6.

ALL INDIA REGIONWISE GENERATING INSTALLED CAPACITY (MW) OF POWER UTILITIES INCLUDING ALLOCATED SHARES IN JOINT AND CENTRAL SECTOR UTILITIES
REGION Northern Western Southern Eastern N. Eastern Islands All India
THERMAL COAL GAS DSL 29017.50 4421.26 12.99 39424.50 8254.81 17.48 22882.50 4690.78 939.32 22397.88 190.00 17.20 60.00 824.20 142.74 0.00 0.00 70.02 113782.38 18381.05 1199.75 Nuclear TOTAL 33451.75 47696.79 28512.60 22605.08 1026.94 70.02 133363.18 1620.00 1840.00 1320.00 0.00 0.00 0.00 4780.00 (As on 30-04-12 ) HYDRO R.E.S.@ TOTAL
(Renewable) (MNRE)

SL. NO. 1 2 3 4 5 6 7

15122.75 7447.50 11338.03 3882.12 1200.00 0.00 38990.40

4391.40 7909.95 11569.30 398.71 228.00 6.10 24503.45

54585.90 64894.24 52739.93 26885.91 2454.94 76.12 201637.03


31516.87

Captive Genration capacity in industries having demand of 1 MW and above, grid interactive (as on 31-03-10) MW RES -Renewable Energy Sources includes Small Hydro Project(SHP), Biomass Gas(BG), Biomass Power(BP), Urban & Industrial waste Power(U&I), and Wind Energy.
The installed capacity in respect of RES as on 31-03-12 is based on MNRE email dated 10.04.12 received from Ministry of Renewable Energy where cumulative Grid interactive power installed capacity has been indicated as 24914.32 MW .Reconciliation of installed capacity of Hydro capacity resulted in transfer of 135 MW

from conventional to SHP-RES and retrieval of installed capacity of 67.20 from SHP-RES to conventional Hydro has resulted in net addition

of 67.8 MW to SHP under RES.Also 30 MW of capacity in the nature of Waste Heat Recovery Power Plant at Goa Energy Private U&I
Limited under category of RES Out of this installed capacity due to wind and small hydro 508.67 MW appearing in

captive capacity has been deducted to arrive at installed capacity of utilities in respect of RES.
(24914.32-508.67+67.8+30=24503.45)

Note:- UNITS COMMISSIONED, DERATED & DECOMMISSIONED DURING APR.12 1) Sterlite (Jharsuguda) TPP, U-4) of Sterlite Energy Ltd has been commissioned successfully (full load) on 25-04-12
2) Mouda TPP , U-1 (500 MW) of NTPC has been commissioned (Full load) on 19-04-2012 3) Jhajjar TPS(Mahatma Gandhi TPP), U-2 (660 MW) of Jhajjar Power Ltd. has been commissioned successfully(Full load) on 11-04-12

ALL INDIA GENERATING INSTALLED CAPACITY ( MW ) (As on 30-04-12 )

250000 225000 200000 175000 150000 125000 100000 75000 50000 25000 0

201637

133363

38990 4780 Thermal Nuclear Thermal Nuclear Hydro Hydro RES

24503

31516.87

RES Total Captive

Total

Captive

ENERGY SAVED IS ENERGY PRODUCED