Professional Documents
Culture Documents
Discharge Ampl
Discharge Ampl
no 60
AMPL
I. 1 2 3 4 5 6 7 8 9
Estimation of design discharge in respect of Bridge No: 60 @ Ch :33127.676 m Proposed bridge 3 x 30.5. PSC Slab Physiographic Parameters:
Catchment area Length of longest stream from source to bridge site (L) Bed Level Level at the farthest point: Height of farthest point along the point of interest along river Length of the Stream from bridge site to nearer to the C.G Soil Sub zone Proposed formation level A L BL FL H Lc = = = = = = = = = 45.75 Sq Km 11.000 Km 510.280 m 535.28 m 25.000 m 3.250 Km SANDY CLAY 3(d) m
S.No
R.L (m) 510.280 512.6 514.9 517.2 519.5 521.8 524.1 526.4 528.7 531.0 533.3 535.3
Distance (Km) 0.000 1.000 2.000 3.000 4.000 5.000 6.000 7.000 8.000 9.000 10.000 11.000
Segment Length Li 0.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 11.000
Di-1+Di Li(Di-1+Di)
1 2 3 4 5 6 7 8 9 10 11 Total \
0.000 2.300 6.900 11.500 16.100 20.700 25.300 29.900 34.500 39.100 43.700 48.000
0.00 2.30 6.90 11.50 16.10 20.70 25.30 29.90 34.50 39.10 43.70 48.00 278.0 S = 2.298 m/Km
Equivalent Slope
tp
= = = =
4.01 4.50
hrs hrs
qp
= = = = = = = = = = =
tr
Page 1
Br.no 60
(ix) Time to start of rise to the peak of Unit Hydrograph (x) Peak Discharge of Unit Hydrograph Tm Qp = = 5.0 hrs
3 19.372 m /s
Page 2
Br.no 60
Estimated Unit Hydrograph Parameters were plotted on graph paper . The Plotted papers were joined to draw synthetic unit hydrograph
Synthetic Unit Hydrograph
1Hour SUG Ordinates Hr.
16
Ordinate
14
20.0 18.0 16.0 14.0 12.0 10.0 8.0 6.0 4.0 2.0 0.0
0
12
10
02
10
10
12
15
14
16
20
18
20
25
22
Time in Hours
The summation of Discharge Ordinates of the unit Hydrograph of 1hr interval Thoeritically equal to Q= (A x d)/0.36*tr) Where A d = = Catchment Area 1.0 cm Depth Q =
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
0.0 2.0 4.0 10.0 15.0 19.00 16.00 12.0 9.00 8.0 6.0 5.0 4.0 3.0 3.0 2.4 2.0 2.0 1.7 1.5 1 0.75 0
Discharge in Cumecs
127.31 3 127.08 m /s
(Refer Flood Estimation Report for 3d sub zone) TD = 1.1xtp TD = 5.00 hrs
b) Estimation of Point Rainfall and Areal Rainfall for Storm Duration R50 24 hour point rainfall (Refer Plate 9) = 24 cm Conversion factor (Refer Fig.10) = 0.69 R50 5 hour point rainfall = 16.56 cm Areal Reduction Factor for 45.75 Sq.Km catchment area (Refer Ann-4.2) = 0.975 R50 hour areal rainfall = 16.143 cm This 50 year design storm hour areal rainfall has been split in to 1-hour rainfall increments using time distribution coefficients given in Annexure-4.1 or fig-11 of F.E.R-3(d) Storm Rainfall cm 10.332 13.399 14.690 15.659 16.143 Rainfall Increment cm 10.332 3.067 1.291 0.969 0.484 Loss Rate/Hr cm/hr 0.225 0.225 0.225 0.225 0.225 Effective Hourly Rainfall cm 10.107 2.842 1.066 0.744 0.259
Duration
coefficient
hr 1 2 3 4 5
Page 3
Br.no 60
10 11 12 Total Base Flow for the catchment area Peak Discharge 7 5 4 0.743599 0.259299 0 5.20519 1.296496 0 253.92 m3/s (Refer para 3.6) = = 4.58 m3/s
3 258.49 m /s
Page 4
Br.no 60
VI. Water way calculation
(i) Design discharge as per Synthetic Unit Hydrograph method (ii) Assumed velocity (iii) Required area of water way (iv) Poposed Linear water way (v) Required Depth of water way = area of water way / Proposed Linear water way (vi) Designed HFL (vii) Required Vertical Clearance Provided Vertical Clearance (viii) Thickness of the slab (ix) Free board Required (Minimum) Free board Provided (FL-Designed HFL) (x) Bed level to formation level Hence proposed bridge is 3 x 30.5 x PSC Slab VII. Scour depth calculation (i) Design discharge Q is Add 30% for foundation discharge Q V A0 = = = =
3 258.49 m /s 2.44 m/sec
83.38
sqm
91.500 m
= = = = = = = =
0.91
= =
3 258.49 m /s 3 336.04 m /s
1. 811 xCx
According to Lacey's formula Linear Water way= Where C= Coefficient taken as 2.67 (ii) Normal scour depth D=0.473(Q/f)0.345
Q
= 77.74 m
= = = = =
where for value of ' f ' refer 4.6.5 as per Bridge Substructure Code (iii) Maximum scour depth for abutment = 1.5*D (iv) Height from bottom of foundation to HFL is (v) Depth of Curtain wall / Drop wall below bed level References: 1 Bridge substructures & Foundation code 2 Flood Estimation Methods (RBF: 16) (If Catchment area <25 Sq.Km) 3 Flood Estimation Report for Mahanadi Sub zone -3(d) of February-1997
m m m
Page 5