Presenting the State of the Art Green Technology through Advance Gasification
TET CCFBG 101 Cutting Energy Costs as well as improving emissions Wide range applications Robust, efficient, reliable and safe design
PERFORMANCE DATA Gasification Process TET - CCFB 101 Type of Gasifier Catalic Circulating Fluidized Bed Fuel Biomass, Dreid Low Grade Coal or Better Proximate Analysis of Fuel Moisture %-adb 10.00 Ash %-adb 3.50 Colotile Matter %-adb 41.70 Fixed Carbon %-adb 44.80 Total Proximate %-adb 100.00 Ultimate Analysis of Fuel Carbon %-adb 71.80 Hydrogen %-adb 5.60 Oxygen %-adb 17.27 Nitrogen %-adb 1.16 Sulfur %-adb 0.68 Ash %-adb 3.50 Total Ultimate %-adb 100.00 Higher Heating Value of Fuel kcal/kg 6,200.00 Steam/Coal a) kg/kg 0.49 Oxygen/Coal a) kg/kg 1.26 Air/Coal a) kg/kg 4.37 Gasifivation Temperature C 650.00 Gasification Pressure Atm 1.23 Product Gas Analysis CO %-v/v 25.16 H2 %-v/v 58.37 CH4 %-v/v 4.20 CO2 %-v/v 11.44 O2 %-v/v 0.57 N2 %-v/v 0.26 CnHn %-v/v H 2S %-v/v Trace Components %-v/v Total Gas Analysis %-v/v 100.00 kcal/NM3 Higher Heating Value of Gas 2,940.00 Tar Oil Produced No Gasifier Outlet Temperature C 645.00 NM3/kg-coal Product Gas Yield 1.86 Carbon Convertion % 63.00 Gas Efficiency % 88.32
PLC control system including: Pressure, flow, temperature indicator Centralized valve control PID Controller Redundant structure Motor FC controller On Field controller Interlock system as safety Measurement and safety task
Geothermal Law
(Law No. 27/2003)
Small Distributed Power Generation using Renewable Energy (Ministerial Decree: No. 1122 K/30/MEM/2002)
Developer : Small Enterprises Capacity : < 1 MW Electricity Price by Utility :
60% x Utilitys Production Cost, if connected to the low voltage grid 80% x Utilitys Production Cost, if connected to the medium voltage grid
Medium Scale Power Generation using Renewable Energy (Ministerial Regulation : No. 002/2006)
Developer : Business Entity Capacity : 1 < Cap 10 MW Electricity Price by Utility :
60% x Utilitys Production Cost, if connected to the low voltage grid 80% x Utilitys Production Cost, if connected to the medium voltage grid