Professional Documents
Culture Documents
CO2 Pipeline - SECARB, Plant Barry To Citronelle
CO2 Pipeline - SECARB, Plant Barry To Citronelle
NYSE: DNR
x x
x x
Our Company
Denbury Resources Inc. (NYSE: DNR):
A growing independent oil and gas company Approximately 1309 employees (578 in Plano,731 in the field) The largest oil and natural gas operator in Mississippi and Montana Owns the largest reserves of CO2 used for tertiary oil recovery east of the
Mississippi River
x x
2
Rockies
MT
Greencore Pipeline Lost Cabin
ND
ID
SD
WY
IL IN
Anadarko Line
Grieve (TBC)
KY
MS
Existing CO2 Pipelines CO2 Pipelines Under Development Rocky Mountain Fields With EOR Potential Existing Anthropogenic CO2 Sources Proposed Coal to Gas or Liquids CO2 Source Owned or Contracted
Gulf Coast
TX
Jackson Dome
NEJD Pipeline
LA
Green Pipeline
Delta Line
Tinsley Delhi
Green Line
Oyster Bayou Hastings Seabreeze Conroe (TBC) Thompson (TBC)
x x
3
x x
4
x x
5
Current Well Spacing: 40 acres Original GOR = 244 cft/bbl in Rodessa and 104 cft/bbl in Sligo Oil Gravity (43-45 degrees API) Water flood June 1961 to present Cumulative Production approximately 165 MMBO
(Estimated Primary cum production approximately 52 MMBO) Estimated OOIP between 300-500 MMBO
x x
6
Depositional Model
Tidal Channel / Tidal Flat / Estuarine Environment Brackish water; semi-arid climate; pedogenic features Abundant bioturbation (even within channel deposits) Modern-day analogy = Indus Delta
x x
7
x x
8
Right-of-Way 1 mi (2 km) inside Plant Barry property > 8 mi (13 km) along existing power corridor 2 mi (3 km) undisturbed forested land Permanent cleared width 20 ft (6 m) Temporary construction width 40 ft (12 m) Right-of-Way habitat 9 mi (14.5 km) of forested and commerical
timber land 3 mi (5 km) of emergent, shrub and forested wetlands Endangered Gopher Tortoise habitat
110 burrows in or adjacent to construction area
x x
9
x x
x x
11
x x
12
Pipeline was commissioned March 8, 2012 At custody meter station there is the capability of
taking samples of CO2 stream. Samples will be taken periodically for permits and GHG reporting. Sample obtained for Class V injection permit showed 99.6% pure CO2. Major impurities were Nitrogen (2700 ppm)
Line was filled with N2 to pressure test line then swept with CO2 prior to commissioning Lab impurity?
x x
13
x x
14
x x
15
x x
16