Piling Checklist
Piling Checklist
Delivery Order No: __________ Item 1.0 1.1 1.2 1.3 1.4 1.5 1.6 Description Inspection of Piles during Delivery Pile Sizes & Length delivered are correct Pile Maturity minimum 14 days from casting Straightness of Pile ( 6mm per 3m length ) Crack width of Pile ( 0.4mm ) Thickness of end plate ( 6mm ) Squareness of pile head ( 5mm from plane perpendicular to longitudinal axis of pile) ) Yes No Date : ___________ Remarks
1/3
2/3
Calibration of dial gauges submitted Calibration of jack gauge submitted Method statement on load test for:a) b) zero to Working Load zero to 2x Working Load
Setting up a theodolite level as counter check Readings every 1/4 x Design Load Residual settlement reading when load reduced to zero
3/3