Price List: Residential Flat in "SRS Residency" at Sector-88, Greater Faridabad, (Haryana)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

***** Price List

W.E.F 01-03-2012

Residential Flat in SRS Residency at Sector- 88, Greater Faridabad, (Haryana)


Type 2 Bedroom, Drawing /Dining, Kitchen, 2 Toilets, 4 Balcony 3 Bedroom, Drawing /Dining, Kitchen, 3 Toilets, 4 Balcony 3 Bedroom + Servant Room, Drawing /Dining, Kitchen, 4 Toilets, 4 Balcony 3 Bedroom + Servant Room, Drawing /Dining, Kitchen, 4 Toilets, 4 Balcony DC 1 2 3 4 5 6 7 8
Power Backup Installation

Super Area 1304 Sq.Ft.

Floor
G F to 4th Floor 5th to 9th Floor 10th to Last Floor G F to 4th Floor

Amount (`)
3399000/3249000/3099000/4799000/4599000/4499000/5399000/5249000/5099000/5449000/5249000/-

Booking Amount (`)


(300000 + 7725)

= ` 307725/-

1557 Sq.Ft.

5th to 9th Floor 10th to Last Floor G F to 4th Floor

(350000 + 9013)

= ` 359013/-

1837 Sq.Ft.

th

to 9 Floor

th

(350000 + 9013)

= ` 359013/-

10th to Last Floor

1st to 4th Floor

1850 Sq.Ft.

(350000 + 9013)

5th to 8th Floor

= ` 359013/-

` 386/- Per Sq ft 1 KVA FREE No Extra Charge No Extra Charge No Extra Charge No Extra Charge No Extra Charge ` 50/- Per Sq ft ` 75000/-

Utility Connection Charges (UCC) EEC/FFC


Reserved Covered Car Parking Space (One) PLC Floor PLC Green IFMS Club Membership

Page 1 of 2

*****
Payment Plan

W.E.F 01-03-2012

Residential Flat in SRS Residency at Sector- 88, Greater Faridabad, (Haryana)


Payment Plan ( Tower- A1, B1, B2, C1, C2, C3, C7, C8, C9 )
Booking Amount (1st Installment) Within 45 days of Booking (2nd Installment) On offer of Possession

` 307725/-for 2 BHK / ` 359013/- for 3 & 3+1 BHK 85% of BSP+100% of DC & Other Charges Balance BSP & Other Charges (if any)

Payment Plan ( Tower- C4, C5, C6 )


Booking Amount (1st Installment) Within 60 days of Booking (2nd Installment) Within 120 days of Booking (3rd Installment) On offer of Possession

` 307725/-for 2 BHK Payment of 25% BSP to be completed 10% of BSP + 100 % of DC Balance BSP & Other Charges (if any)

Note: In case possession of flat is offered prior to due date of any of the aforesaid installment(s), buyer will have to pay all remaining installments and charges on offer of possession of flat.

Payment Plan (Tower- D)


CONSTRUCTION LINKED INSTALLMENT PLAN Booking Amount ` 350000/- + 9013/- (Service Tax) = ` 359013/Payment of 20% BSP to be completed Within 60 days of Booking Within 120 days of Booking On Casting of Foundation On Casting of Ground Roof Slab On Casting of 1st Floor Roof Slab On Casting of 2nd Floor Roof Slab On Casting of 4th Floor Roof Slab On Casting of 6th Floor Roof Slab On Completion of Internal Plaster On completion of Flooring On offer of Possession
Note:

10%of BSP + 50 % of DC 10% of BSP + 50 % of DC 7.5% of BSP + 25% of Other Charges 7.5% of BSP + 25% of Other Charges 7.5% of BSP + 25% of Other Charges 7.5% of BSP + 25% of Other Charges 10% of BSP 10% of BSP 7.5% of BSP Balance Amount + Other Charges (as applicable)

Additional Car Parking ` 200000/- & Additional Power Back-up Installation ` 25000/- Per KVA.

Service Tax, as applicable shall be payable by applicant alongwith installments.

Page 2 of 2

You might also like