Professional Documents
Culture Documents
Parallel Workshop Between DUSP-Mit and Duyot-Etsam Collaboration Project
Parallel Workshop Between DUSP-Mit and Duyot-Etsam Collaboration Project
SPATIAL UNIT
HORIZONTALLY VERTICALLY
ARRANGEMENT SHAPE OF THE BLOCK
SPATIAL UNIT
ACCESSIBILITY
SYNERGIES MATRIX
LIGHTING
UNIQUE LANDSCAPE
Source: Methodology of the Special Plan Moratalaz (Madrid) Higueras, E; Pozueta, J; Lamiquiz F; 2007.
SYNERGIES MATRIX
MOVE FORWARD ONE MAIN PEDESTRIAN AND BICYCLE NETWORK
Source: Methodology of the Special Plan Moratalaz (Madrid) Higueras, E; Pozueta, J; Lamiquiz F; 2007.
OUTSIDE UNITS
INSIDE UNIT
PARKS
M 40
M 40
Av de Andaluca
Distance Information: 8.2 km Car : 13-15 minutes Metro: 20 minutes Bus: 30 minutes
M 40
M 40
Av de Andaluca
Poligono Talbot
PEDESTRIAN FLUENCY
ESTANCIAL USE
BICYCLE LANE
MOBILITY GENERATORS
MOBILITY GENERATORS
ROAD HIERARCHY
Public Service
Ciudad de los ngeles
40
Situation
CITY CENTER
Public Service
External conections
41
BUS External conections JOURNEY FRECUENCY Plaza de Legazpi - Villaverde Alto 9-12 min Atocha - Col. S. Cristbal ngeles 9-14 min Plaza de Legazpi - Villaverde Alto 17-22 min Atocha - Barrio Los Rosales 7-11 min Villaverde Alto - Viclvaro 12-15 min Plaza de Cibeles -S. Cristbal ngeles TIME 35 min 1h STOP N. 10 12 12 9 4
EMT LINE L3
UNDERGROUND JOURNEY Moncloa - Villaverde Alto FRECUENCY 2-4 min TIEMPO 35 min STOP N. Ciudad de los ngeles
Public Service
No service
Public Service
No Service
Public Service
Diagnosis
44
Public Service
Survey
45
User profile
Foreign
11%
Women
53%
47%
Sex
89%
Nationality
Men
Spanish
<24 >65
14% 28%
Home maker
11%
Ocuped
25%
Student
17%
Age
58% 19% 28%
Ocupation
Retired 25-64
No ocuped
DIAGNOSIS: MANAGEMENT
ASSOCIATION OF NEIGHBOURS
6300 members 400 comunities
TOO EXPENSIVE
EMV
REFERENDUM
ARI DESIGNATION
DIAGNOSIS: MANAGEMENT
AID ACCORDING TO THE TYPE OF ACTION Owners, Usufructuaries or tenants of resident houses in them Performance in common elements of the building 75% of the budget protected with a maximum amount of 21,000 per housing. Adequacy of habitability of housing performance: 50% of the budget protected with a maximum of 18,000 per housing. 60% and 21,000 , respectively, if the action relates to the elimination of slums. 50% with a maximum of 18,000 per housing. 60% with a maximum amount of 21,000 per housing.
Non-resident owners of leased dwellings Non-resident home owners incorporated into the Municipal Service of rent Owners, Usufructuaries or tenants of commercial premises with activity
50% with a maximum of 18,000 per housing. 75% with a maximum amount of 21,000 per housing. 40% with a maximum of 15.000 by local.
DIAGNOSIS: MANAGEMENT
COMUNITY
EMV
ASOCIATION
ARCHITECT
BUDGET
ARCHITECTURAL
MANAGEMENT
DIAGNOSIS: MANAGEMENT
DWELLIGNS OWNERS+ EMV SUBSIDY URBANIZATION EMV SPECIAL BUDGET SOCIAL AND ECONOMICS NEIGHBOUR ASSOCIATION
DIAGNOSIS: MANAGEMENT
TOTAL
OBJECTIVES OF THE INTERVENTION - Ensure the structural and functional adaptation of the buildings. - Improve the habitability of housing conditions - Promote targeted actions to the saving and energy efficiency - Improve the accessibility of the buildings through the introduction of lifts and the elimination of architectural barriers. - Respect the environment and the urban landscape - Renew the general infrastructure and the public spaces. - Improve accessibility in streets, squares and landscaped sitting areas - Recover and improve the character of the neighborhood in response to social needs.
The population: 19,500 people. Women represent the 52.08% , men the 47,92%. Almost 30% of the population is over 60 years old. Only 12% is under 14 years old. The level of studies: 45% of the population over 16 years has a second degree.12% has completed university studies. Professional situation: 51% of the population over 16 years old are in situation of inactivity, 43% occupationally occupied and 6% unemployed. The occupation of workers is stable and qualified. The rent is 20% lower than the average for the city of Madrid, but 12 % higher than that of the inhabitants of the District of Villaverde. Foreign population: represents just the 12 %, 25% of them are Colombians, 24% Ecuatorians and 6% Moroccan. 90% of buildings in the area are residential. Almost 8000 houses a distributed in 435 buildings. 95% are occupied and only 5% are rented. 75% of the homes are owned and completely paid. Houses: Most of the houses were built 40 - 50 years ago. The average surface of the housing is of 70 m2. Most of the homes are well cared while the buildings had abundant crevices, problems with sanitation and impermeability of the decks. Public areas have serious structural problems. Problems perceived by the population: poor communication, which was resolved largely when opened subway, excess noise in the case of the immediate neighbours to major roads, and the lack of lifts.
The statistical data: obtained from the study conducted after the declaration of the area as rehabilitation zone, 2005.