforaccreditation

Date Place SignatureofAuthorisedPerson Name,DesignationandSeal ofAccreditationAgency

17

Annexure2

Guidelines for Grading, Packaging,MarkingandLabeling, Stacking andStorage

1.

GradingofHorticultureProduce a. Grading of horticulture produce received in registered cold storage warehouse should for the purpose of uniformity, be done in accordance with the provisions of the General Grading and MarkingRules,1988madeundersection3oftheAgriculturalProduce(GradingandMarking)Act, 1937 (1 of 1937). However, Fruits and Vegetables may be graded and marked as per buyers requirements too, provided the minimum requirements specified in the relevant schedule of GeneralGradingandMarkingRules,1988 aremet. b. For the above stated purpose, the registered cold storage warehouse should preferably avail services of an "Authorized packer" i.e. a person or a body of persons who has been granted a certificateofauthorizationtogradeandmarkFruitsandVegetablesinaccordancewiththegrade standardsandprocedureprescribedundertheserules; c. Where ever, Grade designation and Quality of horticulture produce has been set out under General Grading and Marking Rules, 1988 the same should, for the purpose of uniformity, be followed.InothercasesCODEXstandardsandgeneraltradestandardsforgrading&Markingmay be adopted as per trading needs. The produce should be marked with Grade Designation accordingly.

3. Method of packing: Horticulture produce may be packed in bags, plastic bins, plastic crates, CFB boxesetc.asperbusinessrequirement. Prescriptionsregardingpacking madeunder GeneralGrading and Marking Rules, 1988 made under section 3 of the Agricultural Produce (Grading and Marking) Act,1937(1of1937) shouldbefollowed,whichisreproducedbelow; a. HorticultureProduceshallbepackedinsuchawayastoprotecttheproduceproperly. b. The materials used inside the package must be new, clean and of such a quality as to avoid causinganyexternalorinternaldamagetotheproduce. c. The use of materials particularly of paper or stamps bearing trade specifications is permitted providedtheprintingor labeling hasbeendonewithnontoxic inkorglue. d. Fruits and Vegetables shall be packed in each container in compliance with the recommended InternationalcodeofpracticeforPackagingandTransportofTropicalFreshFruitandVegetables (CAC/RCP 441995) of practice for export and as per the Instructions issued by the Agricultural Marketingadviserfromtimetotimefordomesticmarketunlessadifferentgradingstandardsas perbuyerschoiceisbeingfollowed. e. Thecontainersshallmeetthequality,hygiene, ventilationandresistancecharacteristicstoensure suitablehandling,shippingandpreservingoftheFruitsandVegetables.Packagesmustbefreeof harmfulforeignmatterandobnoxioussmell. f. ContentsofeachpackageorlotmustbeuniformandcontainonlyFruitsandVegetablesofsame origin,varietyandgradedesignation. g. Thevisible partofthe contentsofthe package(ifpresent) must berepresentativeofthe entire content. h. Contents of package may have different fruits and vegetables of different grades as per buyers requirementswithproperlabeling. 4. MethodofMarkingandLabeling:Thefollowingparticularsshallbeclearlyandindeliblymarkedon eachpackage,namely: a. b. c. d. e. Nameofthecommodity; Variety; Gradedesignation; Sizecode(ifprescribed); Lot/batch/codenumber;

18

f. g. h. i.

Netweight /No.ofunits; Nameandaddressofthe owner Dateofpacking; Suchotherparticularsasmaybe requiredbywarehouseman

5. SamplingItisadvisabletotakerepresentativesamplesonrandombasis.Foreachlot,minimumof twosamplesmaybetakenforcarryingouttestsforphysicalcharacteristicslikefirmness,colour,size etc. and also for chemical tests for residue of chemicals; one may be treated as laboratory sample andtheotherasreferencesample. 6. StackingHorticulture produce needtobestackedinamannerfor whichthe refrigerationandair circulation system has been designed so that air circulation at designed rate is not obstructed. For this design volume to weight ration and prescribed space between two stacks, between side walls and stack and door and stack must be followed depending on packaging, stacking system and commoditystored.Nocontainer/bag/crates/CFBboxshouldbestoredinamannerthatobstructs airflowfromAirCoolingUnitsandforthatmatterthereshouldbeadequategapbetweenceilingand topofstack.Thestoredgoodsshouldbeadequatelyprotectedfromiceformationonitduetobeing incloseproximityofcoolaircomingoutofAirCoolingUnits.Stacklineneedtobemarkedwithwhite paint and noload line on walls by red paint with line thickness of 5 COM. Each stack needs to be properly flagged by stack label. The packs should be handles in a manner so as not to cause mechanicaldamagetohorticultureproduce.RacksystemorPalletisationneedtobeadoptedwhere ever stack height is more. Fork lift is recommended in cases of NHBCS Type2 and 3 for stacking beyondheightof1.5 m. 7. Storage It is necessary to maintain prescribed critical storage conditions in the cold storage at all points of time. Critical Storage Conditions may be prescribed by Technical Standards for Cold Storages.Inabsenceofanysuch prescriptionsstorageconditions prescribed byreputedinstitutions like World Food Logistic Organization (WFLO), ICAR Institutions, CFTRI Mysore, NCDC etc may be used.AutomatedPLCcontrolforstorageconditionsisadvisablesothatstoragedataloggingcanbe accomplished automatically. Power back up should get switched on automatically in case of power failure and the operating hours of power back up should also get logged automatically. Automatic alarmsystemagainstfireandleakageofrefrigerantshouldbekeptinorder.Unlesslocallawsrequire wetsystemoffirecontrol,drysystemforfirecontrolmaybepreferred.

8. Typical ColdStoreLayout&StackingArrangementthefollowingcanbeusefulindesigning coldstoragechambersforpotatocoldstoragewithmezzaninefloors. PlanningstackpositionInthiscountry,potatoisgenerallystoredin50 Kgbags.Atypical50KgBag, whenfilledwithpotatoesandstitchedmeasures820mm(l)x485mm(w)x290mm(h). In order to size a cold store chamber for optimal utilization of space, it is suggested that first an appropriate stacking arrangement of bags is planned out on the drawing board. The arrangement shown in figure 1, has a footprint of 1640mm x 970 mm and can position 32 bags, up to 8 stack height.The totalstackheightinthiscase is2320mm andweighs1600Kg.Now consideringthisasa goodstackingoption,we cancontinuetosizethechamberforoptimalutilizationofspace.

19

Figure1
Thistypicalstackfootprintcanbe usedtosizethechamberdimensionsasshowninfigure2andfigure3and figure4. Atleast400mmclearspaceshouldbeleftfromtheinternalsurfaceofthewallsforaircirculation. The stacks shouldbe placedin rowsas showntoan extent thatthe chamberdimensions(lengthx width)is closetoasquare. The columnssupportingthemezzanine should beplacedin the rowspacesothey dont obstructsystematic stacking.Henceitisadvisableto havethestructureengineerdesignthecolumnsandbeamsonceastacking arrangementisagreedto. The door positionandstairsshould be placed to beclearfrom obstructionand ata convenient location for easeandsafetyoftheloaders/workers.

20

Figure2

21

Figure3

The air cooling units should be placed as shown so that the air throw is parallel to the spaces provided.Thistypeofbagstackingarrangementisverysimilartopalletisation / binstackingandwill allowbetterair distributionanduniformtemperatureandhumidityinthecoldstorecomparedto an unplanned and haphazard arrangement generally practiced. The cooling coils should be positioned on the side of the stairways for easy maintenance and to avoid providing walking passagesacrossthechamber. ThisarrangementisforlongtermbulkstorageandincaseofFiFOsuitablechangescanbemade, butitwouldreducestoragecapacity. 22

Figure4 Similarly,consideringstackheight,aclearfloortoceilingheightshouldbeprovidedforloadingand aircirculation.Figure5 Finallythestackpositionsoneachfloorcanbecountedandsummarizedintototalstoragecapacity oftheChamber.Howeverpleasekeepinmindthatinpracticethebagsslightlyoverlapwhenbeing stackedinrowsandalsosomebags canfitinotherspaceslikebelowthelandingofthestairs,etc. thereforetheoverallcapacityofthechambermayincreasebyabout5%.

23

The dimensions shown are clear space requirements, in a single line drawing, for the architect/structural engineers torelyonforoveralldesign ofthecoldstore building.Figure5 and figure6.

Figure5

24

Figure6
9. OperationManualProvisionsofWarehouseManualfordrywarehouses,asfarasapplicableincases of cold storage warehouse, shall hold good. Cold Storage Warehouse should maintain following operating manuals for the purpose of job assignment among workmen and also for training purposes. This may also be useful for dispute redressal between holder of warehouse receipt and warehouse man too. The part of manuals useful for daytoday working by workmen may be displayedattheirrespectiveworkstations a. OperatingManualforWarehouseReceiptSystem b. OperationManualforPlant&MachineriesincludingAnnualMaintenance, c. SafetyManualAgainstHazardsofFire/RefrigerantLeakage d. OperationManualforHazardsCoveredbyInsurancePolicyforInsuranceClaims.

25

Annexure 3

Listofcommodities notifiedfor issuanceofNWRsbythecoldstoragewarehouses

1. TablePotatoes(withorwithoutCIPCapplication) 2. SeedPotatoes 3. Processing{Potatoes(WithCIPCapplication) 4. Apples 5. Carrots 6. NagpurMandarin 7. Khasi/Darjeeling/NEOranges 8. Kinnow 9. SweetLime /mosambi 10. Lemon 11. Pomegranate 12. Grapes 13. Almond 14. Raisins 15. Onion 16. DehydratedGarlic 17. Garlic 18. Ginger 19. Driedediblemushrooms 20. RedChilies 21. Coriander(Dry) 22. Cinnamon 23. turmeric 24. Tamarind 25. DatePalm 26. FrozenProcessedFoodItemofhorticultureOriginincludingthosefrozeninIQForBlast Freezing.