Hurontario LRT
Hurontario LRT
Preliminary Design/TPAP
Presentation Scope
Preliminary Design/TPAP
Preliminary Design/TPAP
Preliminary Design/TPAP
Municipal commitment
Investing in completing Preliminary Design/TPAP
Preliminary Design/TPAP
Master Plan
Easy, reliable, frequent, comfortable and convenient light rail transit service is provided throughout the Corridor, with effective connections to other links in the inter-regional transit network Hurontario/Main Street is a beautiful street, with attractive places along the Corridor featuring expanded mobility, vibrant economic activity, and liveable, connected, mixed-use neighbourhoods, integrated with the transportation infrastructure The Regional Urban System and the planned urban structure of each city are recognized and reinforced, and accordingly, mixed use, compact, intensified Transit Oriented Development is present along the Corridor.
Preliminary Design/TPAP
Preliminary Design/TPAP
2/22/2012
Preliminary Design/TPAP
Preliminary Design/TPAP
Maximum Segregation
10
Preliminary Design/TPAP
11
Preliminary Design/TPAP
12
Preliminary Design/TPAP
LRT Stops
13
Preliminary Design/TPAP
14
Preliminary Design/TPAP
http://www.theatlanticcities.com/commute/2012/02/grocery-store-future/1306/
6/1/2012
15
Preliminary Design/TPAP
16
Preliminary Design/TPAP
17
Preliminary Design/TPAP
18
Preliminary Design/TPAP
19
Preliminary Design/TPAP
20
Preliminary Design/TPAP
21
Preliminary Design/TPAP
Project Outputs
Complete Preliminary Design of Hurontario-Main LRT Complete the Transit Project Assessment Process (TPAP) Project Business Case Provide a complete package to enable move to implementation phase
22
Preliminary Design/TPAP
Overview of Program
Nov 2011 May 2012 Nov 2012 May 2013 Nov 2013 PHASE 1 - TPAP PRE-PLANNING PHASE 2 - TPAP
Review & Requirements Concepts & Criteria (Standards) Conceptual Design Preliminary Engineering Environment Pre-Planning TPAP PIC's
Soft Launch
PIC 1
Concept Alternatives (June 2012)
PIC 2
Pref erred Concept (Nov 2012)
PIC 3
Recommended Design (April 2013)
Main Documents
WB0
WB1
(Mar 30 2012)
WB2
(Oct 2012)
WB3
DEPR Draf t EPR (April 2013)
EPR
Final (Aug 2013)
Nov 2011
May 2012
Nov 2012
May 2013
Nov 2013
23
Preliminary Design/TPAP
Preliminary Design/TPAP
www.hurontario-main.ca