Bi Monthly Report April May 2012 Flowmore
Bi Monthly Report April May 2012 Flowmore
[INTAKEWATERSYSTEMPACKAGEfor2X525MWTPSA/CMonnet PowerCompanyLtd.,Malibrahmani,Angul,Odisha]
BiMONTHLYREPORTNO.01
TABLEOFCONTENTS 1. ProjectInformation 2. ProgressStatusSummary 3. SummaryofDrawingsSubmittals 4. SummaryofMaterialSubmittals/Approvals 5. RequestForInformation/InstructionsSummaryReport 6. NonConformanceReport(NCR) 7. MajorAreasofConcern 8. TwoWeeksLookAheadProgrammeofWorks 9. ProjectSCurve 10.UpdatedScheduleofWorks(forBiMonthlyReportOnly). 11.SitePhotos
1. ProjectInformation:<<SummaryofProjectScope>>
GeneralInformation Client ProjectManagement Consultant MainContractor ProjectDetails ContractDuration ContractAmount ContractStartDate ContractFinishDate ProjectDurationSummary Project Dates Commencement Date Contract Completion Date Data Date Project Duration / day Remaining Duration / day Days elapsed Elapsed period (%) 1-March-12 31-Dec-12 10-May-12 304 243 61 20.06%
2. Progress
a. ProgressSummaryHighlights NN
3. SummaryofDrawingSubmittalsStatus
Item Design Submitted Responded A B C D Pending ByFML ByDSWP 10 1 10 AwaitingInformation Basic Configurationis notyetfinalized. LikeSchemeof pumpswith capacity,Head andSumpBed Level2+1or3+1 Onlycomment wasgivenon pipethickness design calculations. Basedondesign/configuration approvalfromDCPL/Monnet. Basedondesign/configuration approvalfromDCPL/Monnet. Basedondesign/configuration approvalfromDCPL/Monnet. Basedondesign/configuration approvalfromDCPL/Monnet.
Mechanical Electrical
12 4
0 0 0
12 4 1
4. SummaryofMaterialSubmittals
Item Mechanical Electrical Control& Instrumentation Submitted 6 10 3 Responded 1 0 0 A B C D Pending 5 10 3 Awaiting Information
5.
RequestforInformation/InstructionsSummaryReport
PumpingConfigurationi.e.2+1or3+1 EachPumpflow/capacityi.e.3000cmhor2000cmh PumpHeadi.e.170mor179m SumpBedlevel(InvertLevel)i.e.RL68.3morRL66m
6.
NonConformanceReport(NCR)
NIL
7.
MajorAreasofConcern
Wehaveproceededwithdetailedengineeringandsubmissionofsystem/Equipment submittalsonthebasisofinformationmentionedinLOIdated1032012.However,dueto nonfinalization/nonapprovalofthesubmittalsmadesofar,wefindstuckuptoproceed furtherintermsofplacementofordersforvariousequipmentsandmoveaheadwith detailedengineeringi.e.submissionofmanufacturersdrawings,datasheetandfinallayout drawings.Inviewoftheaboveimmediatedecisionisrequestedforthefollowingtomake furtherprogress. PumpingConfigurationi.e.2+1or3+1 EachPumpflow/capacityi.e.3000cmhor2000cmh PumpHeadi.e.170mor179m SumpBedlevel(InvertLevel)i.e.RL68.3morRL66m FlowmoreLtd(FML)proposedjointmeetingwithendcustomerMonnetPowerCo.Ltd. (MPCL),DevelopmentConsultantPvt.LtdandDrake&ScullWater&Powertoexpedite theengineeringapprovalprocess.Tilltodaywehavenotconductedanyjointmeeting withendcustomer(MPCL)andprojectconsultant(DCPL). FlowmoreLtdreceivedLOIon10312and61dayshavepassedwithoutanysignificant progressindesign&Engineeringcausingaseverimpactonprocurementprocess.
8.
TwoWeeksLookAheadProgrammeofWorks
Onceafinaldecisiononthefollowingistakenandconfirmedtous; PumpingConfigurationi.e.2+1or3+1 EachPumpflow/capacityi.e.3000cmhor2000cmh PumpHeadi.e.170mor179m SumpBedlevel(InvertLevel)i.e.RL68.3morRL66m Wecanproceedwiththefollowingsubmittalsinnexttwoweeksfromthedateofreceiptof abovedesiredconfirmations.RefertoDrawingLog RevisedMotorSizingcalculations RevisedTransformerSizingcalculations RevisedPipeThicknesscalculations RevisedLoadListHT/LT. RevisedControlPhilosophy. RevisedP&ID. RevisedCableSizingcalculations RevisedCapacitorSizingcalculations RevisedPumpCrossSectionalDrawings. RevisedPumpPerformanceCurves. RevisedPumpHouseLayout. RevisedSubstationlayout. RevisedSingleLineDiagram RevisedCableSchedule.
9.
ProjectSCurve(forEngineering)
10. UpdatedScheduleofWorks(forMonthlyReportOnly)
10
11. SitePhotos
Notapplicableatpresent.
11
MONNET POWER COMPANY LIMITED DCPL, KOLKATA 2x525 MW TPP of MALIBRAHMANI, ANGUL, ORISSA DRAKE & SCULL WATER & POWER FLOWMORE LIMITED 10.05.2012
DESCRIPTION
UNIT
Mechanical Equipments Pump & Motor Vertical pumps 3000m3/hr @ 170m head (Model-35 M-3 Stage) 6.6 KV , 1850 KW HT Motor Submersible sump pumps 20m3/hr @ 15m head with motor Manually operated CI sluice gates 1.5 m deep x 2m wide Stop log Gates Stop log gates 2m wide x 1.5m ht Coarse Screen MS coarse screens 2m wide x 1.5m ht. EOT Crane Double girder EOT Crane main hoist 25 T, auxiliary hoist 5 T. Span Length -7.0 Mtrs.,Bay length -16 Mtrs., Lift -9 Mtrs. Rubber expansion joints Expansion joints 700mm dia VALVES (PN-25) Motorised butterfly CS valves 700mm dia -Delivery side of each pump CS NRV 700mm dia -Delivery side of each pump 100 NB Air Release valve with Isolation gate valve MS Specials MS Expander 650 mm x 700 mm -Delivery side of each pump Delivery Pipe on each side of pump upto common header-700 NB MS Pipe Flanges and Hardwires Slip on Flange-650 NB Slip on Flange-700 NB Hardwires (Nuts and Bolts) Bolt for Matching Flange-650 NB Bolt for Matching Flange-700 NB Duplex type Filter (10m3 /hr)
3 3 2
Mechanical Equipments Pump & Motor Vertical pumps 2000m3/hr @ 179M head (Model-24H-4 Stage), sump depth increase 6.6 KV , 1300 kW HT Motor Submersible sump pumps 20m3/hr @ 20 m head with motor Manually operated CI sluice gates 1.5 m deep x 2m wide, bottom level 65.0 m, floor level 81.50m Stop log Gates Stop log gates 2m wide x 1.5m ht Coarse Screen MS coarse screens 2m wide x 1.5m ht. EOT Crane Double girder EOT Crane main hoist 10 T, auxiliary hoist 3 T. Span Length -7.0 Mtrs.,Bay length -17 Mtrs., Lift -9 Mtrs. Bay length increase by 1 M. Rubber expansion joints Expansion joints 600mm dia VALVES (PN-25) Motorised butterfly CS valves 600mm dia -Delivery side of each pump CS NRV 600mm dia -Delivery side of each pump 100 NB Air Release valve with Isolation gate valve MS Specials MS Expander 500 mm x 600 mm -Delivery side of each pump Delivery Pipe on each side of pump upto common header-600 NB MS Pipe Flanges and Hardwires Slip on Flange-500 NB Slip on Flange-600 NB Hardwires (Nuts and Bolts) Bolt for Matching Flange-500 NB (3 Set) Bolt for Matching Flange-600 NB (3 Set) Duplex type Filter (15m3 /hr)
4 4 2
Nos Nos No
3 3 1
4 4 1
3 3 3 3 3 3
4 4 4 4
4 4
No No Lot Lot No
3 18 1 1 1
4 24 1 (4 Set) 1 (4 Set) 1
Flowmore Ltd.
1 of 2
10/05/12
Electrical Equipments 6.6 KV HT Switch Gear 6.6 KV HT Switchgear with 630 Amps. VCB & total 9 Nos. feeders as per the SLD. HT Cables for the system 415 V LT Switchgear as per the SLD & 630 Amps. ACB as incomer & bus coupler. Capacitor Banks to enhance the PF to 0.95 Local push Button Stations Earthing Systems (HT Motor+ Aux Transformer+LT Panel) Earthing Strips 50x6 mm GI Strip 25x3 mm Copper Strip Scope of Supply for InstrumentationPressure Gauge-3 Nos. Ultra sonic Level Transmitter-6 Nos Pressure Transmitter-4 Nos. Scpoe or Supply for PLC+VMS Panel+Announciator Panel PLC with Announciator Panel VMS Instrument Cable No. 1
Electrical Equipments 6.6 KV HT Switch Gear 6.6 KV HT Switchgear with 630 Amps. VCB & total 10 Nos. feeders as per the SLD. Increase by One Feeder HT Cables for the system 415 V LT Switchgear as per the SLD & 630 Amps. ACB as incomer & bus coupler. + Addl for spare heater & Actuator 1 each Capacitor Banks to enhance the PF to 0.95 Local push Button Stations Earthing Systems (HT Motor+ Aux th Transformer+LT Panel) Addl for 4 pump th Earthing Strips Addl for 4 pump 50x6 mm GI Strip Addl for 4 pump 25x3 mm Copper Strip Addl for 4 pump Scope of Supply for InstrumentationPressure Gauge-4 Nos. Ultra sonic Level Transmitter- 8 Nos Pressure Transmitter-5 Nos. Scpoe or Supply for PLC+VMS Panel+Announciator Panel PLC with Announciator Panel Increased due to th 4 pump VMS th Instrument Cable Increased due to 4 pump
th th
No.
3 3 1
4 4 1
1 1 1
1 1 1
1 3 1
1 4 1
Flowmore Ltd.
2 of 2
10/05/12