Professional Documents
Culture Documents
Geebee R3-30CC
Geebee R3-30CC
,Ltd
KIT CONTENTS
P01
P02
P03
Drill a 6mm diameter hole on the bottom of rudder, fix the steel wire to the bottom of rudder with AB glue
P04
Put some AB glue on the hinges which link with rudder, then stick to the fuselage
P05
P06
Assemble control horn, rudder cable, ball link and connecting rod to rudder
P07
Fix rudder servo, rudder cable, ball link and connecting rod as picture
P08
P09
P10
Put some AB glue on the hinges which link with elevator, then stick to the horizontal tail
P11
P12
P13
Assembly horizontal tail to fuselage, then measure the same angle for both sides
P14
P15
Check the horizontal tail and fuselage at correct angle, then fix them with screws
P16
P17
Put some AB glue to hinges which link with aileron , then stick to the wing
P18
P19
P20
P21
Put some AB glue into landing gear trail on the wing, then fix the landing steel wire firmly
P22
P23
P24
Put the wheel active cover on the wheel pant, then drill hole to fix it on the wheel pant
P25
P26
P27
P28
Fix the two wings to fuselage with two screws one each side
P29
P30
P31
P32
P34
How to drill a hole on the cowling: tape one piece paper on the fuselage and mark the hole position, then put the cowling on fuselage and align it with the hole, then drill the hole on cowling P35
P36
P37
P38
CG as above picture