CAUVERY NEERAVARI NIGAMA LIMITED

Zone

Circle
Division

Hemavathy Canal Zone,TumKur


:

Hemavathy Canal Circle,Turuvekere


:

Amount in Rupees.

Printed Date : 30/03/2012

Hemavathi Canal Investigation Division,Hebbur


Annual Work Programme for the year - 2011-12

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

Abstract1

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Capital Works , General , Anecut & its Channels , Improvements Fresh Works
1

584

Improvements to
sankenapura pick
up and RBC in
Kunigal Taluk.

29,65,000

29,65,000

29,65,000

45,901

2 Since work is
approved
from nigam,
to in
corporate the
work in AWP
for the year
2011-12,
Work is
proposed for
finalisation of
work.

585

Improvements to
Feeder channel of
Sankenapura Ane
in Kunigal Taluk.

29,00,000

29,00,000

29,00,000

3,064

0 Approval to
include the
work in AWP
of 2011-12 is
obtained from
Nigam.
Hence
proposed for
finalisation of
work.

Anecut & its


Channels

Total

58,65,000

58,65,000

58,65,000

48,965

421

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Capital Works , General , Buildings , Special Repairs Fresh Works

Construction of
71/2011-12,25compound wall of
11-2011
Hemavathy Colony,
Nagavalli
Buildings
Total

1,85,000

758

1,91,475

0 chikkasw 92, 11-01amy


2012

1,91,475

758

1,85,000

1,85,000

100 Estimate to
be prepared.

1,85,000

758

1,91,475

1,91,475

758

1,85,000

1,85,000

100

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Capital Works , General , Buildings , Repairs Fresh Works
4

422

423

Construction of
compound wall of
Hemavathy Colony,
Kunigal
Repairs to
142/2011H.C.I.Division office 12,20-01-2012
buildings @ hebbur

1,00,000

1,00,000

1,00,000

1,00,000

100 Estimate to
be prepared.

3,00,000

1,789

3,00,000

3,00,000

3,00,000

100 Estimate to
prepared.

Buildings

4,00,000

1,789

4,00,000

4,00,000

4,00,000

100

Total

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Capital Works , General , Drinking Water Schemes , New Constructions Fresh Works
6

494

"Providing Drinking 46/2011-12,05- 3,25,00,000


11,95,000
0
35,91,000
2,61,901 3,22,38,099 3,25,00,000 1,50,00,000
Water Supply To
07-2011
Doddaguni
M.I.Tank
Lifting Total
Drinking By
Water
3,25,00,000
11,95,000
0
35,91,000
2,61,901 3,22,38,099 3,25,00,000 1,50,00,000
Schemes
Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Capital Works , General , Roads , Improvements Fresh Works

46

46

407

Improvement to
road from Kallur
road,Basavapura
gate to SampigeNittur road to
basavapura hatti in
Turuvekere Taluk

6,00,000

6,00,000

6,00,000

4,00,000

67 As per the
Representati
on of Hon,ble
MP Tumkur
constituency,
Work is
proposed.

405

Improvement to
134,20-01road from Nalligere- 2012
Sira road to
Hosahatti village
under D-12

4,00,000

6,848

4,00,000

4,00,000

2,50,000

62 As per the
representatio
n of Hon'ble
MLA Gubbbi
constituency,
Work is
proposed.

406

Improvement to
137,20-01road from
2012
Koppadapalya to
Hosur village under
D-12

4,00,000

5,768

4,00,000

4,00,000

2,50,000

62 As per the
repersentatio
n of Hon'ble
MP Tumkur
constituency
Work is
proposed.

10

408

Improvement to
140,20-01road from
2012
Vadavanagatta to
K.Mathigatta under
D-11 in Gubbi Taluk

4,00,000

10,656

3,81,719

0 K.S.Shiv 159, 06-03kumar


2012

3,92,375

4,00,000

2,50,000

62 As per thye
Representati
on of Hon,ble
MP tumkur
constituency ,
work is
proposed.

11

410

Improvement of
136/2011road from APMC of 12,20-01-2012
Sampige village to
sampige tank
atchkat

3,00,000

7,846

3,00,000

3,00,000

2,00,000

67 As per the
representatio
n of Hon,ble
MLA
Turuvekere
constituency,
Work is
proposed.

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

12

411

Improvements to
Road from
Melekote to
Hosakere Tank
Atchkat.

21/2011-12,0710-2011

5,00,000

1,599

5,06,279

13

413

Formation and
135/2011improvements to
12,02-01-2012
road from
Kumkumanahalli to
Doddasarangi via
139 and 140th km
of TBC

7,00,000

7,536

14

414

2,00,000

2,895

1,99,990

15

416

Improvements to
79,26-11-2011
service road from
Yallapura village
road to
Andanayanapalya
road of L-2A 4th Km
and removing
neelgire tree stems.
Improvements to
138,20-01approach road and 2012
construction of
causeway to waste
weir halla of Bennur
tank

4,16,000

1,124

16

417

Improvements to
Road from Bilinandi
to chikkakallur
village in gubbi Tq.

4,00,000

17

418

Improvements to
Road from
Atthikatte to
Gollarahatti in gubbi
Tq.

3,00,000

Agency
Name

Agreement
Total
No & Date Expenditutre

0 chikkasw 99, 21-01amy


2012

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

5,06,279

1,599

5,00,000

3,00,000

60 As per the
representatio
n of Hon,ble
MLA Tumkur
Constituency,
Work is
proposed.

7,00,000

7,00,000

4,00,000

57 As per the
representatio
n of Hon,ble
MLA Tumkur
Rural
constituency,
Work is
proposed.

0 T.H.Shiv 94, 18-01anna


2012

2,02,885

2,00,000

1,50,000

75 As per the
representatio
n of Hon,ble
CM,s office
Work is
proposed.

4,16,000

4,16,000

3,97,000

95 As per the
representatio
n of Hon,ble
MLA Gubbi
constituency,
Work is
proposed.

4,00,000

4,00,000

2,50,000

62 As per the
representatio
n of Hon,ble
MLA
Turuvekere
Constituency
, Work is
proposed.

3,00,000

3,00,000

1,50,000

50 As per the
representatio
n of Hon'ble
MP Work is
Proposed.

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
18

419

Work Name

Sanction No.

Improvements to
road from
Bittagondanahalli to
Kallubove viilage in
Gubbi Tq.

Roads

Total

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

4,00,000

8,480

3,70,000

50,16,000

52,752

14,57,988

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

0 PR
156, 20-03Channiga 2012
ppa

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

3,78,480

4,00,000

2,50,000

5,06,279

44,91,339

50,16,000

32,47,000

% Grant

Remarks

62 As per the
representatio
n of
Hon'bleMLA
Turuvekere
constituency ,
Work is
proposed.
65

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Capital Works , General , Roads , New Constructions Fresh Works
19

409

Formation of road 133,20-01from Mallenahalli to 2012


Yaladabogi dodda
halla in Turuvekere
tq

4,00,000

8,537

4,00,000

4,00,000

2,50,000

62 As per the
representatio
n of Hon,ble
MP tumkur
constituency ,
work Is
proposed.

20

412

Construction of
causeway to
connect kothagere
atchkat from
madikehalliRamabana hanta
road

7,00,000

7,00,000

7,00,000

4,00,000

57 As per the
repersentatio
n of Hon'ble
MLA Kunigal
Constituency,
Work is
proposed.

21

415

Formation of road 63/2011-12,14from kotebuda via 11-2011


hulipura tank to
venkatappa garden
under L-2c of D-26

2,00,000

3,062

1,99,892

0 M.K.Sidd 91, 09-01agangaia 2012


h

2,02,954

2,00,000

1,50,000

75 As per the
representatio
n of Hon,ble
MLA Kunigal
constituency
,Work is
proposed.

13,00,000

11,599

1,99,892

13,02,954

13,00,000

8,00,000

62

Roads

Total

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Capital Works , General , Tanks , Repairs Fresh Works
22

425

Repairs
toRamabana
channel PO's and
syphon under
Tanks

75/2011-12,2511-2011

2,00,000

9,214

1,98,329

0 S.N.Prak 93, 18-01ash


2012

1,97,149

10,394

2,00,000

2,00,000

100 Estimate to
be prepared

Total

2,00,000

9,214

1,98,329

1,97,149

10,394

2,00,000

2,00,000

100

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Capital Works , General , Tanks , Restoration & Rejuvenation Fresh Works
23

438

Restoration of Pura tank in Gubbi taluk


Tanks

Total

30,00,000

30,00,000

30,00,000

4,70,000

16 Estimate to
be prepared.

30,00,000

30,00,000

30,00,000

4,70,000

16

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Special Programs , SCP , Distributaries , New Constructions Fresh Works
24

463

25

464

Providing borewell
at Sy.No.14 in
Karegowdanahalli
village in Gubbi
Drilling

26

465

Borewell,Providing
Electrical pump @
Sy.139
Drilling in

27

466

87/2011-12,1712-2011

85/2011-12,17Borewell,Providing 12-2011
Electrical pump @
Sy.174,176,167,16
Construction of
42/2011-12,29Krishihonda at
10-2011
Sy.No. 14/2 in
Karegowdanahalli

5,00,000

13,402

4,35,049

65,000 Sri
139, 23-02Meenaks 2012
hi
borewells 125, 14-0294,000 Royal
Tubewell 2012
s

5,13,451

5,00,000

5,00,000

100 EStimate to
be prepared.

5,00,000

9,624

3,82,950

4,86,574

5,00,000

5,00,000

100 Estimate to
be prepared.

5,00,000

9,712

3,79,843

96,000 Royal
118, 14-02Tubewell 2012
s

4,85,555

5,00,000

5,00,000

100 Estimate to
be prepared.

1,00,000

10,204

91,583

0 P.G.PRA 85/2011-12,
BHU
14-12-2011
PRASAD

1,01,787

1,00,000

1,00,000

100 Estimate to
be prepared.

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
28

467

Work Name

Construction of
Krishihonda at
Sy.No. 79 in
Nandihalli village ,
Distributaries

Sanction No.

41/2011-12,2910-2011
Total

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

1,00,000

10

66,873

17,00,000

42,952

13,56,298

Agency
Name

Agreement
Total
No & Date Expenditutre

0 P.G.PRA 83/2011-12,
BHU
14-12-2011
PRASAD
2,55,000

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

66,883

1,00,000

1,00,000

16,54,250

17,00,000

17,00,000

% Grant

Remarks

100 EStimate to
be prepared.
100

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Special Programs , SCP , Drip & Sprinklers , New Constructions Fresh Works
29

461

30

462

Providing Drip
92/2011-12,17Irrigation system in 12-2011
Sy No.147 of
Bukkasagar
Providing dripvillage 89/2011-12,17irrigation and drilling 12-2011
borewell in
Sy.No.62
of
Drip & Sprinklers
Total

4,00,000

6,111

3,50,139

4,00,000

6,999

3,79,225

8,00,000

13,110

7,29,364

54,000 Sri
137, 23-02Meenaks 2012
hi
25,000 Borewells
Royal
119, 14-02tube
2012
wells

4,10,250

4,00,000

4,00,000

100 Estimate to
be prepared.

4,11,224

4,00,000

4,00,000

100 Estimate to
beprepared.

79,000

8,21,474

8,00,000

8,00,000

100

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Special Programs , SCP , Pick ups , New Constructions Fresh Works
31

450a

32

448

33

449

Construction of
74/2011-12,25pickup in Sy.No.251 11-2011
of Kadaba village in
Gubbi Taluk. of pick 51/2011-12,29Constrcution
upacross halla near 10-2011
Sy no 55 under L/S
minor of L-1 sub
constrcution
of pick 72/2011-12,25-

34

450

up across halla
near Sy no 19
under
of L-2Aofsub
Construction

35

451

3,50,000

8,750

3,24,795

16,455 B H
69, 22-03Jayaram 2012

3,50,000

3,50,000

2,00,000

5,50,000

3,977

4,76,061

23,325 H.V.
111/2011-12,
Narayan 13-02-2012

5,03,363

5,50,000

5,50,000

100 Estimate to
be prepared.

4,22,000

12,759

4,28,004

16,996 H.V.Nara 112, 13-02yan


2012

4,57,759

4,22,000

4,22,000

100 Estimate to
be prepared.

4,00,000

10,720

3,95,741

0 N.Narash 136, 23-02imaiah


2012

4,06,461

4,00,000

2,00,000

50 Estimate to
be prepared.

3,00,000

11,139

2,81,648

0 KTR
Swamy

2,92,787

3,00,000

3,00,000

100 Estimate to
be prepared.

20,22,000

47,345

19,06,249

20,10,370

20,22,000

16,72,000

11-2011

83/2011-12,17guide wall to
12-2011
escape halla in
sy.No. 13 of of pick 73/2011-12,25Construction
up across halla
11-2011
near Sy.No.7 in
Karegowdanahalli
Pick ups
Total

140, 25-022012

56,776

57

83

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Special Programs , SCP , Roads , Improvements Fresh Works
36

456

37

457

Improvements to
road from left side
wasteweir of
Adugondanahalli
Improvements to

38

458

Road from
kalenahalli to
S.kodagihalli
SC
Formation and

39

459

40

41

27/2011-12,0710-2011

2,00,000

1,822

1,99,992

0 G.PRAK 74/2011-12,
ASH
12-12-2011

1,64,268

37,546

2,00,000

2,00,000

100 Estimate to
be prepared.

48,29-10-2011

2,00,000

2,00,000

1,99,908

0 n.pradee 87, 01-02p


2012

1,99,836

2,00,072

2,00,000

2,00,000

100 Estimate to
be prepared.

2,00,000

7,455

2,00,000

2,00,000

2,00,000

100 Estimate to
be prepared.

2,00,000

8,049

1,99,987

0 T.H.Shiv 95, 18-01anna


2012

2,08,036

2,00,000

2,00,000

100 Estimate to
be prepared.

460

68/2011-12,25improvements CS 11-2011
pura koppa road to
Mathikere colony
improvements
of in 57/2011-12,14roads in Sc colony 11-2011
of Hulivana village
under L-2A distry
Improvements
of
-

2,00,000

2,00,000

2,00,000

2,00,000

100 Estimate to
be prepared.

468

roads in Sc colony
of
Andanayanapalya
Improvements to

2,00,000

1,875

1,99,908

0 N.pradee 87, 02-01p


2012

2,01,783

2,00,000

2,00,000

100 Estimate to
be prepared.

48/2011-12,29approach road from 10-2011


SC colony @
Kalenahalli to

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
42

469

Work Name

Sanction No.

Improvements to
82/2011-12,17road from Sy No.77 12-2011
to Nandihallipalya in
Gubbi Tq.
Roads
Total

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

3,00,000

7,575

2,79,776

15,00,000

2,26,776

10,79,571

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

0 C.V.Mah 104, 03-02alingaiah 2012


0

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

2,87,351

3,00,000

3,00,000

3,64,104

13,34,788

15,00,000

15,00,000

% Grant

Remarks

100 Estimate to
be prepared.
100

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Special Programs , TSP , Distributaries , New Constructions Fresh Works
43

470

44

471

45

472

46

473

47

474

48

475

Drilling of Borewell, 84/2011-12,17Elelctric pump @


12-2011
Sy No.190,191 in
L-3C
Minor
of
Drilling
of Borewell,
90/2011-12,17Elelctric pump @
12-2011
Sy No.49 of
Menasinahalli
Drilling of Borewell, 86/2011-12,17Elelctric pump @
12-2011
Sy No.10P in SubDistry ofofR-8
in
Drilling
Borewell,
Elelctric
@
Drilling ofpump
Borewell,

49

477

50

478

Elelctric
Drilling ofpump @
91/2011-12,17Borewell,Supply
12-2011
and Fixing Elelctric
pump
and Providing
Construction
of
38/2011-12,07Krishihonda at
10-2011
Sy.No. 77 in
Nandihalli village
Construction
of , 43/2011-12,29-

479

Krishihonda at
Sy.No. 132 in
Nandihalli village
Construction
of ,

52

480

Krishihonda at
Sy.No. 77/1 in
Nandihalli
village
Construction
of ,

53

481

54

482

51

5,00,000

8,444

3,72,554

80,000 Royal
120, 14-02Tubewell 2012
s

4,60,998

5,00,000

5,00,000

100 Estimate tobe


prepared

4,50,000

8,399

3,74,671

78,000 Royal
121, 14-02Tubewell 2012
s

4,61,070

4,50,000

4,50,000

100 Estimate to
be prepared

4,50,000

8,444

3,77,729

75,000 Royal
122, 14-02Tubewell 2012
s

4,61,173

4,50,000

4,50,000

100 Estimate to
be prepared

4,50,000

4,50,000

4,50,000

100

4,62,407

4,50,000

4,50,000

100

4,60,353

4,50,000

4,50,000

100

1,01,918

1,00,000

1,00,000

100 Estimate to
prepared

0 P.G.PRA 83/2011-12,
BHU
14-12-2011
PRASAD

69,160

1,00,000

1,00,000

100

1,00,000

1,00,000

1,00,000

100 Estimate tobe


prepared

4,50,000

4,50,000

8,908

3,79,499

4,50,000

6,886

3,53,467

0
74,000 Toyal
Tube
1,00,000 Sri

126, 14-02201223-02138,

Meenaks 2012
hi
0 borewells
B.N.Arun 79, 14-12kumar
2011

1,00,000

3,627

98,291

1,00,000

3,627

65,533

36/2011-12,0710-2011

1,00,000

3,628

44/2011-12,29Krushihonda in Sy 10-2011
No.21/2 & 21/3 of
Singasandra
village 46/2011-12,29Construction of
Krushihonda in Sy 10-2011
No.21 of
Singasandra of
village 45/2011-12,29Construction

1,00,000

3,766

98,149

0 R.RAMA 77/2011-12,
KRISHN 14-12-2011
A

98,102

3,813

1,00,000

1,00,000

100

1,00,000

3,766

98,149

0 B.N.ARU 78/2011-12,
NKUMA 14-12-2011
R

98,141

3,774

1,00,000

1,00,000

100

1,00,000

3,766

98,149

0 P.Raman 163, 06-03areddy


2012

1,01,915

1,00,000

1,00,000

100

33,50,000

63,261

23,16,191

1,96,243

31,36,581

33,50,000

33,50,000

100

10-2011

Krushihonda in Sy 10-2011
No.16 of
Singasandra
village Total
Distributaries

4,07,000

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Special Programs , TSP , Distributaries , New Supplies Fresh Works
55

476

Drilling of borewell
in Sy.No.51 of
Rayagonahalli,
Kothagere
Hobli,
Distributaries

88/2011-12,1712-2011

4,50,000

8,799

3,81,502

71,000 Royal
123, 14-02Tubewell 2012
s

4,61,301

4,50,000

4,50,000

100 Estimate tobe


prepared

Total

4,50,000

8,799

3,81,502

71,000

4,61,301

4,50,000

4,50,000

100

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Special Programs , TSP , Pick ups , New Constructions Fresh Works
56

484

57

485

58

486

Construction of
93/2011-12,25pickup across halla 11-2011
near Sy.No.79 in
Girinayakanapalya
Drilling borewell,
93/2011-12,17supplying and fixing 12-2011
electrical pump in
Sy. No. 25 of of
Construction
141,20-01Pickup across halla 2012
near Sy.No.52 of
Rayagonahalli,

6,00,000

7,727

4,53,821

4,50,000

7,799

3,81,504

4,00,000

957

0 chikkasw 93, 04-03amy


2012
72,000 Royal
124, 14-02Tubewell 2012
s
0

4,49,009

12,539

6,00,000

6,00,000

100 Estimate to
be prepared

4,61,303

4,50,000

4,50,000

100 EStimate to
be prepared.

4,00,000

4,00,000

4,00,000

100 Estimate to
be prepared.

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
59

487

60

455

61

454

Work Name

Sanction No.

Construction of
117/2011pickup across
12,13-01-2012
Sy.No.1 of Madhure
Kaval of Hurali
Constrcution
of pick 64/2011-12,21up across halla
11-2011
near Sy no 52
under
of R-8 of
sub
Construction
pick 66/2011-12,21upacross halla near 11-2011
Sy.No.112 in
Nandihalli
Pick
ups village of Total

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

3,00,000

2,507

2,97,493

6,00,000

1,385

4,83,174

6,72,000

9,517

5,02,754

30,22,000

29,892

21,18,746

Agency
Name

Agreement
Total
No & Date Expenditutre

0 TH
158, 05-03Venkatac 2012
hala

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

3,00,000

3,00,000

3,00,000

100 Estimate to
be prepared.

16,680 K.Jagade 102/2011-12,


esh
23-01-2012

5,01,239

6,00,000

6,00,000

100 Estimate to
be prepared.

22,000 B.C.Shiv 141, 25-02akumar 2012

5,34,271

6,72,000

6,72,000

100

4,49,009

22,09,352

30,22,000

30,22,000

100

1,10,680

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Special Programs , TSP , Roads , New Constructions Fresh Works
62

489

63

490

64

491

65

492

66

493

Improvements to
roads from
Kenchanahalli to
comanad area to
of
Improvements

28/2011-12,0710-2011

road
from Agrahara
Improvements
to
189/2011road from
12,20-12-2011
Bukkasagara village
to Changavi to
Improvements
80/2011-12,17road to
12-2011
Kenchanahalli in
Gubbi Taluk
Formation
ofunder
road in 56/2011-12,149th km of D-26 to
ST Colony in
Hurulagere
village
Roads

3,50,000

967

2,37,342

2,38,309

3,50,000

3,50,000

100

6,00,000

5,85,000

6,00,000

6,00,000

100

11,50,000

3,109

11,50,000

11,50,000

11,50,000

100

3,00,000

6,985

2,78,339

0 PL
133, 17-02Ramakris 2012
hnaiah

2,85,324

3,00,000

3,00,000

100

2,00,000

5,116

1,99,894

0 N.PRAD 89/2011-12,
EEP
06-01-2012

2,05,010

2,00,000

2,00,000

100

26,00,000

16,177

7,15,575

24,63,643

26,00,000

26,00,000

100

11-2011
Total

0 PL
134, 17-02Ramakris 2012
hnaiah

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Special Programs , TSP , Roads , Improvements Fresh Works
67

488

Improvements to
81/2011-12,17roads from
12-2011
Nanadihalli village
to
comanad area of Total
Roads

4,00,000

9,096

3,71,000

0 R umesh 129, 17-022012

3,80,096

4,00,000

4,00,000

100 EStimate to
be prepared.

4,00,000

9,096

3,71,000

3,80,096

4,00,000

4,00,000

100

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Potential Works , General , Canals & Branches , New Constructions Fresh Works
68

46

69

47

70

48

71

49

72

50

73

51

74

52

75

53

76

54

Earth work
excavation for trial
pits and trial bores
from ch: 200.000
exploration
of trial

02/2011-12,0806-2011

5,00,000

82

5,42,654

23,805 J.T.JAYA 53/2011-12,


NNA
29-07-2011

5,66,541

5,00,000

1,50,000

30 Estimate to
be prepared

03/2011-12,08bore from ch:


06-2011
200.700 to 201.200
km and 206.150
Exploration
of trialto 4,08-06-2011
bore
from of trial
Excavation
5,08-06-2011

4,70,000

3,926

5,25,049

5,24,947

4,028

4,70,000

1,41,000

30

4,80,000

4,86,565

4,85,565

1,000

4,80,000

1,44,000

30

4,74,000

2,859

5,30,758

0 M/S
54/2011-12,
kARNAT 29-07-2011
AKA
TEST
0 M/s
55, 29-072011
0 Karnatak
M/s
56, 29-07-

5,30,738

2,879

4,74,000

1,42,000

30

bore from ch:


Exploration
of trial
bore
from ch:
Exploration
of trial

6,09-06-2011

4,40,000

813

4,94,982

4,89,864

5,931

4,40,000

1,32,000

30

7,09-06-2011

4,80,000

5,59,123

5,59,122

4,80,000

1,44,000

30

4,64,000

743

5,22,098

Karnatak 2011
0 J.G.
31, 27-070 Jayanna
J.G.Jaya 2011
32, 27-07nna
2011
0 J
G
33/2011-12,

5,11,861

10,980

4,64,000

1,40,000

30

4,92,000

1,500

5,52,813

27-07-2011
0 JAYANN
JG
34/2011-12,
JAYANN 27-07-2011
A

5,52,723

-60,723

4,92,000

1,48,000

30

4,10,000

5,260

4,47,343

0 GJ
35, 27-07JAYANN 2011
A

3,16,140

1,36,463

4,10,000

1,23,000

30

bore
from ch:
Exploration
of Trial
bore
from ch:
Excavation
of trial

09/2011-12,0906-2011

bore from ch:


204.400 to 204.475
km of TBC of trial 10/2011-12,09Exploration
bore from ch:
06-2011
204.500 to 204.550
km of TBC

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
77

55

78

56

79

57

80

58

81

59

82

60

83

61

84

62

85

63

86

64

87

65

88

66

89

67

90

68

91

70

92

69

93

71

94

72

95

73

96

74

97

75

Work Name

Sanction No.

Exploration of trial 11/2011-12,09bore from ch:


06-2011
204.575 to 204.625
km of TBC of trial 12/201-12,09Exploration
bore from ch:
06-2011
Exploration of trial 13/2011-12,09bore from ch:
06-2011
204.725 to 204.775
km of TBC of trial 14/201-12,09Exploration
bore from ch:
Exploration of trial
bore from ch:
204.875 to 204.950
km of TBC of trial
Exploration

06-2011
15/2011-12,0906-2011

16,09-06-2011
bore from ch:
Exploration of trial 17/2011-12,09bore from ch:
06-2011
205.550 to 206.050
km of TBC of DPR 27,11-11-2010
Preparation
& investigation of
Earth work
excavation
Earth
work and
-

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

4,51,000

801

5,07,396

0 JG
36, 27-07JAYANN 2011
A

5,04,473

3,724

4,51,000

1,35,000

30

4,82,000

179

5,43,037

4,296

4,82,000

1,45,000

30

2,233

5,38,468

37/2011-12,
27-07-2011
38, 27-072011

5,38,920

4,80,000

0 JG
JAYANN
0 JG
JAYANN
A

5,37,858

2,843

4,80,000

1,44,000

30

4,30,000

2,233

4,82,021

4,914

4,30,000

1,29,000

30

1,176

5,48,671

39, 27-072011
40, 27-072011

4,79,340

4,86,824

0 JG
JAYANN
0 JG
JAYANN
A

5,43,408

6,439

4,82,000

1,45,000

30

4,86,000

5,63,510

732

4,86,000

1,46,000

30

6,195

5,06,949

41, 27-072011
42, 27-072011

5,62,778

4,56,000

0 J.G.
Jayanna
0 JG
JAYANN
A

5,06,949

6,195

4,56,000

1,37,000

30

5,00,000

3,00,000

8,838

2,98,076

10,762

5,00,000

1,20,000

24

1,35,00,000

0 B.Ramak
rishnaiah
0

1,35,00,000

1,35,00,000

34,00,000

25

4,85,00,000

4,85,00,000

4,85,00,000

1,21,25,000

25

excavation
Earth work and
excavation
Earth
work and

3,50,00,000

3,50,00,000

3,50,00,000

87,50,000

25

8,55,00,000

8,55,00,000

8,55,00,000

40,00,000

excavation
Earth work and
excavtion and
Earth work
excavation
Earth
work and

28,60,00,000

0 28,60,00,000 28,60,00,000

35,65,000

7,00,00,000

7,00,00,000

7,00,00,000

10,00,000

1,05,00,000

1,05,00,000

1,05,00,000

9,81,000

excavation
Earth
work and
excavatoion
Providing
CCand
lining 169/2011from ch: 135775 m 12,02-12-2011
to 136040 m in
136th
km CC
of TBC
Providng
lining -

2,90,00,000

2,90,00,000

2,90,00,000

10,00,000

33,30,503

9,497

33,40,000

27,00,000

14,00,000

52

99,00,000

99,00,000

99,00,000

56,96,000

58

in
167th km ofofTBC 24/2011-12,07Construction
CTC in 1st km of
10-2011
minor afftaking at
ch:
153800 mofin km 25/2011-12,07Construction
CTC in 2nd km of
10-2011
minor offtaking at
ch:
153800works
m in at CER NO.
Protective

4,72,255

1,105

4,86,855

26,640 RK
prakash
kumar

5,14,600

4,00,000

2,00,000

50

5,00,000

28,447

4,79,153

29,040 A G
25, 07-10Srinivasa 2011

5,36,640

5,00,000

2,50,000

50

39,98,729

1,271

45,00,998

45,02,269

30,00,000

15,50,000

52

ch: 142225 m of
TBC Gulur-Hebbur
drinking water of
LIS scheme

94/2011-12,1410-2011

0
116, 13-022012

0 J.K.MAN 08/2011-12,
JUNATH 16-02-2012

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
98

586

Work Name

Sanction No.

Excavation and
partial embakment
from ch:0 to 1000 m
in 1st km of Yediyur
D-26 of TBC

Detailed /
Estimated
Cost
17,00,000

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work
0

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

17,00,000

Actual
Balance
Cost
17,00,000

Allotted
grant for
2011-12
1,97,821

% Grant

Remarks

12 The above
work is not
included in
the AWP of
2009-10,
2010-11. The
completion
certificate as
been counter
signed by CE
HCZ,
TUMKUR.
vide lr
No.540/11-12
Dt.7-6-2011.
In order to
finalise the
work grant of
Rs.197821 is
sought for. In
this context a
detailed
report has
been
submitted to
SE, HC
Circle,
Turuvekere
vide lr
No.1321/1112 Dt.12-122011.
Approval to
the work is
requested.

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
99

587

Work Name

Sanction No.

Earth work
excavation and
formation of
embankment from
ch: 183000 m to
184000 m in 184th
km of TBC.

Canals &
Branches

Total

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

38,50,000

60,97,33,311

3,68,320

1,38,27,281

79,485

Agreement
Total
No & Date Expenditutre

* Balance
Cost

38,50,000

Actual
Balance
Cost

Allotted
grant for
2011-12

38,50,000

46,512

79,42,762 60,30,50,514 60,80,27,000

4,65,26,333

% Grant

Remarks

1 The above
work is not
included in
the AWP of
2009-10,
2010-11. The
completion
certificate as
been counter
signed by CE
HCZ,
TUMKUR.
vide lr
No.763/11-12
Dt.28-6-2011.
In order to
finalise the
work grant of
Rs.46512 is
sought for.

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Potential Works , General , Distributaries , New Constructions Fresh Works
100

209

101

210

102

211

103

212

104

213

105

214

106

215

107

216

108

217

109

218

110

219

111

220

112

221

113

222

Balance EWE And construction


of CD
Balance E.W.E
and 59/2011-12,14C.D. Works of
11-2011
Thogarigatta water
course under
Balance
EWE and -

8,80,000

8,80,000

8,80,000

4,75,000

54

3,00,000

5,108

2,69,000

3,00,000

1,70,000

57

4,00,000

4,00,000

4,00,000

2,00,000

50

77,18-11-2011

10,00,000

2,624

9,10,000

10,00,000

5,00,000

50

78,18-11-2011

10,00,000

3,928

8,45,000

10,00,000

5,00,000

50

31/2011-12,0710-2011

5,00,000

4,652

4,65,601

3,48,530

1,32,433

5,00,000

2,50,000

50

84/2009-10,11construction of CD 03-2010
works in 11th KM of
L1 sub distrubutory
Construction
of
115,25-11C.D.Works @
2011
EWE and
construction
EWE
and of CD 273,29-02-

4,15,000

489

64,173

4,15,000

4,15,000

2,00,000

48

10,00,000

3,563

7,00,000

10,00,000

5,00,000

50

20,00,000

20,00,000

20,00,000

10,00,000

50

79,21,447

8,982

1,69,571

81,00,000

25,00,000

12,50,000

50

construction of CD
EWE and
construction
EWE
and of CD

2012
-

40,00,000

40,00,000

40,00,000

20,00,000

50

10,00,000

10,00,000

10,00,000

5,00,000

50

construction
EWE and of CD construction
of CDin EWE
& CD works
1st km of
D-

10,00,000

10,00,000

10,00,000

5,00,000

50

10,00,000

10,00,000

10,00,000

5,00,000

50

embankment
in 9th
EWE & C.D.Works
in 3300m water
EWE & C.D.Works
in 3775m water
Balance EWE and
Construction of
C.D.Works under
Minor and
off taking @
EWE

10,710 N.NARA 89/2011-12,


SIMHIAH 06-01-2012

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
114

223

115

224

116

225

Work Name

Sanction No.

EWE & CD works in 2nd


of worksDEWEkm
& CD
in 1st km&of
EWE
CD works Din 68,25-11-2011
2nd & 3rd km of D-

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

5,00,000

5,00,000

5,00,000

2,50,000

50

10,00,000

10,00,000

10,00,000

5,00,000

50

5,00,000

2,09,752

0 KB
68, 25-11Somashe 2011

2,09,752

5,00,000

2,50,000

50

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
117

226

118

227

119

228

120

229

121

230

122

231

123

232

124

233

125

234

126

235

127

236

128

237

129

327

130

328

131

329

132

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

Survey and
investigation
Survey and and

1,00,000

1,00,000

19,760

1,80,240

1,00,000

50,000

50

5,00,000

5,00,000

4,54,642

5,45,358

5,00,000

1,94,000

39

investigation
Conducting ofand
detailed survey
Conducting
of of

2,00,000

2,00,000

29,700

3,70,300

2,00,000

60,000

30

3,00,000

3,00,000

3,00,000

90,000

30

detailed
of
EWE trialsurvey
pits from
KM 1 trial
to 3 pits
of D-29
EWE
from

4,00,000

4,00,000

4,00,000

80,000

20

4,00,000

4,00,000

4,00,000

80,000

20

KM
4 trial
to 6 pits
of D-29
EWE
from
KM 7 trial
to 9 pits
of D-29
EWE
from

4,00,000

4,00,000

4,00,000

80,000

20

4,00,000

4,00,000

4,00,000

80,000

20

KM
10trial
to 12
D-29 EWE
pitsoffrom
KM 13trial
to 15
D-29 EWE
pitsoffrom
KM
13trial
to 15
of D-29 EWE
pitsfrom

4,00,000

4,00,000

4,00,000

80,000

20

4,00,000

4,00,000

4,00,000

80,000

20

4,00,000

4,00,000

4,00,000

80,000

20

KM
19trial
to 21
of D-29 EWE
pitsfrom
KM
22 to 23 of
Construction
of D-29
Inlet 20/2011-12,07@ ch:13500 in 14th 10-2011
KM of SD-2 of D-24.

4,00,000

4,00,000

4,00,000

80,000

20

3,00,000

5,108

2,15,749

2,28,821

3,00,000

1,50,000

50

Construction of
22/2011-12,07C.T.C @ ch: 4500 10-2011
in 5th KM of
Jannenahalli Minor
Construction
of box 69/2011-12,25canal at Ch.6350 m 11-2011
in 7th km of D-25 A

4,00,000

88

3,84,664

7,964 P L
130, 17-02RAMAKR 2012
ISHNAIA
H
12,540 N.S.Shiv
103, 03-02aprasann 2012
a

3,97,292

4,00,000

2,00,000

50

5,00,000

14,849

4,69,835

50,893 G.Mohan 96, 21-012012

5,35,577

5,00,000

2,50,000

50

330

Construction of CD 54/2011-12,14works in 3rd km of 11-2011


D-27A

5,00,000

8,973

19,140

3,70,000

5,00,000

2,50,000

50

133

331

5,00,000

11,082

4,82,811

26,520 M.N.Srik 113, 13-02antaiah 2012

5,20,413

5,00,000

2,50,000

50

134

332

3,00,000

1,328

3,15,686

7,936 K
58, 04-11Ramann 2011
a

3,24,950

3,00,000

1,50,000

50

135

333

Construction of CD 55/2011-12,14works in Minor No.4 11-2011


and 5th km of D27A
Construction of
58/2011-12,14CTC @ ch:6600m 11-2011
of L-1 sub-distry of
D-26
Providing safety
149,22-01-

136

334

137

238

8,00,000

15,336

2,71,651

2,18,349

8,00,000

4,00,000

50

2012
-

9,00,000

9,00,000

5,00,000

2,50,000

50

3,00,000

3,00,000

3,00,000

60,000

20 Estimate tobe
prepared

3,00,000

3,00,000

3,00,000

60,000

20

4,00,000

4,00,000

4,00,000

80,000

20

KM
0 trial
to 6 pits
of D-31
EWE
from KM 7 trial
to 12
D-31 EWE
pitsoffrom
KM 13trial
to pits
18 of
D- EWE
from

4,00,000

4,00,000

4,00,000

80,000

20

4,00,000

4,00,000

4,00,000

80,000

20

4,00,000

4,00,000

4,00,000

80,000

20

arrangements and
Construction of
Head
sluice
EWE trial
pits@from
KM 0 to 5 of D-30

138

239

139

240

EWE trial pitsfrom


KM 6 trial
to 10pits
of D-30
EWE
from

140

241

141

242

142

243

143

244

KM
to works
22 of DEWE19
&CD
in 1st km of D-29

60,00,000

60,00,000

60,00,000

6,00,000

10 Estimate tobe
prepared

144

245

EWE &CD works in 2nd km of D-29

60,00,000

60,00,000

60,00,000

6,00,000

10 Estimate tobe
prepared

145

246

60,00,000

60,00,000

6,00,000

10

247

50,00,000

50,00,000

50,00,000

6,00,000

12

147

249

EWE &CD works in 3rd


km&CD
of D-29
EWE
works in 4th km&CD
of D-29
EWE
works in -

60,00,000

146

60,00,000

60,00,000

60,00,000

5,00,000

6th km of D-29

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
148

250

149

251

150

252

151

253

152

254

153

248

154

255

155

256

156

257

157

258

158

259

159

260

160

261

161

262

162

263

163

264

164

265

165

268

166

269

167

270

168

266

169

267

170

271

171

272

172

273

173

274

174

275

175

276

176

277

177

278

178

279

179

280

180

281

181

282

182

283

183

284

184

285

185

286

186

287

187

288

188

289

189

290

190

291

191

292

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

EWE &CD works in 7th


km&CD
of D-29
EWE
works in 8th km&CD
of D-29
EWE
works in -

60,00,000

60,00,000

60,00,000

5,00,000

60,00,000

60,00,000

60,00,000

3,00,000

60,00,000

60,00,000

60,00,000

3,00,000

9th
km&CD
of D-29
EWE
works in 10th km
of D-29
EWE
&CD
works in 11th km
of D-29
EWE
&CD
works in -

60,00,000

60,00,000

60,00,000

3,00,000

40,00,000

40,00,000

40,00,000

2,00,000

60,00,000

60,00,000

60,00,000

5,00,000

5th km&CD
of D-29
EWE
works in 12th km
of D-29
EWE
&CD
works in 13th
of D-29
EWEkm
&CD
works in -

4,00,000

4,00,000

4,00,000

2,00,000

50

4,00,000

4,00,000

4,00,000

2,00,000

50

4,00,000

4,00,000

4,00,000

2,00,000

50

14th
of D-29
EWEkm
&CD
works in 15th
of D-29
EWEkm
&CD
works in 16th km
of D-29
EWE
&CD
works in -

4,00,000

4,00,000

4,00,000

2,00,000

50

4,00,000

4,00,000

4,00,000

2,00,000

50

4,00,000

4,00,000

4,00,000

2,00,000

50

17th
of D-29
EWEkm
&CD
works in 18th km
of D-29
EWE
&CD
works in 19th
of D-29
EWEkm
&CD
works in -

4,00,000

4,00,000

4,00,000

2,00,000

50

4,00,000

4,00,000

4,00,000

2,00,000

50

4,00,000

4,00,000

4,00,000

2,00,000

50

20th
of D-29
EWEkm
&CD
works in 21th
of D-29
EWEkm
&CD
works in 22th km
of D-29
EWE
&CD
works in -

4,00,000

4,00,000

4,00,000

2,00,000

50

4,00,000

4,00,000

4,00,000

2,00,000

50

60,00,000

60,00,000

60,00,000

2,00,000

2nd
of D-30
EWEkm
&CD
works in 3rd km of D-30

60,00,000

60,00,000

60,00,000

2,00,000

3 Estimate tobe
prepared

EWE &CD works in 4th km


of D-30
EWE
&CD
works in 23th km
of D-29
EWE
&CD
works in -

6,00,000

6,00,000

6,00,000

2,00,000

33

4,00,000

4,00,000

4,00,000

2,00,000

50

60,00,000

60,00,000

60,00,000

2,00,000

1st km
of D-30
EWE
&CD
works in 5th
of D-30
EWEkm
&CD
works in 6th km
of D-30
EWE
&CD
works in -

5,00,000

5,00,000

5,00,000

2,00,000

40

5,00,000

5,00,000

5,00,000

2,00,000

40

5,00,000

5,00,000

5,00,000

2,00,000

40

7th
of D-30
EWEkm
&CD
works in 8th km
of D-30
EWE
&CD
works in 9th
of D-30
EWEkm
&CD
works in -

4,00,000

4,00,000

4,00,000

2,00,000

50

4,00,000

4,00,000

4,00,000

1,80,000

45

4,00,000

4,00,000

4,00,000

1,00,000

25

10th
ofworks
D-30 in EWE km
&CD
1st
of D-31
EWEkm
&CD
works in 2nd km
of worksD-in EWE
&CD

60,00,000

60,00,000

60,00,000

1,00,000

62,00,000

62,00,000

62,00,000

1,00,000

55,00,000

55,00,000

55,00,000

1,00,000

3rd
of works
D-31
EWEkm
&CD
in 4th km
of D-31
EWE
&CD
works in 5th
of D-31
EWEkm
&CD
works in -

60,00,000

60,00,000

60,00,000

1,00,000

55,00,000

55,00,000

55,00,000

1,00,000

55,00,000

55,00,000

55,00,000

1,00,000

6th km
of D-31
EWE
&CD
works in 7th
of D-31
EWEkm
&CD
works in 8th km
of D-31
EWE
&CD
works in -

48,00,000

48,00,000

48,00,000

1,00,000

51,00,000

51,00,000

51,00,000

1,00,000

57,00,000

57,00,000

57,00,000

1,00,000

9th
of D-31
EWEkm
&CD
works in 10th km
ofworks
D-31 in EWE
&CD
11th
of works
D-31 in EWEkm
&CD

50,00,000

50,00,000

50,00,000

1,00,000

45,00,000

45,00,000

45,00,000

1,00,000

45,00,000

45,00,000

45,00,000

1,00,000

12th
ofworks inD- EWE km
&CD
13th
ofworks
D-31 in EWE km
&CD

45,00,000

45,00,000

45,00,000

1,00,000

45,00,000

45,00,000

45,00,000

1,00,000

14th km
ofworks in
D- EWE
&CD
15th
ofworks in
D- EWE km
&CD
16th km of
D-

40,00,000

40,00,000

40,00,000

1,00,000

40,00,000

40,00,000

40,00,000

1,00,000

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
192

293

193

294

194

295

195

296

196

297

197

298

198

299

199

300

200

301

201

302

202

303

203

304

204

305

205

306

206

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

EWE &CD works in 17th


ofworks in
D- EWE km
&CD
18th km
ofworksDEWE
&CD
in -

40,00,000

40,00,000

40,00,000

1,00,000

40,00,000

40,00,000

40,00,000

1,00,000

40,00,000

40,00,000

40,00,000

1,00,000

19th
ofworksDEWE km
&CD
in 20th km
ofworks DEWE
&CD
in 21st km
of works DEWE
&CD
in -

4,00,000

4,00,000

4,00,000

1,00,000

25

4,00,000

4,00,000

4,00,000

1,00,000

25

4,00,000

4,00,000

4,00,000

1,00,000

25

40,00,000

40,00,000

40,00,000

1,00,000

40,00,000

40,00,000

40,00,000

1,00,000

5,00,000

9,697

5,434

5,00,010

5,00,000

1,00,000

20

1,50,000

95

1,50,000

1,50,000

75,000

50

22nd &CD
km ofworks
D-31in EWE
23rd km
ofworks in EWE
&CD
24th
EWE km
andofformationD- 132/2011of embankment in 12,20-01-2012
2nd and 3rd km of
Minor No.4
of SD-1 62/2011-12,14Balance
C.C.Lining
from ch:925m to
11-2011
1000m of D-10A
Providing
C.C.Lining
Providing in 13th

20,00,000

20,00,000

20,00,000

10,00,000

50

20,00,000

20,00,000

20,00,000

10,00,000

50

C.C.Lining
Providing in 14th
C.C.Lining in 15th
Providing

20,00,000

20,00,000

20,00,000

10,00,000

50

CER
C.C.Lining in 1st km NO.96/2010of Jannenahalli
11,17-10-2011
Minor of D-24

30,00,000

22,677

20,51,025

10,340

22,03,546

30,00,000

15,00,000

50

307

Providing
CER
C.C.Lining in 6th km NO.95/2011of SD-2 under D-24 12,17-10-2011

47,11,964

29,587

2,47,764

49,89,315

30,00,000

15,00,000

50

207

308

20,00,000

20,00,000

10,00,000

50

309

Providing CC lining in
6th km of
Providing
CC lining 225/2011in 9th km SD-1 of D- 12,19-01-2012
26

20,00,000

208

51,99,414

50,586

50,586

51,99,414

20,00,000

10,00,000

50

209

310

Providing CC lining 224/2011in 10th km


12,19-01-2012
SD-1 of D-26

47,42,011

57,989

48,00,000

20,00,000

10,00,000

50

210

311

20,00,000

20,00,000

10,00,000

50

312

59,00,000

59,00,000

59,00,000

30,00,000

51

212

314

Providing CC lining in
11th kmCC lining Providing
from ch.9625m to
Providing
256/2011-

20,00,000

211

33,62,195

67,805

34,30,000

14,00,000

7,00,000

50

5,00,000

5,000

5,05,298

5,31,905

5,00,000

2,50,000

50

59,31,359

18,641

59,50,000

50,00,000

25,00,000

50

70/2011-12,2511-2011

3,00,000

9,659

15,750

3,00,000

3,00,000

1,50,000

50

Construction of
64,11-11-2011
CTC at ch:3450m in
Construction of
CTC @ ch:14445m

6,29,961

2,539

27,500

6,60,000

5,00,000

4,00,000

80

5,00,000

5,00,000

5,00,000

4,00,000

80

213

315

214

313

C.C.Lining in 3rd
12,14-02-2012
km of Embankment
portion of D-26
of 67/2011-12,21Construction
of Box
drain from ch:650m 11-2011
to 850m of D-10A2
under
TBC
Providing
677/2006-

317

C.C.Lining from
ch.9000 m to
9625m in 10th
Construction
of km

215

CTC @ ch.4350 m
in 5th km of D-18
216

318

217

319

1,40,184 B
142, 01-03Vishwan 2012
ath

21,607 P.G.Prab 153, 05-03hu


2012
prasad

2007,30-032007

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
218

320

219

321

220

322

221

323

222

324

223

325

224

326

Work Name

Sanction No.

Construction of
60-2011-12,14C.D.Works under
11-2011
Pendaranahalli
Minor of D-24
under
Providing
railings
to Road.Bridge
@ to 49/2011-12,29Providing railings
Road.Bridge @ ch: 10-2011
9675M in 10 th KM
of D-24.
Construction
of
47/2011-12,29C.T.C @ ch: 4600 10-2011
in 5th KM of SD-1
ofD-24.
Construction of
C.T.C
@ ch:7040
in 23/2011-12,07Construction
of foot
bridge @ch:1300m 10-2011
in 2nd km of
Jannenahalli Minor
Construction
of Inlet 32/2011-12,07@ ch:12700 in 13th 10-2011
KM of SD-2 of D-24.
Distributaries

Total

Detailed /
Estimated
Cost
4,50,000

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

8,977

3,30,707

8,35,000

2,00,000

7,026

5,00,000

10,166

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

0 P.R.Che 147, 05-03nnigappa 2012

3,39,684

4,50,000

2,25,000

50

8,35,000

5,00,000

2,50,000

50

2,00,000

2,00,000

1,00,000

50

9,416

3,75,000

5,00,000

2,50,000

50

5,00,000

5,00,000

5,00,000

4,50,000

90

3,00,000

845

3,06,823

10,120 chikkasw 100, 21-01amy


2012

3,06,690

11,098

3,00,000

1,50,000

50

5,00,000

11,901

4,89,630

17,468 K.Raman 101, 23-01na


2012

5,18,999

5,00,000

2,50,000

50

27,54,28,351

11,99,300

62,27,581

14,91,899 27,31,46,456 25,85,95,000

4,38,49,000

17

8,64,690

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Potential Works , General , FIC(CNNL) , New Constructions Fresh Works
225

364

226

365

227

366

228

367

229

230

231

232

Constn of FIC and


CD works
in FIC's
Constn
of FIC
and

14,72,000

14,72,000

14,72,000

14,72,000

100

15,89,000

15,89,000

15,89,000

15,89,000

100

155,10-022012
105/201112,27-12-2011

4,20,000

9,545

4,20,000

4,20,000

4,20,000

100

2,15,578

4,422

2,20,000

2,11,000

2,11,000

100

368

CD
works
in FIC's
Constn
of FIC
and
CD works in FIC's
Construction of
FIC's and C.D
Works in Block
No.1 & 2 at ch:40m
Construction
of

107/201112,27-12-2011

3,25,000

6,087

3,25,000

3,25,000

3,25,000

100

369

FIC's and C.D


Works in Block
No.3
& 4 at of
Construction

106/201112,27-12-2011

1,92,000

3,365

1,92,003

1,92,000

1,92,000

100

370

FIC's and C.D


Works in Block
No.5 at ch:1700m
Construction
of

156/201112,10-02-2012

3,10,000

3,02,000

3,10,000

3,10,000

100

371

FIC's and C.D


Works in Block
No.5 of SD-1of
Construction

157,10-022012
96/2011-12,2712-2011

4,75,263

237

4,75,500

4,72,000

4,72,000

100

1,11,000

2,562

1,11,000

1,11,000

1,11,000

100

97/2011-12,27and C.Dworks
12-2011
under Block No.3
at ch: 2750M of
of FIC
SD- 100/2011Construction
and C.Dworks
12,27-12-2011
under Block No.6
at
ch: 4850M of
of SDConstruction

1,65,000

3,264

1,65,000

1,65,000

1,65,000

100

1,21,000

2,557

1,20,693

0 K
127, 14-02Ramann 2012
a

1,23,250

1,21,000

1,21,000

100

2,12,000

1,97,994

1,97,994

2,12,000

2,12,000

100

1,91,000

3,563

1,90,998

0 T.H.
74, 10-020 IShivanna
Srinivas 2011
131, 17-02Reddy
2012

FIC's
and C.Dof FIC 98/11-12,27Construction
and C.Dworks
12-2011

1,94,561

1,91,000

1,91,000

100

233

372

234

373

235

376

236

377

237

374

FIC's and C.D


Construction of FIC
and C.Dworks
under Block No.1
and 2 at ch: 1875
Construction
of FIC

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

238

375

239

378

240

379

Construction of FIC 99/2011-12,27and C.Dworks


12-2011
under Block No.5
at ch: 4275M of
of SD- 102/2011Construction
FIC's and C.D
12,27-12-2011
Works in Block
No.10
at
Construction
of
103/2011-

380

FIC's and C.D


Works in Block
No.12 at
Construction
of

242

381

FIC's and C.D


Works from Block
No.13and
to 16
at
EWE
constn.,

243

382

241

of
CD works in
Construction
of
FIC's at Ch.
FIC(CNNL)

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

1,42,000

2,421

1,42,231

1,24,000

3,234

34,000

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

0 I Srinivas 132, 17-02Reddy


2012

1,44,652

1,42,000

1,42,000

100

1,24,000

1,24,000

1,24,000

100

236

34,000

34,000

34,000

100

3,16,000

8,777

3,16,000

3,16,000

3,16,000

100

9,49,000

9,49,000

9,49,000

9,49,000

100

14,00,000

14,00,000

14,00,000

14,00,000

100

Total

87,63,841

50,270

6,51,916

87,54,960

87,56,000

87,56,000

100

Remarks

12,27-12-2011
104/201112,27-12-2011

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Potential Works , General , Vehicles , New Constructions Fresh Works
244

335

245

336

246

337

247

338

248

339

AME of Jeep KA-o6 G-238


for the
Purchase
of year Mahindra Bulero LX Annual

3,50,000

2,32,740

1,17,260

3,50,000

3,50,000

100

7,03,000

6,08,158

94,842

7,03,000

7,03,000

100

3,00,000

3,00,000

2,48,023

3,51,977

3,00,000

3,00,000

100

maintenance
AME of Jeep of
pertaining of
to No.34, Purchase
Mahindra
Vehicles Bulero LX Total

2,50,000

2,50,000

1,26,281

3,73,719

2,50,000

2,50,000

100

7,03,000

6,10,203

92,797

7,03,000

7,03,000

100

23,06,000

5,50,000

18,25,405

10,30,595

23,06,000

23,06,000

100

Maintenance Expenditure-2701 , Major Irrigation , Hemavathy Canal , Operation & Maintenance(O & M) , General , Canals & Branches , Maintenance Fresh Works
249

504

Removal of slipped 28,27-07-2011


earth from 64800 to
64900m on SR side
of TBC

2,00,000

1,90,808

0 I.V.
28, 27-07Ramired 2011
dy

1,90,463

345

2,00,000

2,00,000

100 Emergent
nature of
work to be
taken up
during
closure
period of
2011-12

250

532

2,50,000

1,153

1,88,350

1,89,503

2,50,000

2,50,000

100 Estimate to
be prepared.

528

1,00,000

0 B
76, 18-11Channab 2011
asavapra
0 bhu

251

Construction of pipe 76/2011-12,18culvert d/s of canal 11-2011


syphon at
Ch.187350
of TBC Restoring sidelining
at Ch.137550 m of
138th km of TBC

1,00,000

1,00,000

1,00,000

100 Estimate to
be prepared.

252

522

Improvements to
embankment in
71st km of TBC

40,000

416

40,000

40,000

40,000

100 Estimate to
be prepared.

253

505

Removal of slipped 4,27-06-2011


earth from
ch:67000 to
67500m in 68th km
of TBC

2,00,000

99,668

99,509

159

2,00,000

2,00,000

100 Emergent
nature of
work to taken
up during
closure
period of
2011-12.

Canals &
Branches

7,90,000

1,569

4,78,826

2,89,972

3,30,007

7,90,000

7,90,000

100

61/2011-12,1411-2011

Total

0 P.L.
30, 27-07Ramakris 2011
hnaiah

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

Maintenance Expenditure-2701 , Major Irrigation , Hemavathy Canal , Operation & Maintenance(O & M) , General , Canals & Branches , Special Repairs Fresh Works
254

566

Special repairs to
embankment in
134th km of TBC

57/2011-12,3110-2011

3,00,000

275

255

563

2,00,000

7,714

2,17,686

256

564

5,00,000

1,598

257

565

Special repairs and 76/2011-12,25protection works


11-2011
and easening at exit
and entry
to CTC
Special
repairs
to at 56/2011-12,31embankment on I.P 10-2011
side of 135th km of
TBC
Special repair
-

3,00,000

561

works in 147and
148km of TBC and
repairs
head to
Special to
repairs

1,00,000

99,000

14,00,000

9,587

3,16,686

258

45,15-01-2012

canal from 138 to


140th km of TBC
Canals &
Branches

Total

3,00,000

3,00,000

3,00,000

100 Estimate to
be prepared.

2,16,355

9,045

2,00,000

2,00,000

100 Estimate to
be prepared.

4,90,000

5,00,000

5,00,000

100 Estimate to
be prepared.

3,00,000

3,00,000

3,00,000

100 Estimate to
be prepared.

0 K.B.RAJ 165, 06-03U


2012

99,000

1,00,000

1,00,000

100 Estimate to
be prepared.

2,16,355

11,98,045

14,00,000

14,00,000

0 M.N.Srik 114, 13-02antaiah 2012

100

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

Maintenance Expenditure-2701 , Major Irrigation , Hemavathy Canal , Operation & Maintenance(O & M) , General , Canals & Branches , Water Management Fresh Works
259

560

Water management DR No.


of PO at Ch.153800 50/2011-12,29in 154th km of TBC 10-2011

50,000

200

29,820

20,180

50,000

50,000

100 Estimate to
be prepared.

260

559

Water management DR NO.


of PO in 138th km 33/2011-12,07of TBC
10-2011

50,000

200

9,798

40,202

50,000

50,000

100 Estimate to
be prepared.

261

544

Water management of D-11

1,00,000

1,42,936

-42,936

1,00,000

1,00,000

100 Estimate to
be prepared.

262

540

1,00,000

89,844

10,156

1,00,000

1,00,000

100 Estimate to
be prepared.

263

539

1,50,000

1,31,032

18,968

1,00,000

1,00,000

100 Estimate to
be prepared.

264

538

Water management regulator cum


escape at
Ch.182875
m of
Water
management
of Regulator cum
Escape in 133rd
KM of T.B.C.
Water
management -

2,00,000

2,00,000

1,63,073

2,36,926

2,00,000

2,00,000

100 Estimate to
be prepared.

5,00,000

5,00,000

2,90,998

7,09,002

5,00,000

5,00,000

100 Estimate to
be prepared.

3,00,000

3,00,000

38,434

5,61,566

3,00,000

3,00,000

100 Estimate to
be prepared.

3,00,000

3,00,000

1,27,410

4,72,590

3,00,000

3,00,000

100 Estimate to
be prepared.

3,07,000
0
0
0
3,85,443
-78,443
3,07,000
3,07,000
of TBC from
Ch.63000 to 80000
m of TBC
Canals
& Coming Total
20,57,000
13,00,400
0
0
14,08,788
19,48,211
20,07,000
20,07,000
Branches Maintenance Expenditure-2701 , Major Irrigation , Hemavathy Canal , Operation & Maintenance(O & M) , General , Distributaries , Maintenance Fresh Works

100 Estimate to
be prepared.

265

537

266

536

267

535

268

534

of escape regulator
at Ch.77765 m of
TBC
Water management of km141 to 150,
km 176 to 180 of
TBC Coming
under Water
management
from km 132 to 137,
km 173 to 175 of
TBC Coming
under Water
management
from km 138 to 140,
km 166 to 172 and
km
181management
to 187 of
Water
-

269

503

270

502

Providing sluice
Gate for D.P.O @
ch: 3750, 4050,
5200 in 4th
Removal
of , 5th

501

Scoured earth in
10th KM of D-24 of
T.B.C.
Removal of

508

Scoured earth in
9th KM of D-24 of
T.B.C.
Providing pervious

271

272

15,01-06-2011

10/2011-12,27casing to damaged 06-2011


portion in SR of 6th
& 7th km of D-12

50,000

49,900

3,00,000

2,97,000

2,00,000

1,00,000

193

1,01,793

0 M.N.
13, 01-06Shrikanti 2011
ah

100

40,212

9,688

50,000

50,000

100 tender under


process

2,96,808

192

3,00,000

3,00,000

100 tender under


process

2,00,000

2,00,000

2,00,000

100 tender under


process

0 K.T.RAN 51/2011-12,
GASWA 29-07-2011
MY

1,01,986

1,00,000

1,00,000

100 Emergent
nature of
work to be
taken up
during
closure of
2011-12.

0 M.
108, 28-03Venktesh 2011

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

18/2011-11,0807-2011

273

506

Repairs to outlet at
Ch.137400 m of
TBC

274

513

Repairs to
embankment and
under tunnel in 6th
km of D-25A

275

512

Removal of slipped 65/2011-12,21earth in 6th to 7th


11-2011
km of SD-2 of D-24

276

511

277

278

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

50,000

450

1,50,000

1,44,315

60,000

50

Removal of slipped 605,27-07earth 0 km to 4th


2011
km of SD-1 of D-24

1,00,000

1,01,974

510

Protective work to 43,22-07-2011


DPC @ CH:2850m
in 3rd KM of D 24.

2,00,000

2,00,000

509

Repairs to pipe
aquaducts in 1st
and 2nd km of D11A under TBC

1,50,000

71,17-07-2011

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

49,039

1,411

50,000

50,000

100 Emergent
nature of
work to be
taken up
during
closure
period of
2011-12

1,34,366

9,949

1,50,000

1,50,000

100 Emergent
nature of
work to be
taken up
during
closure
period of
2011-12.

49,000

60,000

60,000

100 Emergent
nature of
work to be
taken up
during
closure
period of
2011-12.

0 I
27, 27-07Srinivasa 2011
reddy

1,01,974

1,00,000

1,00,000

100 Emergent
Nature of
work to be
taken up
during
closure
period of
2011-12.

1,99,977

0 M.Prade 43, 27-07ep


2011

1,98,975

2,01,002

2,00,000

2,00,000

100 Emergent
nature of
work to be
taken up
during
closure
period of
2011-12.

1,58,000

0 P.L.
30, 17-07Ramakris 2011
hnaih

1,25,186

32,814

1,50,000

1,50,000

100 Emergent
nature of
work to be
taken up
during
closure of
2011-12.

0 K.B.
52, 27-07Somashe 2011
kar

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

279

507

Removal of slipped 25,25-07-2011


earth in 1st & 2nd
km of D-11

2,00,000

1,67,554

0 H.V.
Nataraj

25, 25-072011

1,65,602

1,952

2,00,000

2,00,000

100 Emergent
nature of
work to be
taken up
during
closure
period of
2011-12.

280

514

Improvements to
47,29-07-2011
embankment 1st,
2nd, 3rd , 4th km of
D-18

2,00,000

1,99,975

0 Chickkas 47, 29-07wamy


2011

1,83,680

16,295

2,00,000

2,00,000

100 emergent
nature of
work to be
taken up
during
closure
period of
2011-12.

281

524

1,00,000

399

1,01,593

0 P.R.Che 161, 06-03nnigappa 2012

1,01,992

1,00,000

1,00,000

100 Estimate to
be prepared.

282

523

50,000

50,000

50,000

50,000

100 Estimate to
be prepared.

283

517

Removal of slipped 89/11-12,25earth at


11-2011
Veerannagudi
Minor
under
Removal
of slipped earth from
ch:12000 to
13550m
Removalof
ofD-11
slipped 65,16-07-2011

4,00,000

3,98,847

0 I.V.
58, 06-09Ramired 2011
dy

3,98,847

4,00,000

4,00,000

100 Emergent
nature of
work to be
taken up
during
closure
period of
2011-12

1,50,000

1,23,149

0 N.
44, 27-07Pradeep 2011

1,22,501

648

1,50,000

1,50,000

100 Emergent
nature of
work to be
taken up
during
closure
period of
2011-12.

earth in 7th,8th,9th
& 10 km of D-26

284

518

Removal of slipped 66,16-07-2011


earth in 1st km of L1 sub-distry. Of D26

285

519

Removal of slipped earth f in 1st km of


D-10A

50,000

50,000

50,000

50,000

100 Estimate to
be prepared.

286

520

50,000

50,000

50,000

50,000

100 Estimate to
be prepared.

287

521

Strengthing of
embankment from
ch:2300 to 2330m
of
D-11 of slipped Removal
earth f in 3rd km of
D-10A

50,000

50,000

50,000

50,000

100 Estimate to
be prepared.

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

288

515

Repairs to CTC at
Ch.5600 and
formation of bund
under D-25 A of
TBC

2,00,000

2,00,000

1,99,995

0 G.
Prakash

46, 29-072011

1,97,222

2,02,773

2,00,000

2,00,000

100 Emergent
nature of
work to be
taken up
during
closure
period of
2011-12.

289

516

Protection to
59,06-08-2011
embankment works
in Minor -1 of D-27A
of TBC

2,00,000

2,00,000

1,65,983

0 K.B.Bette 59, 06-09gowda


2011

1,65,184

2,00,799

2,00,000

2,00,000

100 Emergent
nature of
work to be
taken up
during
closure
period of
2011-12

290

529

1,00,000

4,129

97,789

0 Abusale
m

162, 17-032012

1,01,918

1,00,000

1,00,000

100 Estimate to
be prepared.

291

530

Removal of slipped 162,17-03earth and repairs to 2012


canal at Ch.5580 in
6th
km of of
D-27A
Removal
slipped 53/2011-12,14earth in 7th km of D- 11-2011
27A

1,00,000

1,090

49,839

0 Sridhar
biligi

148, 05-032012

50,929

1,00,000

1,00,000

100 Estimate to
be prepared.

292

531

Removal of slipped 52/2011-12,14earth in 8th km of D- 11-2011


27A

1,00,000

7,364

43,446

0 Abusaleh 52, 14-11aj


2011

50,810

1,00,000

1,00,000

100 Estimate to
be prepared.

293

526

90,000

50,000

90,000

90,000

100 Estimate to
be prepared.

294

527

Removal of slipped 19,08-07-2011


earth & cleaning all
vents of p.o in
distributory SD to
1
Improvements
135,20-01embankment in 1st 2012
and 2nd km of D-25

1,50,000

239

1,49,910

1,50,000

1,50,000

100 Estimate to
be prepared.

295

525

1,00,000

1,101

2,01,198

0 R
121, 02-02RAMAKR 2012
ISHNA

2,02,299

1,00,000

1,00,000

100 Estimate to
be prepared.

296

533

97,000

97,000

74,115

72,457

98,658

97,000

97,000

297

500

Removal of slipped 79/2011-12,18earth & cleaning all 11-2011


vents of p.o in
distributory of to
Improvements
66,09-12-2010
service road
excavation of side
drains andof
Removal

2,00,000

1,99,352

0 Chickkar 102, 18-03anganna 2011

1,98,502

850

2,00,000

2,00,000

100 tender under


process

499

Scoured earth in
8th KM of D-24 of
T.B.C.
Improvements to

64,09-12-2010

1,00,000

1,06,825

1,06,355

470

1,00,000

1,00,000

1,85,000

0 B.
104, 18-03Kanthara 2011
0

1,85,000

1,85,000

1,85,000

100 work under


progress
100 tender under
process

2,45,000

2,45,000

2,45,000

2,45,000

44,77,000

7,12,015

31,82,619

25,56,910

24,66,345

44,77,000

44,77,000

298
299

498

300

497

SR, Excavation of
Repairs to CD
works and drops
from 5000 to
10000m
of head
D 12 of
Repairs to

sluice gate and CD


works under
subdistributory
Distributaries of D Total

0 KT
20, 20-06Rangasw 2011
amy

Maintenance Expenditure-2701 , Major Irrigation , Hemavathy Canal , Operation & Maintenance(O & M) , General , Distributaries , Water Management Fresh Works

100 Tender under


process.

100 tender under


process
100

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

301

541

Water management of D-10A1

50,000

50,000

17,484

82,516

50,000

50,000

100 Estimate to
be prepared.

302

545

Water management of D-11A

75,000

16,462

58,538

75,000

75,000

100 Estimate to
be prepared.

303

546

Water management of D-12

2,00,000

2,00,000

1,80,156

2,19,844

2,00,000

2,00,000

100 Estimate to
be prepared.

304

547

Water management of D-13

1,00,000

92,806

7,194

1,00,000

1,00,000

100 Estimate to
be prepared.

305

548

Water management DR NO
of D-18
34/2011-12,0710-2011

50,000

50,000

50,000

68,394

81,606

50,000

50,000

100 Estimate to
be prepared.

306

549

Water management DR NO.


of D-19
35/2011-12,0710-2011

50,000

50,000

552

39,144

61,408

50,000

50,000

100 Estimate to
be prepared.

307

550

1,00,000

1,83,920

-83,920

1,00,000

1,00,000

100 Estimate to
be prepared.

308

551

Water management of D-24 from Km


1.00 to 10.00 KM
of
T.B.C.
Water
management of SD-1 under D24.

2,00,000

2,00,000

1,38,821

2,61,179

2,00,000

2,00,000

100 Estimate to
be prepared.

309

552

Water management of SD-2 under D24.

1,50,000

1,50,000

74,700

2,25,300

1,50,000

1,50,000

100 Estimate to
be prepared.

310

553

Water management DR NO.


of D-24 Km 10 to
38/2011-12,2918 km)
10-2011

50,000

1,000

50,000

50,000

50,000

100 Estimate to
be prepared.

311

554

Water management of D-25

50,000

50,000

72,114

27,886

50,000

50,000

100 Estimate to
be prepared.

312

555

50,000

50,000

67,709

32,290

50,000

50,000

313

556

1,55,000

1,29,492

18,508

1,55,000

1,55,000

100 Estimate to
be prepared
100 Estimate to
be prepared.

314

557

Water management of D-25A


Water management of D-26 and Head
Sluice 0 to 12 th
Km
of management
D-26. Water
of SD-1 of D-26

50,000

50,000

29,394

70,606

50,000

50,000

100 Estimate to
be prepared.

315

558

Water management DR
of D-27A head
NO.26/2011sluice
12,07-10-2011

50,000

213

39,760

10,240

50,000

50,000

100 Estimate to
be prepared.

316

543

Water management of D-10A

1,00,000

1,01,466

-1,466

1,00,000

1,00,000

100 Estimate to
be prepared.

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
317

542

Work Name

Sanction No.

Water management DR
of D-10A2
NO.30/201112,07-10-2011
Distributaries

Total

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

50,000

275

44,980

-14,980

50,000

50,000

15,30,000

8,51,488

50,552

12,96,802

11,06,749

15,30,000

15,30,000

% Grant

Remarks

100 Estimate to
be prepared.

100

Maintenance Expenditure-2701 , Major Irrigation , Hemavathy Canal , Operation & Maintenance(O & M) , General , Distributaries , Special Repairs Fresh Works
318

562

Special repairs to 108/2011embankment on


12,27-12-2011
down stream side of
head sluice of SD-1 Total
Distributaries

1,00,000

2,559

99,292

0 K.B.Raju 166, 06-032012

1,01,851

1,00,000

1,00,000

100 Estimate to
be prepared.

1,00,000

2,559

99,292

1,01,851

1,00,000

1,00,000

100

Maintenance Expenditure-2701 , Major Irrigation , Hemavathy Canal , Operation & Maintenance(O & M) , General , Distributaries , Annual Maintenance Expenditure Fresh Works
319

496

320

495

Repairs to head
sluice gate and
Removal of slipped 32,04-01-2010
earth in 1st km of
Distributaries
Total

62,000

63,507

34,000

35,168

96,000

98,675

0 B.N.Arun
kumar
0 B.N.Arun
kumar
0

33, 04-102010
32, 04-102010

63,216

291

62,000

62,000

34,446

722

34,000

34,000

97,662

1,013

96,000

96,000

100 work to be
started
100 work to be
started
100

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

Maintenance Expenditure-2701 , Major Irrigation , Hemavathy Canal , Operation & Maintenance(O & M) , General , Tanks , Maintenance Fresh Works
321

570

Removal of silt in
LBC & RBC of
Kadaba Tank

1,00,000

1,01,790

0 B.C.SHIV 81/2011-12,
AKUMAR 14-12-2011

1,01,790

1,00,000

1,00,000

100 Emergent
nature of
work to be
taken up
during
closure of
2011-12.

322

569

Removal of silt in
LBC & RBC of
Nittur M.I.Tank

8/2011-12,2706-2011

1,00,000

1,01,897

0 R.MALLE 69/2011-12,
SWARA 01-12-2011
REDDY

1,01,897

1,00,000

1,00,000

100 Emergent
nature of
work to be
taken during
closure of
2011-12.

323

568

Repairs to waste
weir of kempaiana
katte

2,40,000

2,40,000

2,40,000

2,40,000

100 Emergent
nature of
work to be
taken up
during
closure of
2011-12

324

575

Repair works of
22,14-07-2011
damaged P.O's of
Mannu Ane of
Kunigal Doddakere

1,00,000

71,917

0 G.Prakas 45, 27-07h


2011

71,917

1,00,000

1,00,000

100 Emergent
nature of
works to be
taken up
during
closure
period of
2011-12.

325

574

Repairs works of
damaged P.O's of
Nademavinapura
Ane under Kunigal
Doddakere

21,14-07-2011

1,00,000

1,00,000

81,938

0 k.b.Bette 75, 12-12gowda


2011

89,315

92,623

1,00,000

1,00,000

100 Emergent
nature of
works to be
taken up
during
closure
period of
2011-12.

326

571

Removal of silt in
Anicut channel of
Kadaba tank.

9,27-06-2011

1,00,000

1,00,000

1,01,666

0 k.s.shiva 86, 14-12kumar


2011

1,01,580

1,00,086

1,00,000

1,00,000

100 Emergent
nature of
work to be
taken up
during
closure
period of
2011-12

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

327

572

Repair works of
damaged P.O's &
Ramabana canal
under Kunigal
Doddakere

49,29-07-2011

1,00,000

1,03,349

0 K.
49, 29-07Jagades 2011
h

1,03,349

1,00,000

1,00,000

100 Emergent
nature of
work to be
taken up
during
closure
period of
2011-12.

328

573

Repairs works of
19,14-07-2011
damaged P.O's of
Lakshmi devi canal
under Kunigal
Doddakere

1,00,000

1,07,693

0 B.T.Rang 64, 16-11aswamy 2011

1,07,496

197

1,00,000

1,00,000

Tanks

9,40,000

2,00,000

6,70,250

5,75,447

5,34,803

9,40,000

9,40,000

100 Emergent
nature of
works to be
taken up
during
closure
period for
100 2011-12.

Total

Maintenance Expenditure-2701 , Major Irrigation , Hemavathy Canal , Operation & Maintenance(O & M) , General , Tanks , Water Management Fresh Works
329

577

330

576

331

578

332

579

Water management of Ramabana


Water
management of Kadaba, Nittur,
Belavatha, K.Ram
pura,
WaterVeerasagara,
management of Kothagere
,Gunnagara,
Kantanahalli
Tanks Water management
of
Kempaiahanakatte
Coming under the Total
Tanks

2,00,000

2,00,000

1,95,914

2,04,086

2,00,000

75,000

4,00,000

4,00,000

2,22,551

5,77,448

4,00,000

1,81,000

38

1,50,000

1,50,000

1,50,000

40,000

27 Estimate to
be prepared.

50,000

50,000

50,000

20,000

40 Estimate to
be prepared.

8,00,000

6,00,000

4,18,465

9,81,534

8,00,000

3,16,000

45 Estimate to
be submitted.

40

Maintenance Expenditure-2701 , Major Irrigation , Hemavathy Canal , Operation & Maintenance(O & M) , General , Tanks , Repairs Fresh Works
333

580

Special repairs
75,18-11-2011
Providing
reventment,repairs
to
acquduct and its Total
Tanks

4,50,000

50,000

3,79,266

0 P.L.Ram 117, 13-02akrishnai 2012


ah

19,880

4,09,386

4,50,000

4,50,000

100 Estimate to
be prepared

4,50,000

50,000

3,79,266

19,880

4,09,386

4,50,000

4,50,000

100

Maintenance Expenditure-2701 , Major Irrigation , Hemavathy Canal , Other Capital Works , General , Buildings , Colony Maintenance Fresh Works
334

581

AME of H.C.I.
Colony at Hebbur

8,00,000

6,91,315

1,08,685

8,00,000

5,00,000

62 Estimate tobe
prepared

335

582

5,00,000

5,42,188

-42,188

5,00,000

3,50,000

70 Estimate to
be prepared

336

583

Maintenance of
colony and
buildings
(residential
and
AME of no 14

3,00,000

3,00,000

2,57,300

3,42,700

3,00,000

1,50,000

50 Estimate tobe
prepared

16,00,000

3,00,000

14,90,803

4,09,197

16,00,000

10,00,000

HCSD, Kunigal
office and colony for
the year
Buildings
Total

Roads (Maintenance)-3054 , Major Irrigation , Hemavathy Canal , Other Capital Works , General , Roads , New Constructions Fresh Works

62

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
337

618

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

Improvements to
service road in 3rd
and 4th km of
Nademavinapura
ane channel under
Kunigal doddakere

5,00,000

5,00,000

5,00,000

3,00,000

60 work is
approved by
M.D ,cnnl,
Blore vide
Letter No.
cnnl/tech2/291/201112
Dated 22-092011

Roads

Total

5,00,000

5,00,000

5,00,000

3,00,000

60

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Capital Works , General , Buildings , Improvements Spill Over
338 335

420

Repairs and
Improvements to
No.3, HCI SubDivision,
Buildings

203/201011,08-03-2011

2,05,000

10,000

1,99,990

0 Chikkasw 48/2011-12,
amy
29-07-2011

2,09,990

2,15,000

2,15,000

100

Total

2,05,000

10,000

1,99,990

2,09,990

2,15,000

2,15,000

100

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Capital Works , General , Pick ups , New Constructions Spill Over
339 285

399

340 283

387

341 284a

398

construction of pick 60/2010-11,01up cum cause


12-2010
wayacross Benachi
gere katte under
Construction
of
124/08-09 25Pickup cum
02-09,25-02causeway across
2009
shimsha riverof
Construction
CER No
Pickup Cum Cause
way Across waste
weir Halla of
Sampige
Pick
ups Tank

9,00,000

2,954

3,89,729

91,25,000

26,108

70,29,546

3,79,612

13,071

3,82,954

25,000

0 B.S.Asho 136/2009-10,
k
02-02-2010

60,70,017

9,85,637

30,54,983

25,000

97,30,000

887

1,26,73,922

0 S.N.Pras 12/07-08, 30ad


04-2007

92,00,605

34,74,204

34,74,204

50,000

1,97,55,000

29,949

2,00,93,197

1,56,50,234

44,72,912

69,12,141

1,00,000

632/06-07
30-3-07,30-032007
Total

0 p.g.prabh 57, 18-08uprasad 2011

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Capital Works , General , Roads , New Constructions Spill Over
342 304

402

343 308

404

344 309(A)

403

345 310

400

346 311

401

Improvement of
road from Kodi
Palya Railway Gate
to Veerasagara
Badena Halli
Formation
of

SER No.38/0708
30-11-07,3011-2007

4,25,000

4,300

3,41,843

0 Krishneg 73/2008-09,
owda
05-03-2012

CER 638 /06atchkat road from


07 30.3.07,30Lakshmidevi
03-2007
channel to
Chikkakere
Formation ofatchkat
road 95/09-10,23and constn. Of
12-2009
Construction of
314/2006cause way for
07,30-11-2006
Gunnagara waste
weir halla near
Construction
of
53/2010-11,01-

2,38,000

28,025

2,38,572

15,00,000

18,41,059

12,10,000

7,045

66,90,000

1,00,63,000

39,370

RCC box type


12-2010
cause way across
the
waste weir halla Total
Roads

3,46,143

4,25,000

1,70,000

40

0 B.N.Arun 133/2009-10,
kumar
08-01-2010

90,000

1,76,597

1,76,597

55,000

31

0 P.L.Ram 77/10-11, 10akrishnai 02-2011


0

13,50,083

4,90,976

18,41,059

7,36,000

40

12,10,000

12,10,000

4,84,000

40

52,69,128

0 TH
4, 20-04-2011
Venkatac
hala

52,46,319

22,809

66,90,000

20,59,035

31

76,90,602

66,86,402

22,46,525

1,03,42,656

35,04,035

34

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Capital Works , General , Tanks , Restoration Spill Over
347 315

428

Restoration of Kada 79/2010-11,13setty halli Tank in 12-2010


Gubbi Taluk

4,75,000

40,000

4,99,528

0 K.R.
11, 23-05Rangasw 2011
amy

348 316

430

Restoration of
CER
Sampige hosa halli NO.210/10Tank in Turuvekere 11,31-03-2011
Taluk

10,00,000

12,70,168

349 317

436

435

Improvements to
Kothagere tank.
Improvements
to

5,00,000

350 318

25,50,000

Gunnagara Tank.

4,40,192

99,336

5,15,000

1,85,000

36

0 I.V.Ramir 115, 13-02eddy


2012

12,70,168

10,00,000

7,80,000

78

5,00,000

5,00,000

84,000

17

25,50,000

25,50,000

10,65,000

42

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

351 313

426

Restoration of
CER
Aremaranahalli
NO.115/08-09
Tank in Gubbi Taluk Dt.18.2.09,1802-2009

43,00,000

13,617

21,59,597

0 C.Varadh 73/2009-10,
araju
04-11-2009

21,08,972

64,242

42,39,510

8,42,000

20

352 314

429

Restoration of
SER No.73
Adagondanahalli
/08-09
Tank in Gubbi Taluk Dt.20.2.09,2002-2009

5,41,386

18,612

5,60,000

0 R.Govind 15/2009-10,
08-07-2009

4,65,020

1,13,592

1,13,592

10,000

353 315a

427

Restoration of
SER No.01/09K.Rampura Tank in 10
Gubbi Taluk
Dt.08.6.09,0806-2009

6,67,000

9,827

6,57,279

0 K.N.Bala 122/2009-10,
krishna 07-01-2010

6,57,279

9,827

1,47,659

54,000

37

354 320

437

96,00,000

96,00,000

23,73,000

25

434

Restoration and
Rejuvenationand
of
Restoration

355 321

21,64,767

35,89,282

14,20,000

40

356 322

433

Rejuvenation of
Kunigal Chikkakere
tank
Restoration of

0 C.VARA 68/2011-12,
DARAJU 01-12-2011
0

5,65,000

5,65,000

2,20,000

39

357 323

431

0 C.
73, 18-02Varadara 2009
ju

21,59,597

14,60,000

5,70,000

39

358 324

432

6,60,000

6,60,000

2,57,000

39

36,71,463

1,97,56,529

2,49,40,043

78,60,000

32

96,00,000

199/201011,08-03-2011

35,70,000

19,282

21,45,485

5,65,000

Bennur
Tank
Restoration
of in
Belavatha Tank in
Gubbi Taluk

CER
NO.208/1011,31-03-2011

14,60,000

21,59,597

Restoration of
Ammanahalli Tank
in Gubbi Taluk

SER
NO.165/201011,31-03-2011

6,60,000

Tanks

Total

2,58,88,386

1,01,338

94,51,654

, 03-12-2010

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Capital Works , General , Tanks , Maintenance Spill Over
359 401

424

Extennsion of guide 207,31-03wall to waste weir


2011
Tanks
Total

10,00,000

6,57,000

10,00,000

6,57,000

0 B.vihwan 70, 01-12ath


2011
0

6,46,350

10,650

10,00,000

4,00,000

40

6,46,350

10,650

10,00,000

4,00,000

40

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Capital Works , SDP , Tanks , Restoration Spill Over
360 325

439a

361 319

440a

Restoration of
Verasagara Tank
Improvements to
Kantanahalli
Tank.
Tanks

83/10-11,1403-2011
Total

3,80,000

2,000

3,80,000

32,90,779

94,221

36,70,779

96,221

3,80,000

0 P.L.rama 631, 06-11krishnaia 2011


0

2,67,487

1,14,513

3,82,000

3,80,000

99

33,85,000

33,85,000

18,20,000

54

2,67,487

34,99,513

37,67,000

22,00,000

58

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Special Programs , SCP , Pick ups , New Constructions Spill Over
362 292

446

363 294

447

364 286

441

Construction of
pickup in Sy.No.73
of Madikehally in
Kothagere Hobli,
Kunigal
Taluk.of
Construction

DR No. 97/0809 dated


16.02.09,1602-2009

5,00,000

1,905

2,87,114

0 Chikkasw 145/2009-10,
amy
28-01-2010

2,86,705

2,314

2,87,114

2,87,000

100

DR No. 88/08pickup in Sy.No.118 09


of Hullenahally in
16.02.09,16Tumkur taluk
02-2009

4,00,000

27,277

4,00,000

0 Chikkasw 144/2009-10,
amy
28-01-2010

4,00,000

27,277

4,27,277

1,90,000

44

Construction of
pickup in sy.no.
34/24of
Thogarighatta

53/08-09 0711-09,07-112009

3,78,000

427

2,25,264

0 B.H.Jayr 50/2009-10,
am
24-08-2009

1,62,123

63,568

2,13,877

75,000

35

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
365 287

442

366 288

443

367 290

445

368 291

444

Work Name

Construction of
pickup in sy.no. 249
of Bittagondanahalli
halli village in of
gubbi
Construction

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

54/08-09 0711-09,07-112009

2,49,000

395

1,55,195

0 Nayana 167/2009-10,
manohar 10-03-2010

1,36,250

19,340

2,49,000

1,56,000

63

81/08-09 15pickup in sy.no.


01-09,15-0132/4 of Dasarakalla 2009
halli
halli village
Construction
of in 77/08-09 15pickup in sy.no.
01-09,15-0198of Kommanahalli 2009
halli village in of
gubbi 80/08-09 15Construction

3,80,000

2,42,057

0 R.Govind 38/2009-10,
11-08-2009

2,11,987

30,070

1,68,013

75,000

45

3,90,000

7,686

3,90,000

0 B.H.Jaya 49/2009-10,
ram
24-08-2009

3,71,380

26,306

26,306

60,000

228

4,50,000

3,622

2,85,328

0 R.Govind 37/2009-10,
11-08-2009

2,88,950

4,50,000

2,85,000

63

27,47,000

41,312

19,84,958

15,68,445

4,57,825

18,21,587

11,28,000

62

pickup in sy.no. 39 01-09,15-01of Kurubarahalli


2009
halli village
Pick
ups in gubbi Total

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Other Special Programs , TSP , Pick ups , New Constructions Spill Over
369 297

452

370 301

453

Construction of
pickup in sy.no.
100of
Bittagondanahalli
Construction of

55/08-09 0711-08,07-112008

62/2010-11,01pickup in sy.no.
12-2010
36/P12 of
Kenchanahalli
halli Total
Pick ups

2,63,000

320

1,55,195

0 Nayana 166/2009-10,
manohar 10-03-2010

1,38,786

16,729

2,63,000

1,58,000

60

10,00,000

2,000

3,78,881

0 P.L.
24, 08-07Ramakris 2011
hnaih

3,78,881

2,000

3,70,000

3,70,000

100

12,63,000

2,320

5,34,076

5,17,667

18,729

6,33,000

5,28,000

83

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Potential Works , General , Canals & Branches , New Constructions Spill Over
371 57A

11

372 58

36

373 59

35

374 60

37

375 61

38

376 62

39

377 63f

40

378 64

41

379 2

380 3

381 5

Surveying of
alignment from ch.
221000m to
240000m of TBC.
Construction
of cut

27/2010-11,1111-2010

3,00,000

12,000

213/2010and cover type RB 11,31-03-2011


at Ch.189675 m in
190th km of TBC
Construction
of foot 59/2010-11,01bridge at 187350 m 12-2010
in 188th km of TBC

69,95,340

14,660

48,09,049

5,00,000

3,000

4,96,562

Construction of CD 214,31-03works in 196th km 2011


Construction of CD
works
in 198th
Construction
ofkm
CD 216,31-03works in 199th km 2011
Construction of CD 219,31-03works in 200th km 2011
Construction of
81/2010-11,01sluice crossing in
12-2010
194th km of TBC

99,50,000

83,94,791

96,30,000

82,90,899

73,05,249

44,751

59,12,008

50,00,000

87,85,073

4,90,000

10,000

5,60,860

Earthwork
CER No.
excavation in 189th 192/05-06,17km of TBC
12-2006

99,10,000

1,99,419

99,10,000

EWE in 190th KM
of TBC

98,95,000

2,15,324

1,26,74,000

Earthwork
CER No.
excavation in 194th 195/07-08
km of TBC
14.01.08,1401-2008

49,99,000

62,543

30,12,000

CER No.
428/06-07,0801-2007

1,21,550

1,78,450

3,00,000

60,000

20

71, 07-122011

11,418

48,12,291

41,88,582

20,00,000

48

0 M.N.srika 12, 01-06ntaiah.


2011

4,99,562

3,81,000

2,00,000

52

0 N.b.jayar
am
0 n.b.jayar
0 am
J.T.Ajuy

66, 28-112011
67/2011-12,
28-11-2011
72, 07-12-

83,94,791

99,50,000

25,00,000

25

82,90,899

99,99,000

25,00,000

25

59,56,759

73,50,000

20,00,000

27

Gowda
0 A.H.Para
mashivai
0 K.B. Raju

2011
62, 04-112011
23, 20-062011

80,64,424

7,20,649

50,00,000

29,16,000

58

5,56,427

14,433

5,00,000

2,00,000

40

0 K.Sidda
Reddy

82/05-06, 1703-2006

69,79,588

31,29,831

31,29,831

11,72,000

37

3,190

1,28,86,134

1,28,89,324

50,70,000

39

22,87,543

7,87,000

6,43,930

3,22,000

50

0 J.T.Ajuy
Gowda

0 P.K.Shiv 223/07-08, 14aram


03-2008
0 Ashok
B.S.

74/08-09, 2810-2008

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

382 12

12

Providing CC Lining CER 81/95from Ch:64000 to


96,31-03-1996
65000m of TBC

28,27,000

2,000

28,27,000

0 A.B.Shiv 32/03-04, 20a kumar 06-2004

28,29,000

28,29,000

8,48,000

30

383 13

13

CER
408/07-08,1605-2008

16,70,000

5,000

13,93,000

0 NS
84/08-09, 22Niranjan 12-2008

9,782

13,88,218

16,60,218

4,15,000

25

384 14

14

Providing CC Lining
from Ch:65000 to
66000m of TBC
Balance
Providingwork
CC Lining

CER 83/9495,18-03-1995

70,00,000

20,000

92,00,000

0 D
Nagaraj

75,00,000

17,20,000

17,20,000

6,80,000

40

CER No: 131


08-09
04-03-09,0403-2009

33,25,000

2,98,337

35,24,399

0 B.S.Asho 140/09-10, 28k


01-2010

35,23,624

2,99,112

2,99,112

3,000

CER 214/04in 141st km of TBC 05 30.3.05,3003-2005

92,16,000

2,22,595

92,16,890

0 G.S.Ram 70/06-07, 27a krishna 12-2006

72,05,852

22,33,633

22,33,633

3,72,000

17

from Ch:65000 to
66000m of TBC
Providing U.C.R.
Masonry to canal
slope in 136th km
of TBC ( From Ch:
135000M CC
to lining
Providing

3/98-99, 2804-1998

385 16

15

386 17

16

387 18

17

Providing CC lining CER No. 268/


in 144th km of TBC 04-05
31.3.05,31-032005

74,25,255

3,54,745

78,33,650

0 S.
52/05-06, 06Madhava 01-2006
Reddy

54,96,000

26,92,395

26,92,395

4,00,000

15

388 21

20

CER No.
13/05-06,0407-2005

99,10,000

3,98,540

99,71,471

0 Venugop 38/05-06, 02al.S


01-2006

74,44,059

29,25,952

29,25,952

10,11,000

35

389 22

22

Providing CC lining
from 165000m to
166000m in 166th
km of TBCCC lining
Providing

CER No.
in 168th KM of TBC 14/05-06,0407-2005

1,29,45,000

1,05,460

1,30,20,000

0 M.B.Nan 30/05-06, 09dish


12-2005

1,19,06,000

12,19,460

12,19,460

49,000

390 23

21

56,20,000

3,18,798

52,95,762

29,74,971

26,56,173

11,72,000

44

23

54,25,000

2,60,065

55,15,984

0 K.Sidda 16/04-05, 12Reddy


07-2004
0 C.Obaiah
46/04-05, 0511-2004

26,39,589

391 24

50,20,183

7,55,866

7,55,866

1,98,000

26

392 28

24

4,95,000

2,000

4,95,000

0 Siddaraja 99/10-11, 18ppa


03-2011

4,94,499

2,501

4,97,000

1,62,000

33

393 30

26

88,07,663

2,05,484

1,85,840

60,000

32

394 31

27

1,03,87,120

-3,85,430

6,01,690

2,36,000

39

395 44

28

396 4

Providing CC lining
from 170000m
to
Providing
CC lining
CER No. 201/
in 175th km of TBC 03-04
23-03-04,2303-2004
Construction of
guidewall at
ch69975 m under
TBC
Const.of Regulator

"DR 178/0708,20-03-2008

CER No.
Cum Escape @ ch: 38/01-02
132775M in 133rd 30-03-02,30KM of TBC.
03-2002

80,00,000

1,37,016

88,76,131

0 K.J.Vish 50/02-03 , 04wa nath 09-2002


/K.T.Shiv
anna

Construction of
RCC box type SP
@ Ch.131525m
and 131576m in
132nd
km of TBC
Construction
of cut

CER No.
301/06-07
30.11.06,3011-2006

80,00,000

11,416

99,90,274

0 M.B.Nan 8/07-08, 25dish


05-2007

67,90,000

74,43,000

0 M.N.Loke 31/07-08, 23sh


07-2007

70,43,000

4,00,000

4,00,000

1,60,000

40

33,00,000

86,142

16,91,842

0 P.Shivap 74/2009-10,
rasad
04-11-2009
reddy

12,60,360

5,17,624

4,31,482

1,72,000

40

CER No.
and cover duct type 369/06-07,23road bridge @
12-2006
Ch.167319m in
Earthwork
CER No.01/09excavation and
10,03-06-2009
formation of
embankment in
191st km of TBC

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

397 6

398 7

Earthwork
excavation and
formation of
embankment in
195th km of TBC
Earthwork

excavation and
formation of
embankment in
196th km of TBC
Earthwork

excavation and
formation of
embankment in
Earthwork

excavation and
formation of
embankment in
198th
km of TBC
Earthwork

10

excavation and
formation of
embankment
in
Earthwork

18

excavation and
formation of
embankment of
in
Construction

19

retaining wall from


ch:143100m to
143325m
in 144th
Restoration
of

399 8

400 9

401 10

402 11

403 19

404 20

slipped lining in
147th km of TBC

Sanction No.

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

CER
N.;02/200910,26-06-2009

40,00,000

1,06,959

25,50,000

0 Vijayram 38, 03-122010

22,28,954

4,28,005

40,76,701

10,08,000

25

CER
NO;30/200910,02-11-2009

71,25,000

1,40,384

72,87,000

0 C.Y.Chel 150/2009-10,
uvegowd 25-02-2010
a

59,84,130

14,43,254

44,14,104

17,10,000

39

26/2009-10,1610-2009

64,50,000

1,58,603

65,77,000

0 P.K.Shiv 149/09-10, 25aram


02-2010

64,01,938

3,33,665

3,52,581

1,20,000

34

CER no
63/2009-10,0202-2010

46,75,000

1,13,000

25,27,552

0 B.C.
Prakash

26,40,552

47,88,000

11,16,000

23

CER.NO;64/2
009-10 ,02-022010

37,75,000

94,207

23,00,000

23,94,207

38,69,207

15,10,000

39

62/2009-10,0202-2010

81,00,000

1,67,020

44,00,000

0 Chaluve
gowda

90,195

44,76,825

80,99,184

23,19,000

29

17/2009-10,0710-2009

94,50,000

13,215

71,82,770

0 I.Chenna 163/2009-10,
krishnare 10-03-2010
ddy

37,66,720

34,29,265

34,16,050

14,34,000

42

52/2009-10,2501-2010

4,00,000

24,086

3,92,814

0 K.B.RAJ 23/2010-11,
U
05-07-2010

925

4,15,975

4,15,975

1,57,000

38

2,45,000

2,611

1,73,764

0 NS
41/2010-11,
Niranjan 03-12-2010

1,76,375

2,45,000

70,000

29

21/09-10,1610-2009
18/2009-10,1510-2010

45,50,000

45,290

33,92,019

15,32,500

19,04,809

18,59,519

7,44,000

40

77,00,000

1,65,633

86,92,000

9,000

88,48,633

88,48,633

20,69,000

23

18/2009-10,1510-2009

48,25,000

5,33,060

405 29

25

Construction of inlet 83/2009-10,11at ch 76950m of


03-2010
TBC

406 34

29

407 35

30

408 36

31

Construction of CD
works in 189th km
Construction of cut
and cover type CTC
189130 and earth
work from chainage
Construction
of CD
works in 190th km
of TBC

Detailed /
Estimated
Cost

37, 03-122010

111, 11-062011

0 N
Narasimh
0 P.K.Shiv
aram

131/09-10, 0801-2010
146/2009-10,
20-02-2010

39,60,000

162/2009-10,
10-03-2010

44,93,060

48,25,000

15,84,000

33

409 37

32

Construction of CD CER
works in 191st km NO;23/2009of TBC
10,16-10-2008

50,00,000

40,074

37,71,212

0 A.H.Para 118/2009-10,
mashivai 24-12-2009
ah

30,31,000

7,80,286

7,40,212

2,96,000

40

410 38

33

Construction of CD CER
works in 192nd km NO;24/2009of TBC
10,16-10-2009

38,75,000

32,574

33,30,350

0 T.C.Basa 138/2009-10,
varaju
28-01-2010

31,43,428

2,19,496

1,86,922

64,000

34

411 40

34

Construction of CD 25/09-10,1654,00,000
33,938
42,00,951
0 S.Rames 132/09-10, 0840,95,631
1,39,258
1,05,320
40,000
works in 194th km 10-2009
h reddy 01-2010
Canals &
Total
23,24,92,844
44,54,465 21,98,77,077
0
12,70,46,292 9,75,73,250 12,16,81,896 3,91,19,000
Branches
Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Potential Works , General , Distributaries , New Constructions Spill Over

38
32

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
412 248

79

413 249

80

414 250

87

415 252

146

416 253

147

417 254

148

418 258

155

Work Name

Sanction No.

Balance EWE And 64/2010-11,01construction of CD 12-2010


works In water
course under
Balance
EWE from 63/2010-11,01ch:775m to 900m in 12-2010
1st km of Thyagatur
minor
under D-13
Strengthening
61/2010-11,01ofembankment from 12-2010
ch:12075m to
12150m
EWE
andunder D- construction
EWE
and of CD

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

5,00,000

3,500

4,33,945

0 K.T.Rang 8, 04-05-2011
aswamy

4,28,668

8,777

4,23,500

1,68,000

40

2,00,000

1,000

2,00,000

0 K.T.R.sw 96/10-11, 18amy


03-2011

1,95,990

5,010

2,01,000

80,000

40

3,00,000

9,000

2,41,000

0 I.V.Rami 10, 20-05Reddy


2011

2,23,593

26,407

2,50,000

1,00,000

40

5,00,000

5,00,000

5,00,000

4,74,000

95

15,40,000

15,40,000

15,40,000

6,16,000

40

57,00,000

57,00,000

57,00,000

22,80,000

40

5,00,000

2,281

5,02,281

5,02,281

2,00,000

40

29,40,000

23,987

28,70,550

0 K.Raman 98, 21-01na


2012

28,94,537

29,40,000

11,76,000

40

Providing
57/2010-11,01C.C.Lining from ch: 12-2010
3280m to 3380 and
Ch:
3700 to
Providing
CC4000m
Lining 58/2010-11,01in 5th KM of SD-1 12-2010
of D-24.

20,40,000

15,735

22,73,133

0 K
16, 09-06Ramann 2011
a

11,33,094

11,55,774

20,40,000

8,16,000

40

29,30,000

21,016

28,42,122

0 H.
1, 02-04-2011
Byrappa

28,42,122

21,016

29,30,000

11,72,000

40

construction
EWE and of CD
construction of CD
Providing
C.C.lining for extra
Providing
C.C.Lining in 3rd
km of SD-1 of D-24

82/10-11,1403-2011
56/2010-11,0112-2010

419 260

162

420 261

163

421 262

164

422 263

165

Providing CC Lining 59/2010-11,01in 6th KM of SD-1 12-2010


of D-24.

26,55,000

18,891

22,73,133

0 K
16, 09-06Ramann 2011
a

22,67,064

24,960

26,55,000

10,60,000

40

423 264

166

Providing CC Lining 60/2010-11,01in 7th KM of SD-1 12-2010


of D-24.

25,10,000

28,290

23,81,620

0 K.Raman 97, 21-01na


2012

24,09,910

25,10,000

10,04,000

40

424 265

177

1,57,527

1,57,527

2,18,000

87,000

40

5,00,000

46,000

5,03,911

0 D
KANTAR
0 B.N.Arun
kumar

42

80/10-11,1312-2010
17/2010-11,0211-2010

2,18,000

425 266

4,99,092

50,819

3,84,292

1,35,000

35

426 267

43

Construction of box
drain from ch900
Construction of
CTC at Ch.75 m,
450m in minor
offtaking at of
Construction

18/2010-11,0211-2010

5,00,000

51,000

5,05,274

0 B.N.Arun 91/10-11, 28kumar


02-2011

4,99,743

56,531

2,66,148

88,000

33

427 269

44

PO's at Ch.150,
300 and 425m in
minor
offtaking
Construction
of at

5,00,000

46,000

5,00,000

0 V.NAGA 67, 10-02RAJ


2011

4,99,708

46,292

4,63,490

1,68,000

36

428 270

45

5,00,000

52,000

5,03,306

0 V.NAGA 66, 10-02RAJ


2011

4,99,734

55,572

1,80,190

53,000

29

429 257

153

D.R. NO ;
guide wall from
20/2010-11,02Chainage 925 to
11-2010
975 m and
construction
Construction of
of CTC D.R. NO ;
CTC @
21/2010-11,02ch:1200,1300 and 11-2010
P.O's in minor
offtaking
Providingat
54/2010-11,01-

77,95,000

26,862

59,12,485

59,07,863

31,484

77,95,000

23,65,000

30

161

C.C.Lining in 2nd
km of D-24 under
TBC
Providing

25,10,000

26,659

25,10,000

25,10,000

10,04,000

40

430 258a

12-2010

55/2010-11,01C.C.Lining in 2nd
12-2010
km of SD-1 of D-24

80, 13-122010
90/10-11, 2802-2011

0 T.H.
7, 04-05-2011
Venkatac
halla
0

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

431 271

180

Construction of inlet 87/2009-10,29at ch 17795m of D- 03-2010


24 Of TBC

3,75,000

3,037

2,23,240

432 275

191

48/2009-10,2801-2010

4,64,000

1,486

4,51,359

433 276a

194

Construction of
head sluice at ch
195250m of TBC
for
D-28B3 of
Construction

49/2009-10,2501-2010

4,35,000

4,28,808

0 B.T.Rang 43/2010-11,
aswamy 03-12-2010

434 63

76

head sluice at ch
197260m of TBC
for D-28B4
Earth
excavation

6,95,000

5,000

6,97,000

435 64

77

7,00,000

2,187

7,18,000

436 65

78

11/2004-05,16and construction of 11-2005


CD works from 0 to
1000 mtr
of D10A2 22/2006-07,01Earth
excavation
and construction of 09-2006
CD works at1st Km
of
D10A2
Veera
Earth
excavation
CER 103/08-

11,25,000

3,119

11,25,000

5,65,000

29,162

5,00,000

5,50,000

5,000

6,10,000

437 96

81

438 97

82

439 101

83

440 103

84

441 104

85

442 105

86

443 200

192

444 72a

89

and construction of 09 12-01CD works Under


09,12-01-2009
water course
offtaking
atch
90m of SER 119/98EWE from
11000 m to 12000m 99,18-12-1998
under D-24 of TBC.
EWE from ch
SER 118/98101600 m to
99,11-03-1999
11000m under D-24
of TBC.
Construction
of
83/2006-07,20canal culvert at
10-2006
ch:2430M of
Dasarakallahalli
Earth excavation
72/2004-05,21and construction of 10-2004
CD works at1st Km
of
Dasarakallahalli
Earth
excavation
33/04-05 20and construction of 12-04,20-12CD works at 3rd Km 2004
of Dasarakallahalli
Earth
excavation
20/04-05 20and construction of 11-04,20-11CD works at 4th Km 2004
of Dasarakallahalli
Earth
excavation
"62/06-07 21and construction of 04-07,21-04CD works to
2007
Yadavanahalli
water CER No.
EWE and

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

2,26,277

2,78,000

1,12,000

40

4,49,480

3,365

4,64,000

1,81,000

39

4,28,808

4,35,000

1,72,000

40

0 G.S.Ravi "50/05-06, 15shankar 11-2005

6,00,000

1,02,000

1,02,000

20,000

20

0 P.G.Prab 112/06-07, 28hu


12-2006
prasad

6,05,000

1,15,187

1,15,187

45,000

39

21,060

11,07,059

11,07,059

4,42,000

40

0 N.T.Nanj 50/99-00, 28unda


03-2000
swamy

4,00,000

1,29,162

1,65,000

40,000

24

4,50,000

0 N.T.Nanj 49/99-00, 27unda


03-2000
swamy

3,50,000

1,05,000

2,00,000

40,000

20

17,330

6,08,586

0 P.G.Prab 206/06-07, 29hu


03-2007
prasad

5,39,000

86,916

86,916

28,000

32

13,50,000

5,305

12,66,131

0 Ashok

57/05-06, 2701-2006

11,03,000

1,68,436

2,47,000

99,000

40

9,25,000

2,994

9,24,779

0 Ashok

59/05-06, 2701-2006

7,32,000

1,95,773

1,95,773

77,000

39

5,85,000

3,080

5,53,200

0 Ashok

56/05-06, 2701-2006

5,49,934

6,346

4,45,200

1,91,000

43

9,50,000

3,000

11,50,000

0 Renukaia 10/07-08, 12h


06-2007

11,20,000

33,000

33,000

12,000

36

12,90,000

14,970

8,06,790

0 C.J.Krish 61/08-09, 18negowda 08-2008

4,39,300

3,82,460

8,50,700

1,47,000

17

35,09,580

2,40,892

3,66,472

58,000

16

37,57,296

37,57,296

13,88,000

37

embankment in 9th 287/07-08


KM of SD2 of D-24 22.02.08,2202-2008

0 PL
87, 29-03RAMAKR 2010
ISHNAIA
H
0 c.varadar
40/2010-11,
aju
03-12-2010

* Balance
Cost

0 Jagadish

445 71

90

EWE CD's and


embankment in 9th
KM of SD2 of D-24
(Balance Work )

CER No.
69/08-09
12.12.08,1212-2008

33,30,000

2,20,723

35,29,749

0 N.Eranna 45/2009-10,
12-08-2009

446 73

91

EWE CD's and


embankment in
12th KM of SD2 of
D-24

CER No.
64/08-09
10.12.08,1012-2008

33,20,000

2,88,623

34,68,673

0 N.Eranna 126/2009-10,
07-01-2010

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

447 74

92

EWE CD's and


embankment in
13th KM of SD2 of
D-24

CER No.
65/08-09
10.12.08,1012-2008

36,35,000

2,81,260

38,31,329

0 B.N.Manj 84/2009-10,
egowda 09-11-2009

38,31,257

2,81,332

3,74,635

37,000

10

448 76

93

EWE CD'sand
embankment in
15th KM of SD2 of
D-24

CER No.
68/08-09
12.12.08,1212-2008

36,25,000

2,068

38,24,400

0 N.G.Ram 170/2009-10,
alingego 31-03-2010
wda

33,46,931

4,79,537

12,36,452

4,52,000

37

449 77

94

EWE CD's and


embankment in
16th KM of SD2 of
D-24

CER No.
67/08-09
12.12.08,1212-2008

33,50,000

3,479

34,87,211

0 P.Rames 72/2009-10,
h
04-11-2009

33,28,482

1,62,208

1,62,208

64,000

39

450 79

95

CERNo.
84/08-09
01.01.09,0101-2009

23,60,000

2,08,266

24,63,260

0 J.K.Manj 104/2009-10,
unath
07-12-2009

24,51,155

2,20,371

2,29,897

22,000

10

451 80

96

EWE and
Construction of
C.D.Works in Ist
KM of Jennenahalli
Minor of
EWE
andSD-2 of D-

CERNo.
85/08-09
01.01.09,0101-2009

22,50,000

2,08,598

23,31,390

0 B.S.Asho 103/2009-10,
k
27-11-2009

23,07,925

2,32,063

2,32,063

38,000

16

97

Construction of
C.D.Works in 2nd
KM of Jennenahalli
Minor of
EWE
andSD-2 of D-

CERNo.
86/08-09
01.01.09,0101-2009

28,50,000

11,746

29,41,985

0 Jayaram 125/2009-10,
07-01-2010

28,31,998

1,21,733

6,24,097

2,82,000

45

98

Embankment and
Construction of
C.D.Works in 3rd
KM
of and
Jennenahalli
EWE

CERNo .
87/08-09
01.01.09,0101-2009

66,65,000

1,543

66,24,916

0 Sridhar
R.Beligi

65,74,066

52,393

92,477

20,000

22

99

Embankment and
Construction of
C.D.Works in 4th
KM
of and
Jennenahalli
EWE

CERNo.
88/08-09
01.01.09,0101-2009

28,65,000

0 P.G.Prab 129/2009-10,
huprasad 08-01-2010

20,33,200 29,21,95,910 29,21,95,910

3,63,000

113

Construction of
C.D.Works in
5thKM of
Jennenahalli
Earthwork Minor

CER No.
299/06-07
24.11.06,2411-2006

50,40,000

9,823

60,94,211

0 Sridhar
R.Bilagi

60,78,145

25,889

3,26,823

1,27,000

39

114

excavation in 1st
km of L1 sub
distributory under D26
of TBC
EWE
and

3274/200708,10-01-2008

46,00,000

3,22,023

51,94,399

0 S.
126/07-08, 10Manjunat 01-2008
h

49,65,000

5,51,422

5,51,422

60,000

11

115

construction of CD
works in L2C sub
distributory
Earthwork under

SER No.
199/07-08
.16.4.08,16-042008

10,00,000

2,36,508

7,63,492

0 C.G.Kris 15/08-09, 21hne


05-2008
Gowda

10,00,000

12,36,508

3,05,000

25

458 114

116

excavation and
construction of CD
works under R2
minor of D-26
Earthwork

48,00,000

4,38,392

52,38,392

68/07-08, 1510-2007

51,11,143

5,65,641

5,65,641

51,000

459 115

117

4,95,000

11,178

5,33,765

0 B.H.Jayr 27/08-09, 12am


06-2008

3,00,200

2,44,743

2,44,743

13,000

452 81

453 82

454 83

455 107

456 108

457 109

CER No.5/
excavation and CD 07-08
works in R7 minor 14.05.07,14of D-26
05-2007
Earthwork
excavation and CD
works in 1st km of
R8 sub distributory

DR No.11/ 0708
21.07.07,2107-2007

2,31,510 29,39,97,600

0 K.J.Vish
wa nath

137/2009-10,
28-01-2010

01/2008-09,
15-01-2009

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
460 116

118

461 117

119

462 118

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

Earthwork
13/2007-08,21excavation and CD 07-2007
works in 3rd km of
R8 sub distributory DR No.14/
Earthwork
excavation and CD 07-08
works in 4th km of 21.07.07,21R8 sub distributory 07-2007

5,00,000

10,793

5,16,122

0 B.H.Jayr 21/08-09, 02am


06-2008

2,18,400

3,08,515

3,08,515

12,000

4,83,000

23,845

5,16,316

0 B.H.Jayr 22/08-09, 02am


06-2008

3,00,000

2,40,161

2,40,161

73,000

30

120

Earthwork
excavation and CD
works in 5th km of
R8 sub distributory

DR No.15/ 0708
21.07.07,2107-2007

4,90,000

25,857

5,15,857

0 B.H.Jayr 23/08-09, 02am


06-2008

4,00,000

1,41,714

1,41,714

46,000

32

463 119

121

Earthwork
excavation and CD
works in 6th km of
R8 sub distributory

DR No.16/
07-08
21.07.07,2107-2007

4,95,000

55,629

5,45,629

0 B.H.Jayr 26/08-09, 02am


06-2008

4,85,000

1,16,258

1,16,258

24,000

21

464 120

122

Earthwork
excavation and CD
works in 7th km of
R8 sub distributory

DR No.17/
07-08
21.07.07,2107-2007

4,97,000

51,261

5,48,261

0 B.H.Laks 24/08-09, 02hmikanth 06-2008

4,59,050

1,40,472

1,40,472

23,000

16

465 121

123

Earthwork
excavation and CD
works in 8th km of
R8 sub distributory

DR No.18/
07-08
21.07.07,2107-2007

4,80,000

73,443

5,19,380

0 B.H.Laks 25/08-09, 02hmikanth 06-2008

4,99,000

93,823

93,823

20,000

21

466 122

124

22,45,000

2,23,217

21,43,442

0 K.Ramak 224/07-08, 14rishna


03-2008
reddy

20,11,895

3,54,764

3,54,764

76,000

21

467 123

125

Earthwork
CER No. 84/
excavation and CD 07-08,28-11works in L2B sub
2007
distributory of
D- CER No. 85/
Earthwork

21,65,000

1,78,000

23,53,857

0 Chikka
swamy

19/08-09, 0206-2008

22,73,300

2,58,557

2,58,557

32,000

12

excavation and CD 07-08


works in 1st km of 26.11.07,26R10 sub distributory 11-2007
468 124

126

Earthwork
excavation and CD
works in 2nd km of
R10 sub distributory

CER No. 105/


07-08
4.12.07,04-122007

18,40,000

16,718

19,58,031

0 N.G.Ram 34/08-09, 23a linge


06-2008
Gowda

11,69,212

8,05,537

9,99,881

1,20,000

12

469 125

127

Earthwork
excavation and CD
works in 5th km of
R10 sub distributory

CER No.86/
07-08
26.11.07,2611-2007

22,40,000

2,01,316

24,15,597

0 T.H.Venk 38/08-09, 25atachala 06-2008

5,40,000

20,76,913

20,76,913

6,70,000

32

470 126

128

CER No.87/
07-08,26-112007

18,00,000

3,906

19,59,548

0 H.V.Basa 39/08-09, 25va raju


06-2008

19,63,454

19,59,548

7,84,000

40

471 127

129

Earthwork
excavation and CD
works in 6th km of
R10 sub distributory
Earthwork

CER No.101/
07-08
4.12.07,04-122007

15,00,000

24,401

17,13,999

0 M.K.Rudr 32/08-09, 23aiah


06-2008

17,38,400

17,31,399

6,93,000

40

130

excavation and CD
works in 7th km of
R-10 sub
distributory
Earthwork

24,70,000

8,008

18,04,917

0 B.Rama 40/08-09, 25krishnaia 06-2008


h

16,41,649

1,71,276

2,62,696

24,000

472 128

CER No.206/
excavation and CD 07-08
works in under L/s 21.1.2008,21minor off taking at 01-2008
Ch.7125m of L1

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

CER No. 207/


07-08
21.1.2008,2101-2008

33,70,000

3,795

22,36,922

SER No.39/0809
24.11.08,2411-2008

7,00,000

22,235

6,71,118

DR NO.64/0809
20.12.08,2012-2008

2,45,000

SER No.52/0809
26.12.08,2612-2008

9,90,000

SER No.51/0809
26.12.08,2612-2008

473 129

131

474 130

132

Earthwork
excavation and CD
works in under L/s
minor off taking at
Ch.7950m
of L1
Balance
earthwork

133

excavation in 3rd
km of L1 sub
distributory of D26
underand
TBC
EWE

134

construction of CD
works in left side
minor off take at
Ch. 140m
EWE
and of 1st km

135

construction of CD
works in right side
minor @ Ch. 4175
m in 5th
EWE
andkm of R6

136

construction of CD
works in left side
minor @ Ch. 5500
m in 6th
EWE
andkm of R6

137

construction of CD
works in right side
minor
@ Ch. 1550
EWE and

475 131

476 132

477 133

478 134

479 135

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

9,40,717

9,36,922

3,75,000

40

0 K.S.Venk 63/2009-10,
ateshmur 22-10-2009
thy

5,43,000

1,50,353

1,57,000

60,000

38

2,53,584

0 A.S.Prav 61/2011-12,
een raj
01-10-2011

2,53,584

2,45,000

98,000

40

81,253

9,96,996

0 V.Nagara 160/2009-10,
j
10-03-2010

9,73,810

1,04,439

4,23,135

1,34,000

32

7,36,000

80,070

7,73,748

0 D.Anand 2, 20-02-2010
a prasad.

1,65,961

6,87,857

8,53,818

3,10,000

36

CER No.133
/08-09,04-032009

24,00,000

28,89,582

0 B.C.
Prakash

28,89,582

28,89,582

12,92,000

45

857/09-10,2708-2009
DR No.63/0809
18.12.08,1812-2008

12,50,000

14,89,664

14,48,707

40,957

12,10,000

5,96,000

49

4,40,000

19,788

4,39,821

5, 20-04-2011
M.K.Sidd
0 Chikkaga 164/2009-10,
ngaiah
10-03-2010

4,26,413

33,196

1,81,882

65,000

36

CER No.
107/08-09
22.1.09,22-012009

14,30,538

1,09,462

11,26,616

0 S.N.Prak 12/2010-11,
ash
15-06-2010

10,81,140

1,54,938

6,42,932

96,000

15

CER No.80/0809
31.12.08,3112-2008

48,50,000

14,513

35,70,496

0 B.S.Asho 113/2009-10,
k
14-12-2009

17,15,348

18,69,661

24,41,264

9,76,000

40

CER No.
of CD works in 13th 14/06-07,12km of SD-1 of D-26 06-2006

16,85,000

54,375

17,85,000

0 S.Pravee 31/06-07, 11n


03-2006

17,49,438

89,937

35,562

34,000

96

Providing CC lining
from 2000m to
3000m under D11
of TBC. CC lining
Providing

14,60,000

3,000

15,14,406

0 A.B.Shiv 61/02-03, 03a kumar 01-2002

1,24,000

13,93,406

13,93,406

5,34,000

38

10,00,000

3,000

12,50,000

0 Lakshmik 203/07-08, 15anth


02-2008

10,00,250

2,52,750

2,52,750

1,00,000

40

6,45,000

4,179

7,96,180

0 B.H.Jaya 202/07-08, 15ram


02-2008

6,96,300

1,04,059

1,04,059

40,000

38

7,10,000

9,569

8,50,481

0 D.Eshwa 33/07-08, 23r reddy


07-2007

7,36,250

1,23,800

1,23,800

46,000

37

480 136

138

481 137

139

140

construction of CD
works in 1st km of
Left side in L-1 sub
distributory
EWE
and off take

483 148

112

Construction of
C.D.Works in LTE
Minor under D-26
of
TBC
EWE
& construction

484 152

149

485 155

150

486 156

151

487 159

152

"156/01-02 3003-02,30-032002

208/06-07 16from 0m to 1000m 03-07,16-03Adagondanahalli


2007
minior under
of 212/06-07 16Providing
CCD12
lining
from 0m to 1000m 03-07,16-03Thogarigatta minior 2007
under
D-12
oflining
TBC. 205/06-07 15Providing
CC
from 0m to 1000m 03-07,15-03Thyagature minior 2007
under D-12 of TBC.

0 I.B.Chen 11/08-09, 19na reddy 05-2008

* Balance
Cost

13,00,000

construction of CD
EWE and
construction of CD
works in 1st km of
right side Jiddigere
minor and
off take at
EWE

482 141

Detailed /
Estimated
Cost

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

488 160

154

Providing CC lining CER No.155 /


to 7th km of D24
07-08
3.01.08,03-102008

58,80,000

5,67,283

65,57,466

489 161

156

97,75,000

28,560

1,23,59,068

490 164

157

Providing CC lining
to 8th km of D-24
(178A), Providing
CC lining to 9th km
of D-24 (178B),
Providing
CC lining

CER 412/07from 10160m to


08 31-0311000m under D-24 08,31-03-2008
of TBC.

28,90,000

4,719

491 165

158

Providing CC lining CER 410/07from 11000m to


08 31-0312000m under D-24 08,31-03-2008
of TBC.

31,75,000

492 167

159

CER.No
397/07-08 2803-08,28-032008

493 168

160

Providing CC lining
from 1000m to
2000m
Dasarakallahalli
minior under
Providing
CCD-24
lining

494 162

167

CER No
from 0m to 1000m 395/07-08,28Honnashettihalli
03-2008
minior
under
Providing
CCD-24
lining CER No.9
in 1st km of SD2
/07-08
14.6.07,14-062007

495 169

168

Providing CC lining
in 1st km of D-26
(190A), Providing
CC lining in 2nd km
of D-26 (190B)

496 170

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

66,08,167

5,16,582

5,16,582

10,000

0 B.S.Asho 124/07-08, 08- 1,20,00,000


k
01-2008

3,87,628

3,59,068

1,20,000

33

31,70,499

0 S
90/08-09, 19Basavara 01-2009
j

30,00,000

1,75,218

1,75,218

68,000

39

3,171

34,22,060

0 N Eranna 92/08-09, 2001-2009

32,00,000

2,25,231

2,25,231

89,000

40

11,44,550

5,450

10,00,000

0 Shiva
Prasann
a

10,05,450

11,50,000

2,08,000

18

10,37,913

7,087

8,43,326

7,95,117

55,296

2,49,883

20,000

1,08,07,000

9,02,479

1,16,49,489

1,12,70,339

12,81,629

15,51,968

2,80,000

18

CER
137/138/06-07
14.09.06,1409-2006

1,08,05,000

47,979

1,40,30,569

1,31,01,090

9,77,458

9,29,479

3,60,000

39

169

Providing CC lining CER


in 3rd and 4th km of 131,136/06-07
D-26
14.09.06,1409-2006

80,90,000

4,190

1,08,30,422

0 K.J.Vish
wa nath

217/07-08, 10- 1,04,07,040


03-2008

4,27,572

4,23,382

1,70,000

40

497 171

170

1,09,00,000

1,966

1,44,50,992

0 M.B.Nan 216/07-08, 10- 1,29,83,900


dish
03-2008

14,69,058

14,67,092

5,20,000

35

498 172

171

93,00,000

5,17,686

1,27,57,490

0 M.B.Nan 212/07-08, 10- 1,26,61,359


dish
03-2008

6,13,817

9,42,448

1,80,000

19

499 173

172

Providing CC lining 132/133/06in 5th km of D-26 07,14-09-2006


(192A), Providing
CC
lining in
6th
km CER 134/06Providing
CC
lining
in 7th km of D-26 07
(193A), Providing 14.09.06,14CC lining in 8th km 09-2006
of
D-26 (193B)
Providing
CC lining CER 622/06-

92,25,000

1,59,661

1,07,59,304

0 B.S.Asho 125/07-08, 09- 1,05,87,501


ka
01-2008

3,31,464

1,71,803

36,000

21

173

in 9th km of D-26
(194A), Providing
CC lining in 12th
km
of D-26 (194B)
Construction
of

4,60,000

1,500

4,60,000

1,506

1,01,500

51,000

50

500 179

CER No.482 /
06.07
25.01.07,2501-2007

07 26.3.07,2603-2007

DR 189/07balance CD works 08
24-3under 10A2 of TBC 07,24-03-2007

0 G.S.Ravi 91/08-09, 19shankar 01-2009

* Balance
Cost

0 G.B.Nag 9/2010-11, 08arajappa 06-2010


0 M/s.
67/07-08, 15Proffessi 10-2007
onal
Global
0 Infrastruc
M.N.
214/7-08, 10Lokesh 03-2008

0 G.S.Ravi 26/2009-10,
shankar 20-07-2009

4,59,994

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
501 181

175

502 184

176

503 190

181

504 191

184

505 192

187

506 193

Work Name

Protective works
from ch 6000 to
7000 m under D11
of TBC.
construction
of

Sanction No.

179/07-08 2003-08,20-032008

SER 55/08guide wall across


09,26-12-2008
escape halla on U/S
and
D/S Of of
Construction
DR 38/
08under tunnel @
09
Ch.6275 m in 7th
20.10.08,20km of D24
10-2008

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

4,95,000

2,935

4,95,000

0 K.S.Shiv 53/10-11, 25akumar. 01-2011

4,58,111

39,824

4,97,935

2,45,000

49

9,90,000

3,833

6,99,181

0 P.G.Prab 161/2009-10,
huprasad 10-03-2010

5,60,010

1,43,004

4,29,990

52,000

12

75,000

1,500

65,800

0 K.T.Rang 30/09-10, 20aswamy 07-2009

65,562

1,738

75,000

30,000

40

85,64,000

2,04,807

98,06,125

0 I.C.Chen 39/04-05, 27nareddy 10-2004

88,37,250

11,73,682

11,73,682

1,57,000

13

Construction of SP
@ Ch. 9875 m and
10125m and
formation of jack
bund
fromand
Ch.9775
Providing
fixing

CER No.
37/04-05
9.8.04,09-082004

DR No: 49/07M.S.Gate to Head 08


Sluice at ch: 10240 15.10.07,15M of D-24.
10-2007

2,00,000

1,132

1,85,746

0 K.Raman 37/08-09, 23na


06-2008

1,85,284

1,594

15,848

19,000

120

185

Construction of
S.P./U.T at Ch:
3280M in 4th KM of
SD-1 of D-24.

SER No:
02/09-10
08.06.09,0806-2009

9,85,000

96,404

9,90,000

0 Jagadee 52/2009-10,
sh
07-09-2009

8,75,000

2,11,404

2,11,404

44,000

21

507 208

196

18,50,000

1,05,397

28,68,105

0 Murali
krishna

58/08-09, 1108-2009

22,18,581

7,54,921

7,54,921

1,65,000

22

508 212

197

Construction of Cut CER No.


and cover type R.B. 485/06-07
@ Ch. 105 /150 mtr 25.01.07,25in 1st km of L1 sub 01-2007
distributory under
D- CER No.
Construction
of

40,55,000

3,51,414

28,48,151

5,00,679

16,64,000

1,80,000

11

104/07-08,0412-2007

0 S.N.Prak 88/08-09, 07ash


01-2009

26,98,886

509 213

198

Balance of CD
works in 1st and
2nd km of R6ofsub
Construction

15,55,000

4,852

16,07,452

0 B.H.Laks 63/08-09, 18hmi


08-2008
kantha

13,61,000

2,51,304

2,46,452

76,000

31

510 215

208

Construction of
balance CD works
3rd km of R8 sub
distributory of D26

DR.No.
186/07-08
20.03.08,2003-2008

4,00,000

5,04,663

2,09,400

2,95,263

2,99,600

2,00,000

67

511 217

199

CER No.
98/07-08 ,0412-2007

14,20,000

76,450

14,96,450

0 B.H.
64/08-09, 18Lakshmi 08-2008
kanth

14,00,000

1,72,900

1,72,900

10,000

512 218

200

Construction of
balance CD works
5th km of R8 sub
distributory
D26
Constructionofof

CER No.77/0809
23.12.08,2312-2008

25,90,000

16,803

21,33,497

0 SS
11/09-10, 15Umapath 06-2009
aiah

20,86,072

64,228

20,04,097

9,25,000

46

201

petronet crossing at
Ch. 12020 m in
13th km , 535m in
1st
km L2A, 5328
m
Construction
of CD

DR.NO.69/0809
22.12.08,2212-2008

1,90,000

54,193

1,57,000

0 B.N.Arun 98, 13-11kumar


2009

2,11,193

2,11,193

63,000

30

works in R7 sub
distributory of D26
Providing
Embankment in 1st
and 2nd km in L3A
minor of D26

DR.NO.67/ 0809
22.12.08,2212-2008

3,29,000

67,616

2,78,954

0 S.N.Prak 103/2010-11,
ash
28-03-2011

3,36,606

9,964

3,25,000

1,12,000

34

513 220

514 222

202

CER No.
balance CD works 99/07-08
1st km of R-8 sub
11.12.07,11distributory of D-26 12-2007

0 V.
Nagaraj

18/2011-12,
20-06-2011

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

DR.NO.61/0809
18.12.08,1812-2008

4,30,000

51,088

6,83,999

0 Varadara 68/2010-11,
j
04-02-2011

6,83,999

51,088

7,35,087

1,82,000

25

DR.NO.62/0809
18.12.08,1812-2008

4,30,000

1,25,755

6,83,999

0 V.Nagara 68/2010-11,
j
04-02-2011

5,93,159

2,16,595

8,09,754

1,94,000

24

5,00,000

400

3,70,312

0 I.V.Rami 41, 03-12Reddy


2010

3,70,712

4,52,000

1,48,000

33

0 G.S.Ravi 42/10-11, 03shankar 12-2010

0 22,69,68,566 22,69,68,566

9,08,000

515 223

203

516 224

204

Construction of CD
works and PO's
from Ch. 0.00 to
1400 m of Jiddigere
right side minor
off
Construction
of CD

517 69

88

works and PO's


from Ch. 0.00 to
1400 m of Jiddigere
minor for
off widening
take at
EWE

518 84

100

519 85

101

520 86

102

80/2009-10,10of Canal from Ch:


02-2010
5175M to 5350M in
6th KM
of SD-2 of D- 38/2009-10,10EWE
and
Construction of
12-2009
C.D.Works in 6th
KM
ofand
Jennenahalli 16/2009-10,11EWE
Construction of
11-2009
C.D.Works in7th
KM ofand
Jennenahalli 15/2009-10,11EWE

521 70

103

522 89

105

Construction of
11-2009
C.D.Works in 8th
KM ofand
Jennenahalli 39/2009-10
EWE
Construction of
20-01-2010,20C.D.Works in 9th
01-2010
KM of Jennenahalli
Minor
of SD-2 of D- 123/2009EWE and

106

Construction of
C.D.Works for
minor
offtaking at
EWE and

104

Construction of
C.D.Works for
minor and
offtaking at
EWE

107

Construction of
C.D.Works for
minor and
offtaking at
EWE

108

Construction of
C.D.Works for
minor
offtaking at
EWE and

109

Construction of
C.D.Works for
minor and
offtaking at
EWE

110

Construction of
C.D.Works for
minor and
offtaking at
EWE

111

Construction of
C.D.Works for
minor
offtaking at
EWE and

141

Construction of
C.D.Works for
minor and
offtaking at
EWE

523 90

524 88

525 91

526 92

527 93

528 94

529 95

530 142

Detailed /
Estimated
Cost

32,00,000

Misc.
Estimated
Cost

Contract
Value

1,23,066 22,68,45,500

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

6,40,000

31,638

7,25,425

0 Anand
Prasad

6, 20-04-2011

7,04,827

52,236

6,40,000

2,90,000

45

9,80,000

2,782

8,27,418

0 Srikantai 3/2011-12, 15ah


04-2011

8,30,200

7,62,782

3,04,000

40

0 C.V.Mah 17/2009-10,
alingaiah 01-07-2010

3,11,269

2,07,918

5,19,187

1,73,000

33

4,90,000

29,187

4,90,000

11,60,000

2,052

10,78,286

0 T.V.Laks 73/10-11, 09hmikanth 02-2011

11,669

10,68,669

11,50,383

4,26,000

37

125/200910,29-03-2010

24,00,000

5,941

16,65,112

0 S.N.Prak 98/10-11, 18ash


03-2011

84,681

15,86,372

24,05,941

6,67,000

28

122/200910,29-03-2010

18,80,000

4,478

18,80,000

0 A.G.Srini 60/2011-12,
vasa
06-09-2011

18,84,478

18,84,478

7,52,000

40

5136/10-11,1003-2011

10,12,516

25,742

12,88,051

0 P.RChani
gappa

9,780

13,04,013

13,13,793

3,39,000

26

44/2009-10,0903-2010

9,96,000

22,134

10,12,516

0 B.S.Sure 154, 05-03sh


2012

9,780

10,24,870

10,34,650

3,98,000

38

43/2009-10,0903-2010

7,43,000

9,078

8,80,632

0 Abusaleh 30, 25-06a


2011

9,780

8,79,930

8,89,710

2,97,000

33

124/200910,29-03-2010

12,65,000

31,779

15,47,297

0 K.B.Raju 124, 29-032010

15,79,076

15,79,076

5,06,000

32

16/2009-10,1111-2009

7,68,000

8,98,000

0 G.Mohan 50, 29-072011

7,82,757

1,15,243

7,68,000

2,94,000

38

59/2009-10,22construction of CD 03-2010
works in right side
minor R3 to R4 sub

8,58,000

21,086

8,00,127

0 G.Mohan 81/10-11, 1502-2011

8,21,213

8,00,127

3,20,000

40

10,29-03-2010

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
531 204

195

532 143

142

533 144

143

534 146

144

535 186

193

536 187

178

537 201

179

Work Name

Construction of
Pipe Acquaduct
and Formation of
service
EWE
& road and

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

36/2009-10,0402-2010

7,80,000

5,86,608

60/2009-10,22Construction of CD 03-2010
works in left side
minor
at 3900m
in 58/09-10,25Formation
of Partial
Embankment in
01-2010
EWE & construction SERNo.57/20
of CD works in L/S 09-10,22-03Sub minor off-take 2010
at
ch.1525m in
Construction
of 2nd
box 16/2009-10,31-

12,10,000

12,10,000

5,00,000

1,298

2,81,767

9,99,000

28,506

14,06,394

4,98,000

1,224

4,42,000

Allotted
grant for
2011-12

% Grant

Remarks

32

12,10,000

12,10,000

4,84,000

40

0 TH
, 08-06-2010
Shivanna
0 M.K.Sidd 90, 06-01agangaia 2012
h

2,59,257

23,808

2,42,041

29,000

12

8,19,725

6,15,175

9,99,000

4,00,000

40

4,99,867

0 P.G.Prab 130/2009-10,
huprasad 08-01-2010

4,50,000

51,091

51,091

12,000

23

1,795

3,37,332

0 B.H.Jayr 22/2010-11,
am
05-07-2010

3,39,127

4,42,004

1,35,000

31

7,65,000

3,969

8,80,531

8,36,945

47,555

6,21,823

2,64,000

42

4,00,000

52,947

3,05,407

0 B.H.Jaya
ram
0 K.Raman
na

2,97,231

61,123

4,00,000

1,22,000

30

Dr.No.70/200910,10-02-2010

2,00,000

4,267

1,99,908

0 Chikkasw 47/2010-11,
amy
25-01-2010

1,92,405

11,770

80,411

30,000

37

41/2009-10,20Pipe acquaduct @ 01-2010


ch: 11100m in 12th
KM
of SD-1 of
Construction
of D- 92/09-10,12Road Bridge at
03-2010
Construction of
58/2009-10,25Approach road
01-2010
embackment in 3rd
km of R-10 Sub
Construction
of
958/2010-

2,00,000

17,064

1,68,301

0 C.V.Mah 156/2009-10,
alingaiah 03-03-2010

1,53,566

31,799

2,17,064

68,000

31

41,25,000

53,14,863

5,60,000

1,298

6,43,788

3,00,000

29,275

D.R.NO;55/20
09-10,25-012010

4,00,000

head sluice in D28A1

DR NO
18/2009-10,0909-2009

539 196

183

540 198

186

culvert @ ch:
9440m in 10th KM
of D-24.
Construction
of

541 228

205

542 231

206

543 232

207

03-2010
81/2009-10,1103-2010

Construction of
CD&EWE from
ch:7560 to 7710m
in 8th km of D-27(A)
construction
of

46/2010-11,
25-01-2011
72/10-11, 0802-2011

0 A.H.Para
mashivai
0 T.H.Man
avalaiah

44, 10-122010
10/2010-11,
08-06-2010

53,14,301

562

5,07,052

2,30,000

45

6,42,371

2,715

5,00,000

2,24,000

45

2,88,042

0 C.Laksh
man

13/2010-11,
15-06-2010

2,63,563

53,754

76,367

24,000

31

27,786

3,84,754

21/2010-11,
01-07-2010

4,12,540

3,84,754

1,60,000

42

4,07,000

51,262

3,87,786

0 M.K.Sidd 157/2009-10,
agangaia 03-03-2010
h

4,39,048

4,51,262

1,63,000

36

CTC's in 2nd in L3c 11,31-05-2010


sub-dist of D-26

188

Actual
Balance
Cost

2,35,000

drain from ch800


08-2009
TO 900M in
Badenahalli
Constructionvillage
of box 57/2009-10,25drain and road
01-2010
bridge in Belavatha
village limits inof
Construction
48/09-10,09-

0 Prabhupr 204/2010-11,
asad
25-02-2011

* Balance
Cost

7,38,000

182

545 241

Agreement
Total
No & Date Expenditutre

4,01,595

538 195

145

Agency
Name

1,85,013

canal culvert and


Extension. of Wings
for SP @ ch:
6275m in 7th KM of
D-24.
Const. of Pipe

544 240

LS for
Ancillary
Work

546 243

189

construction of
head sluice in D28A4

DR
NO;21/200910,17-09-2009

4,35,000

35,809

4,28,112

0 B.N.Ram 139/2010-11,
akrishna 28-01-2010

4,63,921

4,67,809

1,71,000

37

547 244

190

Construction of
head sluice at ch
191200m of TBC
for
D-28B1
Distributaries

46/2009-10,2501-2010

4,20,000

28,977

4,00,918

0 C
39/2010-11,
Varadara 03-12-2010
ju

4,29,895

4,29,895

1,61,000

37

22,15,14,997 59,32,73,460 62,83,83,976

3,87,85,000

Total

27,23,39,517

82,56,014 79,58,09,102

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Potential Works , General , Distributaries , Protective Work Spill Over
548 180

174

Protective works
from ch 5000 to
6000 m under D11
of
TBC.
Distributaries

183/07-08 2003-08,20-032008

4,98,000

1,153

6,46,769

0 P.G.Prab 87/10-11, 25huprasad 02-2011

4,92,342

1,55,580

6,47,922

2,59,000

40

Total

4,98,000

1,153

6,46,769

4,92,342

1,55,580

6,47,922

2,59,000

40

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Potential Works , General , FIC(CNNL) , New Constructions Spill Over
549 428

354

550 429

363

551 430

362

552 431

358

553 432

357

554 435

359

555 405

340

556 406

341

557 407

342

558 408

343

559 409

344

560 410

346

561 420

353

562 423

356

563 424

355

Construction of FIC 48/2010-11,01at ch:7275M, 7650 12-2010


M, P.O's of L-1 SD
under
D-26 of of
TBC.
Construction
FIC 49/2010-11,01at ch:8650M 6515 , 12-2010
P.O's of L-1 SD
under D-26 ofofTBC.
Construction
FIC 50/2010-11,01at ch:8050M, P.O's 12-2010
of L-1 SD under D26
of TBC. of FIC 42/2010-11,01Construction
at ch:150M, 875 M, 12-2010
1175M,1550M
P.O's of L-2AofSD
Construction
FIC 41/2010-11,01at ch:2125M, 2500 12-2010
M, 3250M, P.O's of
L-2A SD under
D- 43/2010-11,01Construction
of FIC
at ch;5225M P.O.of 12-2010
L-2(A) SD under D26
of TBC.
EWE
for FIC &
34/2006-07,16construction of CD 08-2010
works in block No.1
of
D-25
EWE
forunder
FIC &TBC 37/2006-07,16construction of CD 08-2006
worksin block No.2
of D-25
EWE
forunder
FIC &TBC 35/06-07,16construction of CD
EWE for FIC &
construction of CD
EWE for FIC &
construction of CD
Construction of FID
and C.D.in block
No.1 right side)
under D-24 of TBC.

08-2006
32/06-07,1608-2006
33/06-07,1608-2006
DR
NO.31/201011,01-12-2010

Construction of FID 58/2010-11,01and C.D.in block


12-2010
No.4 (left side)
under SD-1 D-24
Construction
of of 40/2010-11,01FICat ch:735M.P.O 12-2010
of L-1 SD under D26 of TBC. of FIC 39/2010-11,01Construction
at ch:1250M,
12-2010
1520M, 1725M,
2025M P.O's of L-1

2,09,000

3,000

2,48,000

3,000

1,97,994

4,76,000

3,000

4,33,000

0 B.N.Arun
kumar

2,12,000

2,12,000

1,82,000

86

0 T.H.Shiv 74/10-11, 10anna


02-2011

1,96,347

4,647

1,82,134

1,74,000

96

2,78,984

0 P.L.Ram 97/10-11, 18akrishnai 03-2011


ah

2,78,984

3,000

2,96,000

2,47,000

83

3,000

3,63,421

0 G.Mohan 82/10-11, 1502-2011

3,66,421

3,86,000

3,63,000

94

2,80,000

3,000

9,750

2,73,250

2,73,250

2,67,000

98

2,03,000

2,000

1,99,998

0 k.jagadis 59/2010-11,
h
25-01-2011

1,78,570

23,428

2,02,000

2,00,000

99

1,62,000

3,000

1,61,991

44/2006-07,
03-10-2006

28,408

1,36,583

1,36,592

1,33,000

97

1,04,000

3,000

1,03,858

45/2006-07,
03-10-2006

93,681

13,177

13,319

11,000

83

1,85,000

5,000

1,33,464

56,536

56,536

51,000

90

1,19,000

3,000

84,511

37,489

37,489

1,18,000

315

1,73,000

3,000

1,76,000

1,76,000

1,72,000

98

46,000

44,793

0 D.kantha 58/2010-11,
raju
25-01-2011

44,793

45,000

45,000

100

3,54,000

4,000

3,49,000

0 Chikkaga 85/2010-11,
nganna 25-02-2011

2,52,113

1,00,887

2,46,054

2,39,000

97

4,15,000

6,000

3,45,389

0 K.B.Bette 94/10-11, 18gowda


03-2011

2,93,986

57,403

3,70,747

2,68,000

72

2,10,000

2,000

2,11,908

0 B.N.Arun 110, 10-02kumar


2011

1,92,000

21,908

2,13,908

2,10,000

98

0 G.Mohan

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
564 425

361

565 426

360

566 412

347

567 413

348

568 414

349

569 415

350

570 416

351

Work Name

Sanction No.

Construction of FIC 38/2010-11,01at ch:2500M,


12-2010
2975M, 3525M,
4175M,4525M
Construction
of&FIC 46/2010-11,01at ch:5550M,
12-2010
5875M,P.O's of L-1
SD
under D-26
Construction
of of
FID 52/2010-11,01and C.D.in block
12-2010
No.3 (left side)
under D-24 ofofTBC.
Construction
FID 65/2010-11,09and C.D.in block
12-2010
No.4 (left side)
under D-24 ofofTBC.
Construction
FID 53/2010-11,01and C.D.in block
12-2010
No.5 (left side)
under
D-24 ofofTBC.
Construction
FID 66/2010-11,09and C.D.in block
12-2010
No.6 (left side)
under
D-24 ofofTBC.
Construction
FID DR NO.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

352

Construction of FID
and C.D.in block
No.1 (left side)
under SD-1 of D-24
of TBC.
FIC(CNNL)

DR NO.
55/2010-11,0112-2010
Total

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

2,05,000

3,000

2,11,908

0 T.H.Shiv 76/2010-11,
anna
10-02-2011

2,04,177

10,731

2,08,000

2,09,000

100

1,18,000

1,11,057

0 K.Ramac 50/2010-11,
handra
25-01-2011
Reddy

1,11,057

1,18,000

1,11,000

94

1,08,000

2,000

1,09,123

0 P.r.chann 61/2010-11,
igappa
04-02-2011

99,123

12,000

1,11,123

1,09,000

98

5,60,000

5,91,935

0 P.L.Ram 17/2011-12,
akrishna 20-06-2011

5,91,935

5,55,000

5,91,000

106

1,57,000

3,000

1,55,127

0 P.L.Ram 48/2010-11,
akrishnai 25-01-2011
ah

1,54,918

3,209

1,58,127

1,55,000

98

6,65,000

9,000

5,67,150

0 Chikkaga 105, 28-03nganna 2011

5,26,798

49,352

5,39,000

5,68,000

105

1,88,000

4,400

1,75,673

0 K.S.Shiv 51/2010-11,
akumar. 25-01-2011

1,31,945

48,128

1,88,000

1,76,000

94

1,46,000

1,000

1,44,491

0 K.Raman 71/10-11, 08na


02-2011

1,45,491

1,46,000

1,45,000

99

57,64,000

68,400

43,23,800

28,58,775

24,99,425

48,70,279

47,44,000

97

and C.D.in block


54/2010-11,01No.7 (left side)
12-2010
under D-24 of TBC.
571 417

LS for
Ancillary
Work

Capital Expenditure - 4701 , Major Irrigation , Hemavathy Canal , Potential Works , SDP , FIC(CNNL) , New Constructions Spill Over
572 418

394

573 419

395

574 427

393

575 422

390

576 411

396

577 436

383

578 437

384

Construction of FID
and C.D.in block
No.1 (left side)
under SD-2
D24 of TBC. of FID
Construction

DR NO.
56/2010-11,0112-2010

3,50,000

1,000

3,45,389

0 P.R.Cha 92/2010-11,
nigappa 14-03-2011

2,37,312

1,09,077

3,50,000

3,45,000

99

DR NO.
and C.D.in block
57/2010-11,01No.3 (left side)
12-2010
under SD-1 D-24 of
TBC.
Construction of FIC 49/2010-11,01at ch:6050M, 6515 12-2010
M, P.O's of L-1 SD
under D-26 ofofTBC.
Construction
FIC 32/2010-11,01-

4,07,000

7,000

4,02,423

0 B.Chann 89/2010-11,
abasava 25-02-2010
prabhu

2,89,929

1,19,494

4,10,000

4,02,000

98

2,40,000

2,000

2,18,205

0 T.H.Shiv 75/2010-11,
anna
10-02-2011

2,18,131

2,074

2,40,000

2,18,000

91

4,50,000

7,000

4,57,844

0 K.Raman 95/10-11, 18na


03-2011

4,06,209

58,635

4,64,844

4,57,000

98

74,000

1,000

74,711

0 D.kantha 57/2010-11,
raju
25-01-2011

74,707

1,004

75,711

75,000

99

4,00,000

9,653

3,93,242

0 I.V.Ramir 60/2010-11,
eddy
01-02-2011

3,49,450

53,445

4,09,653

3,93,000

96

5,00,000

6,022

4,92,849

0 C.Laksh
man

4,92,145

6,726

5,06,022

4,92,000

97

in block No.10 of
12-2010
under D-25A of
TBC
Construction of FID 51/2010-11,01and C.D.in block
12-2010
No.2 (right side)
under D-24 ofofTBC.
Construction
FIC 28/2010-11,01under block
12-2010
No.1,2,&3 of SD-1
of D-26 underofTBC.
Construction
FIC 29/2010-11,01under block No.4 of 12-2010
SD-1 of D-26 under
TBC.

84/10-11, 2302-2011

Sl. No. AWP No. 2011-12


2010-11 Division
AWP No.
579 438

385

580 439

386

581 440

387a

582 441

388

583 442

Work Name

Sanction No.

Detailed /
Estimated
Cost

Misc.
Estimated
Cost

Contract
Value

LS for
Ancillary
Work

Agency
Name

Agreement
Total
No & Date Expenditutre

* Balance
Cost

Actual
Balance
Cost

Allotted
grant for
2011-12

% Grant

Remarks

Construction of FIC 30/2010-11,01under block No.5 of 12-2010


SD-1 of D-26 under
TBC.
Construction of FIC 33/2010-11,01under P.O. No.1 of 12-2010
D-27(A) under TBC.

5,39,000

9,426

4,97,183

0 H.V.Nara 63/10-11, 04yana


02-2011

4,86,304

20,305

5,09,426

4,00,000

79

5,20,000

8,217

4,93,174

0 V.Nagara 69/10-11, 04ju


02-2011

4,90,830

10,561

5,08,217

4,93,000

97

Construction of FIC 35/2010-11,01under P.O. No.2&3 12-2010


of D-27(A) under
TBC.
Construction of FIC 34/2010-11,01under P.O. No.4 of 12-2010
D-27(A) under TBC.

3,32,000

3,000

3,34,452

0 Chikkasw 101/10-11, 18amy


03-2011

3,34,244

3,208

3,37,452

3,63,000

108

3,38,000

3,000

3,40,504

0 Rukman 100/2010-11,
gada
18-03-2011

3,43,504

3,43,504

3,40,000

99

389

Construction of FIC 36/2010-11,01under P.O. No.5 of 12-2010


D-27(A) under TBC.

3,60,000

3,000

3,63,017

0 Chikkaga 86/10-11, 25nganna 02-2011

3,66,017

3,66,017

3,34,000

91

584 433

391

3,79,000

3,000

3,68,346

0 K.S.Venk 83/10-11, 15atesh


02-2011

3,68,346

3,000

3,82,000

3,68,000

96

585 434

392

Construction of FIC 44/2010-11,01at ch;3700M P.O.of 12-2010


L-2(A) SD under D26
of TBC. of FIC 45/2010-11,01Construction
at ch;4725M P.O.of 12-2010
L-2(A) SD under D26 of TBC.
FIC(CNNL)
Total

3,21,000

3,000

3,03,778

0 P.G.Prab 119, 31-03huprasad 2011

3,03,700

3,078

3,24,000

3,20,000

99

52,10,000

66,318

50,85,117

40,51,307

11,00,128

52,26,846

50,00,000

96

Maintenance Expenditure-2701 , Major Irrigation , Hemavathy Canal , Operation & Maintenance(O & M) , General , Tanks , Annual Maintenance Expenditure Spill Over
586 328

567

Construction of
guidewall and
improvements to
Kunigal doddakere
Rambana Canal
Tanks
Grand Total

CER No.57
/07-08
20.11.07,2011-2007
Total

35,00,000

35,00,000
1,55,96,78,02
9

26,000

35,26,000

0 B.S.Asho 52/08-09, 21k


05-2008

26,000

35,26,000

2,11,16,888 1,10,92,13,91
4

55,65,183

* Balance cost for Pending bill works =Actual balance cost - Current year expenditure
Balance Cost for Spill over & Fresh works = Amount specified in latest stage - Cumulative expenditure

32,91,880

2,60,120

2,70,000

2,44,000

90

32,91,880

2,60,120

2,70,000

2,44,000

90

41,00,60,951 1,68,32,84,70 1,76,73,96,34 25,47,74,333