Qty Unit ROADS, PARKING AND PAVED AREAS Excavate trench for kerb average depth 500mm deep commencing at reduced level, grade bottom, part return, fill and well ram and remove surplus excavated material from site. Ditto curved on plan to 1250mm radius. Ditto curved on plan to 2500mm radius. Remove surplus excavated material from site PAVING

Rate

BILL NO.4 EXTERNAL WORKS ROADS, PARKING & PAVED AREAS Cedi/Pesewas

m m m m3

0.00 0.00 0.00 0.00

150mm Imported hardcore filling as described spread, levelled and well rammed and consolidated. 75mm (Average) Bed of sand spread, levelled and well compacted. Provide from approved source gravel sub-base material haul a distance not exceeding 1 km, place, level and compact at optimum moisture content to a thickness of 150mm. Provide from approved source gravel base material, haul a distance not exceeding 1 km, place, level and compact at optimum content to a thickness of 150mm. Provide and lay single bituminous priming treatment with MC2 at the rate of 1 litre per 1 m2 and blind with sand. Provide and lay single bituminous surface treatment with S 125 at the rate of 1.25 litres per m2 including all surface preparation and cover with 100mm chippings applied at the rate of m3 per 75 m2. Plain in-situ concrete (Grade 20) as described in kerb foundation.

m2

0.00

m2

0.00

m2

0.00

m2

0.00

m3

0.00

m2

0.00

m3

0.00

Carried to Collection
4/1

0.00

Item Precast concrete (Grade 25) as described in: B 225 x 150mm Splayed kerb in 900mm length finished fair on all exposed surfaces bedded, jointed and pointed in cement mortar (1:4) including haunching one side with plain concrete (Grade 15) as described. 225 x 150mm Ditto curved on plan to 1250mm radius. 225 x 150mm Ditto curved on plan to 2500mm radius. 200 x 100 x 50mm Paving blocks bedded and pointed on sand bed (measured separately) to falls not exceeding 15 from horizontal.

Qty Unit

Rate

BILL NO.4 EXTERNAL WORKS ROADS, PARKING & PAVED AREAS Cedi/Pesewas

0.00

0.00

0.00

m2

0.00

Carried to Collection COLLECTION Page No. 4/1 " " 4/2

0.00

0.00 0.00

ROADS, PARKING AND PAVED AREAS CARRIED TO SUMMARY OF BILL NO.3

0.00

4/2

Item EXTERNAL SERVICES A Include the provisional sum of xxxxxxxxx xxxxxxxxxxxxxxx (xxxxxxxxxxxxxxx.00) for external services comprising external security lighting, external water supply, external power and telephone connection, electricity and water meters, internet installation, water reservoir and surface water drainage.

Qty

Unit

Rate

BILL NO.4 EXTERNAL WORKS SERVICES Cedi/Pesewas

EXTERNAL SERVICES CARRIED TO SUMMARY OF BILL NO.4

0.00

4/3

Item SUMMARY PAGE NO. 4/2 " " 4/3

Qty Unit

Rate

BILL No.4 EXTERNAL WORKS SUMMARY Cedi/Pesewas

ROADS, PARKING AND PAVED AREAS EXTERNAL SERVICES

0.00

BILL NO. 4 - EXTERNAL WORKS CARRIED TO GENERAL SUMMARY

0.00

4/4