Previous Papers - Solution
Previous Papers - Solution
Item
P565
X43
Y36
N78
J27
Requirement
Net
Lead Time
On Hand qty Requirement (Weeks)
180
180
660
60
600
360
200
160
180
180
640
640
MRP for Completing 180 units of P565 (Planning as per net req
Week
1
P565
X43
Y36
N78
J27
Required Date
Order Placement
Required Date
Order Placement
Required Date
Order Placement
Required Date
Order Placement
Required Date
Order Placement
180
120
480
480
120
160
160
180
180
640
640
6
180
10
D=
P=
S=
H=
EOQ =
EOQ =
Q2.1
Q2.2
3400
3
100
17%
0.51
Total Cost =
Total Cost
Total Cost
10788.89727
10680.83261
10680.83
10788.9
UTL
LTL
Q5.1
Xbar
Cpk
45
30
38 SD
0.777778
Q5.1
Xbar
Cpk
37 SD
0.933333
2.5
Q5.1
Xbar
Cpk
37.5 SD
1.388889 Most capable
1.8
Sample No
No. of errors
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Control limit
Z=
Pbar
SD
UCLp
LCLp
5
3
5
7
4
6
8
4
5
9
3
4
5
6
6
7
Fraction defectives
0.05
0.03
0.05
0.07
0.04
0.06
0.08
0.04
0.05
0.09
0.03
0.04
0.05
0.06
0.06
0.07
UCLp
LCLp
0.122402
0.122402
0.122402
0.122402
0.122402
0.122402
0.122402
0.122402
0.122402
0.122402
0.122402
0.122402
0.122402
0.122402
0.122402
0.122402
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
99.73%
3
0.054375
0.022675617
Pbar + z*SD
Pbar - z*SD
0.12240185
-0.01365185 should be zero because percentage defectives can't be negative
0
Fraction defectives
UCLp
0.06
LCLp
0.04
0.02
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Quantity
In ltr
From
Unit Price
Rs/ltr
to
1
399
400
799
800 onwards
2
1.7
1.62
EOQ
300
ROP
43.13419 litre
TC
TC1
TC2
10029.4
Data used for What
8679.403
if analysis only
8319.403
D`
L
SD
S=
H
Consumption per day
Risk level
CSL
Z
Safety level
4500
3
2
30
3
12.5
1.50%
98.500%
2.17009
5.634192
ltr
days
ltr/day
Rs per order
Rs per year
ltr
10029.4
300 10029.4
350 10040.12
399 10066.25
400 ltr
400
450
500
550
600
650
700
750
799
8679.403
8716.903
8754.403
8799.403
8849.857
8904.403
8962.095
9022.26
9084.403
9146.864
800
850
900
950
8319.403
8788.153
8853.226
8919.403
8986.508
Day
No. of retests
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
2
0
2
1
2
0
2
7
3
2
1
Fraction defectives
0.005
0.01
0.01
0
0.01
0.005
0.01
0
0.01
0.035
0.015
0.01
0.005
UCLp
LCLp
0.023416
0.023416
0.023416
0.023416
0.023416
0.023416
0.023416
0.023416
0.023416
0.023416
0.023416
0.023416
0.023416
0
0
0
0
0
0
0
0
0
0
0
0
0
P-chart to be drawn as
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
Pbar
SD
UCLp
LCLp
0.009615385
0.006900337
0.023416058
-0.004185289
Fraction defectives
UCLp
LCLp
9 10 11 12 13
D
p
20000
200
250
80
300
10
d
S
H
sqrt(((2*D*S)/H)/((p-d)/p))
Q2.
Length of Production run =
EPQ/p
1414.214
Q3.
Rate of inventory build up during production (Average Inventory) =
1/2*(p-d)*t
424.2641
Q4.
Inventory after each production run =
EPQ - d*t 848.5281
Days the inventory will last =
10.6066
Hence we can't produce another product with production cycle = 10 days
Because, the setup time is 1 day, hence if we schedule this product then the interval between two production run will becom
But our inventory will not last till that time and there will be stockout