JIT in Supply Chain Management: Submitted By: Kuntay Karthik (011) T.Sumith Singh
JIT in Supply Chain Management: Submitted By: Kuntay Karthik (011) T.Sumith Singh
AIM of JIT: To create a Supply Chain which provides fast, reliable and flexible response to customer requirement at least cost and minimal dependence on inventory.
Provide fast, reliable and flexible response to customer requirement at least cost and minimal dependence on inventory not just within the confines of a single organization, but ultimately throughout the entire supply chain by creating a highly responsive organization which is devoid of any waste.
ORIGIN OF JIT:
Commenced at Toyota car plant in Japan and is thus known as Toyota Production System ( TPS)
world
Putting pressure on the suppliers / management of suppliers only Getting deliveries at the last moment Suppliers holding the stock for us JIT is applicable only in foreign countries like Japan Not practical in remote units
JIT
VS
problem Unreliable machines Bottleneck areas Large lot sizes Long mfg.. lead times Poor Quality
JIT Solution Improved reliability Increase capacity Reduce set up times Pull system Improve process
Expose and Eliminate Fundamental Problems Reduce Manufacturing Throughput Time Improve Supplier Performance Improve Quality Improve Flexibility Create High Responsive Organization Eliminate Waste (Non Value Adding)
Preferably single source for each item Long term contacts Very short lead times Frequent deliveries of small lots 100% good quality Close interaction with supplier Proper delivery schedules and plans to supplier Local source as far as possible Training assistance in SQC, JIT & Technical Assistance Treat the supplier as CO-MAKER
TRADITIONAL MFG
Order quantity is
determined by the
JIT MFG
Supply exactly meets
demand. Delivery is
Economic Order
Quantity
when required
JIT MFG
Small, IT For daily production Deliveries are synchronized with production Relationship is based on Co Maker principle. Single supplier. LT Agreements
Close to plant Quality product Good industrial relations Reduce total number of suppliers
Set up Time
Process Cycle Time
Batch Size
Planning System Material Handling In Short All Existing Practices !