NPL ETP Sheikhupura Factory Activity ID Activity Name Original Early Start Duration 11 15-Nov-11 1 15-Nov-11 Contract Award

Notice To Proceed 1 15-Nov-11 0 16-Nov-11 10 16-Nov-11 10 16-Nov-11 7 16-Nov-11 7 16-Nov-11 6 16-Nov-11 2 16-Nov-11 4 18-Nov-11 79 23-Nov-11 15 23-Nov-11 5 23-Nov-11 4 28-Nov-11 5 28-Nov-11 5 28-Nov-11 1 02-Dec-11 5 03-Dec-11 5 03-Dec-11 5 03-Dec-11 1 02-Dec-11 1 02-Dec-11 64 03-Dec-11 7 03-Dec-11 2 10-Dec-11 1 12-Dec-11 20 16-Jan-12 51 13-Dec-11 2 13-Dec-11 7 15-Dec-11 12 19-Dec-11 3 21-Dec-11 4 21-Dec-11 1 22-Dec-11 1 24-Dec-11 2 24-Dec-11 1 25-Dec-11 4 27-Dec-11 12 28-Dec-11 1 30-Dec-11 1 31-Dec-11 4 02-Jan-12 1 05-Jan-12 1 06-Jan-12 4 09-Jan-12 1 12-Jan-12 1 13-Jan-12 Summary 25-Nov-11 25-Nov-11 22-Nov-11 22-Nov-11 21-Nov-11 17-Nov-11 21-Nov-11 09-Feb-12 07-Dec-11 27-Nov-11 01-Dec-11 02-Dec-11 02-Dec-11 02-Dec-11 07-Dec-11 07-Dec-11 07-Dec-11 02-Dec-11 02-Dec-11 04-Feb-12 09-Dec-11 11-Dec-11 12-Dec-11 04-Feb-12 01-Feb-12 14-Dec-11 21-Dec-11 30-Dec-11 23-Dec-11 24-Dec-11 22-Dec-11 24-Dec-11 25-Dec-11 25-Dec-11 30-Dec-11 08-Jan-12 30-Dec-11 31-Dec-11 05-Jan-12 05-Jan-12 06-Jan-12 12-Jan-12 12-Jan-12 13-Jan-12 Early Finish 25-Nov-11 16-Nov-11 15-Nov-11 Total4, 2011 Float Nov 229 229 0 229 229 229 0 0 142 142 142 223 287 0 223 254 282 235 287 254 254 223 223 223 223 223 223 223 231 223 223 223 269 223 270 223 269 223 223 233 223 223 223 223 223 223 223 223

Classic Schedule Layout 1 Qtr 1, 2012 Dec 25-Nov-11, General 16-Nov-11, General Contract Award Notice To Proceed 25-Nov-11, Mobilization Mobilization 22-Nov-11, Design Development Submission and Approval of Concept Design 21-Nov-11, Existing Conditions Survey of Site Geotechnical Investigations 09-Feb-12, Equalization Tank 07-Dec-11, Design Development Finalization of Mechanical Engineering Design of ET Finalization of Civil Engineering Design of ET Finalization of Mechanical Detailed Design of ET Finalization of E&I Engineering Design of ET Finalization of Civil Detailed Design of ET Finalization of E&I Detailed Design of ET 07-Dec-11, Procurement Procurement of Embedded Items for ET 02-Dec-11, Existing Conditions Layout of Equalization Tank 04-Feb-12, Earthwork Excavation for ET Levelling and Bed Dressing of ET Chemical Termite Proofing of ET Backfilling and Compaction of ET 01-Feb-12, Concrete PCC 1:4:8 of ET Steel Fixing of Raft of ET Steel Fixing of Walls Upto 3.5m of ET Formwork for Raft of ET Formwork for Pour-1 of walls of ET Fixing of Water Stopper at Raft and Walls Joint of ET Fixing of Water Stopper at Walls for Pour-1 of ET Concrete pouring at Raft of ET Walls Concrete pour-1 of ET Formwork for Pour-2 of walls of ET Steel Fixing of Walls from 3.5m to Top of ET Fixing of Water Stopper at Walls for Pour-2 of ET Walls Concrete pour-2 of ET Formwork for Pour-3 of walls of ET Fixing of Water Stopper at Walls for Pour-3 of ET Walls Concrete pour-3 of ET Formwork for Pour-4 of walls of ET Fixing of Water Stopper at Walls for Pour-4 of ET Walls Concrete pour-4 of ET Page 1 of 16 TASK filter: All Activities Jan Feb Mar Apr Qtr 2, 2012 May Jun Jul Qtr 3, 2012 Aug Sep

19-Apr-12 11:02 Qtr 4, 2012 Oct

General
General
NPL01 NPL01

Mobilization Mobiliz
NPL02 Mobilization

Design Development
NPL03 Submission and Approval of Concept Design

Existing Existin Conditions


NPL05 NPL05 Survey of Site Geotechnical Investigations

Equalization Tank Equaliza


Design Development
NPL03 NPL03 NPL03 NPL03 NPL03 NPL03 Finalization of Mechanical Engineering Design Finalization of Civil Engineering Design of ET Finalization of Mechanical Detailed Design of E Finalization of E&I Engineering Design of ET Finalization of Civil Detailed Design of ET Finalization of E&I Detailed Design of ET

Procurement Procur
NPL04 Procurement of Embedded Items for ET

Existing Existin Conditions


NPL05 Layout of Equalization Tank

Earthwork Earthw
NPL05 NPL05 NPL05 NPL05 Excavation for ET Levelling and Bed Dressing of ET Chemical Termite Proofing of ET Backfilling and Compaction of ET

Concrete Concre
NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 PCC 1:4:8 of ET Steel Fixing of Raft of ET Steel Fixing of Walls Upto 3.5m of ET Formwork for Raft of ET Formwork for Pour-1 of walls of ET Fixing of Water Stopper at Raft and Walls Join Fixing of Water Stopper at Walls for Pour-1 of Concrete pouring at Raft of ET Walls Concrete pour-1 of ET Formwork for Pour-2 of walls of ET Steel Fixing of Walls from 3.5m to Top of ET Fixing of Water Stopper at Walls for Pour-2 of Walls Concrete pour-2 of ET Formwork for Pour-3 of walls of ET Fixing of Water Stopper at Walls for Pour-3 of Walls Concrete pour-3 of ET Formwork for Pour-4 of walls of ET Fixing of Water Stopper at Walls for Pour-4 of Walls Concrete pour-4 of ET Critical Remaining Work Milestone

Actual Work Remaining Work

Oracle Corporation

NPL ETP Sheikhupura Factory Activity ID NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 Activity Name Steel Fixing of Channels,Slab and Walkway of Formwork for Pour-5 of walls of ET Fixing of Water Stopper at Walls for Pour-5 of Walls Concrete pour-5 of ET Formwork for Pour-6 of walls of ET Fixing of Water Stopper at Walls for Pour-6 of Fixing of Water Stopper at Walls for Channels Formwork for Channels, Walkways & Slab of E Walls Concrete pour-6 of ET Concrete pouring of Channels, Slab & Walkwa Original Early Start Duration 10 16-Jan-12 4 16-Jan-12 1 19-Jan-12 1 20-Jan-12 4 23-Jan-12 1 26-Jan-12 1 26-Jan-12 5 26-Jan-12 1 27-Jan-12 2 31-Jan-12 33 08-Jan-12 Installation of Enbedded Items at Walls Pour-4 Installation of Enbedded Items at Walls Pour-5 Installation of Enbedded Items at Walls Pour-6 Installation of Angle Iron Sections at ET Installation of Metallic Grating at ET Installation of Railing at ET Installation of Stairs at ET 4 08-Jan-12 4 15-Jan-12 4 22-Jan-12 4 26-Jan-12 3 02-Feb-12 4 04-Feb-12 5 05-Feb-12 20 11-Jan-12 20 11-Jan-12 0 09-Feb-12 0 166 28-Nov-11 15 28-Nov-11 5 28-Nov-11 5 03-Dec-11 5 03-Dec-11 5 03-Dec-11 1 08-Dec-11 5 08-Dec-11 10 08-Dec-11 10 08-Dec-11 1 08-Dec-11 1 08-Dec-11 150 09-Dec-11 18 09-Dec-11 3 27-Dec-11 1 30-Dec-11 25 12-Apr-12 120 31-Dec-11 5 31-Dec-11 18 02-Jan-12 25 06-Jan-12 7 08-Jan-12 2 13-Jan-12 2 15-Jan-12 25 19-Jan-12 7 19-Jan-12 Early Finish 25-Jan-12 19-Jan-12 19-Jan-12 20-Jan-12 26-Jan-12 26-Jan-12 26-Jan-12 30-Jan-12 27-Jan-12 01-Feb-12 09-Feb-12 12-Jan-12 19-Jan-12 26-Jan-12 30-Jan-12 04-Feb-12 07-Feb-12 09-Feb-12 30-Jan-12 30-Jan-12 09-Feb-12 09-Feb-12 11-May-12 12-Dec-11 02-Dec-11 07-Dec-11 07-Dec-11 07-Dec-11 08-Dec-11 12-Dec-11 17-Dec-11 17-Dec-11 08-Dec-11 08-Dec-11 06-May-12 26-Dec-11 29-Dec-11 30-Dec-11 06-May-12 28-Apr-12 04-Jan-12 19-Jan-12 30-Jan-12 14-Jan-12 14-Jan-12 16-Jan-12 12-Feb-12 25-Jan-12 Total4, 2011 Float Nov 224 223 223 223 223 223 228 224 223 224 223 224 224 224 225 228 225 223 223 223 223 223 131 282 0 131 154 282 155 282 154 154 131 131 131 131 131 131 131 144 131 131 131 131 131 131 173 131

Classic Schedule Layout 1 Qtr 1, 2012 Dec Jan Feb Mar Apr Steel Fixing of Channels,Slab and Walkway of ET Formwork for Pour-5 of walls of ET Fixing of Water Stopper at Walls for Pour-5 of ET Walls Concrete pour-5 of ET Formwork for Pour-6 of walls of ET Fixing of Water Stopper at Walls for Pour-6 of ET Fixing of Water Stopper at Walls for Channels of ET Formwork for Channels, Walkways & Slab of ET Walls Concrete pour-6 of ET Concrete pouring of Channels, Slab & Walkways of ET 09-Feb-12, Metals Installation of Enbedded Items at Walls Pour-4 of ET Installation of Enbedded Items at Walls Pour-5 of ET Installation of Enbedded Items at Walls Pour-6 of ET Installation of Angle Iron Sections at ET Installation of Metallic Grating at ET Installation of Railing at ET Installation of Stairs at ET 30-Jan-12, Finishes External Bituminous Coating at ET 09-Feb-12, Handing Over To Mechanical Team Equalization Tank Handing Over to Mechanical Team 11-May-12, Oxidation Ditch 12-Dec-11, Design Development Finalization of Mechanical Engineering Design of OD Finalization of Civil Engineering Design of OD Finalization of Mechanical Detailed Design of OD Finalization of E&I Engineering Design of OD Finalization of Civil Detailed Design of OD Finalization of E&I Detailed Design of OD 17-Dec-11, Procurement Procurement of Embedded Items for OD 08-Dec-11, Existing Conditions Layout of Oxidation Ditch 06-May-12, Earthwork Excavation for OD Levelling and Bed Dressing of OD Chemical Termite Proofing of OD Backfilling and Compaction of OD 28-Apr-12, Concrete PCC 1:4:8 of OD Steel Fixing of Raft of OD Steel Fixing of Walls Upto 3.5m of OD Formwork for Pour-1 of walls of OD Fixing of Water Stopper at Walls for Pour-1 of OD Walls Concrete pour-1 of OD Steel Fixing of Walls from 3.5m to Top of OD Formwork for Pour-2 of walls of OD Page 2 of 16 TASK filter: All Activities Qtr 2, 2012 May Jun Jul Qtr 3, 2012 Aug Sep

19-Apr-12 11:02 Qtr 4, 2012 Oct

Metals
NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05

Finishes Finishe
NPL05 External Bituminous Coating at ET

Handing Handin Over To Mechanical Team


NPL05 Equalization Tank Handing Over to Mechanica

Oxidation Oxidatio Ditch


Design Development
NPL03 NPL03 NPL03 NPL03 NPL03 NPL03 Finalization of Mechanical Engineering Design Finalization of Civil Engineering Design of OD Finalization of Mechanical Detailed Design of O Finalization of E&I Engineering Design of OD Finalization of Civil Detailed Design of OD Finalization of E&I Detailed Design of OD

Procurement Procur
NPL04 Procurement of Embedded Items for OD

Existing Existin Conditions


NPL05 Layout of Oxidation Ditch

Earthwork Earthw
NPL05 NPL05 NPL05 NPL05 Excavation for OD Levelling and Bed Dressing of OD Chemical Termite Proofing of OD Backfilling and Compaction of OD

Concrete Concre
NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 PCC 1:4:8 of OD Steel Fixing of Raft of OD Steel Fixing of Walls Upto 3.5m of OD Formwork for Pour-1 of walls of OD Fixing of Water Stopper at Walls for Pour-1 of Walls Concrete pour-1 of OD Steel Fixing of Walls from 3.5m to Top of OD Formwork for Pour-2 of walls of OD

Actual Work Remaining Work

Critical Remaining Work Milestone

Summary

Oracle Corporation

NPL ETP Sheikhupura Factory Activity ID NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 Activity Name Fixing of Water Stopper at Raft and Walls Join Formwork for Raft of OD Fixing of Water Stopper at Walls for Pour-2 of Walls Concrete pour-2 of OD Concrete pouring at Raft of OD Formwork for Pour-3 of walls of OD Fixing of Water Stopper at Walls for Pour-3 of Walls Concrete pour-3 of OD Formwork for Pour-4 of walls of OD Fixing of Water Stopper at Walls for Pour-4 of Walls Concrete pour-4 of OD Formwork for Pour-5 of walls of OD Fixing of Water Stopper at Walls for Pour-5 of Walls Concrete pour-5 of OD Formwork for Pour-6 of walls of OD Fixing of Water Stopper at Walls for Pour-6 of Walls Concrete pour-6 of OD Steel Fixing of Slab and Walkway of OD Formwork for Pour-7 of walls of OD Fixing of Water Stopper at Walls for Pour-7 of Walls Concrete pour-7 of OD Formwork for Slab and Walkway of OD Formwork for Pour-8 of walls of OD Fixing of Water Stopper at Walls for Pour-8 of Walls Concrete pour-8 of OD Concrete pouring of Slab & Walkway of OD Formwork for Pour-9 of walls of OD Fixing of Water Stopper at Walls for Pour-9 of Walls Concrete pour-9 of OD Formwork for Pour-10 of walls of OD Fixing of Water Stopper at Walls for Pour-10 o Walls Concrete pour-10 of OD Original Early Start Duration 2 20-Jan-12 8 20-Jan-12 2 24-Jan-12 2 26-Jan-12 6 28-Jan-12 7 30-Jan-12 2 04-Feb-12 2 06-Feb-12 7 10-Feb-12 2 15-Feb-12 2 17-Feb-12 7 21-Feb-12 2 26-Feb-12 2 28-Feb-12 7 03-Mar-12 2 08-Mar-12 2 10-Mar-12 10 14-Mar-12 7 14-Mar-12 2 19-Mar-12 2 21-Mar-12 10 24-Mar-12 7 25-Mar-12 2 01-Apr-12 2 03-Apr-12 5 03-Apr-12 7 07-Apr-12 2 14-Apr-12 2 14-Apr-12 7 18-Apr-12 2 25-Apr-12 2 27-Apr-12 123 10-Jan-12 Installation of Enbedded Items at Walls Pour-1 Installation of Enbedded Items at Walls Pour-2 Installation of Monkey Ladder at ET Installation of Enbedded Items at Walls Pour-3 Installation of Enbedded Items at Walls Pour-4 Installation of Enbedded Items at Walls Pour-5 Installation of Enbedded Items at Walls Pour-6 Installation of Enbedded Items at Walls Pour-7 Installation of Enbedded Items at Walls Pour-8 Installation of Enbedded Items at Walls Pour-9 Installation of Railing at OD Installation of Enbedded Items at Walls Pour-1 Installation of Monkey Ladder at OD Installation of Stairs at OD 4 10-Jan-12 4 21-Jan-12 3 30-Jan-12 4 01-Feb-12 4 12-Feb-12 4 23-Feb-12 4 05-Mar-12 4 16-Mar-12 4 27-Mar-12 4 09-Apr-12 5 10-Apr-12 4 20-Apr-12 3 01-May-12 5 07-May-12 25 07-Apr-12 25 07-Apr-12 0 11-May-12 Summary Early Finish 21-Jan-12 27-Jan-12 25-Jan-12 27-Jan-12 02-Feb-12 05-Feb-12 05-Feb-12 07-Feb-12 16-Feb-12 16-Feb-12 18-Feb-12 27-Feb-12 27-Feb-12 29-Feb-12 09-Mar-12 09-Mar-12 11-Mar-12 23-Mar-12 20-Mar-12 20-Mar-12 22-Mar-12 02-Apr-12 31-Mar-12 02-Apr-12 04-Apr-12 07-Apr-12 13-Apr-12 15-Apr-12 15-Apr-12 24-Apr-12 26-Apr-12 28-Apr-12 11-May-12 14-Jan-12 25-Jan-12 01-Feb-12 05-Feb-12 16-Feb-12 27-Feb-12 09-Mar-12 20-Mar-12 31-Mar-12 13-Apr-12 14-Apr-12 24-Apr-12 03-May-12 11-May-12 01-May-12 01-May-12 11-May-12 Total4, 2011 Float Nov 236 230 131 131 230 131 131 131 131 131 131 131 131 131 131 131 131 158 131 131 131 158 131 131 131 158 131 157 131 131 131 131 131 132 132 231 132 132 132 132 132 134 132 158 134 139 131 131 131 131

Classic Schedule Layout 1 Qtr 1, 2012 Dec Jan Feb Mar Apr Fixing of Water Stopper at Raft and Walls Joint of OD Formwork for Raft of OD Fixing of Water Stopper at Walls for Pour-2 of OD Walls Concrete pour-2 of OD Concrete pouring at Raft of OD Formwork for Pour-3 of walls of OD Fixing of Water Stopper at Walls for Pour-3 of OD Walls Concrete pour-3 of OD Formwork for Pour-4 of walls of OD Fixing of Water Stopper at Walls for Pour-4 of OD Walls Concrete pour-4 of OD Formwork for Pour-5 of walls of OD Fixing of Water Stopper at Walls for Pour-5 of OD Walls Concrete pour-5 of OD Formwork for Pour-6 of walls of OD Fixing of Water Stopper at Walls for Pour-6 of OD Walls Concrete pour-6 of OD Steel Fixing of Slab and Walkway of OD Formwork for Pour-7 of walls of OD Fixing of Water Stopper at Walls for Pour-7 of OD Walls Concrete pour-7 of OD Formwork for Slab and Walkway of OD Formwork for Pour-8 of walls of OD Fixing of Water Stopper at Walls for Pour-8 of OD Walls Concrete pour-8 of OD Concrete pouring of Slab & Walkway of OD Formwork for Pour-9 of walls of OD Fixing of Water Stopper at Walls for Pour-9 of OD Walls Concrete pour-9 of OD Formwork for Pour-10 of walls of OD Fixing of Water Stopper at Walls for Pour-10 of OD Walls Concrete pour-10 of OD 11-May-12, Metals Installation of Enbedded Items at Walls Pour-1 of OD Installation of Enbedded Items at Walls Pour-2 of OD Installation of Monkey Ladder at ET Installation of Enbedded Items at Walls Pour-3 of OD Installation of Enbedded Items at Walls Pour-4 of OD Installation of Enbedded Items at Walls Pour-5 of OD Installation of Enbedded Items at Walls Pour-6 of OD Installation of Enbedded Items at Walls Pour-7 of OD Installation of Enbedded Items at Walls Pour-8 of OD Installation of Enbedded Items at Walls Pour-9 of OD Installation of Railing at OD Installation of Enbedded Items at Walls Pour-10 of OD Installation of Monkey Ladder at OD Installation of Stairs at OD 01-May-12, Finishes External Bituminous Coating at OD 11-May-12, Handing Over To Mechanical Team Page 3 of 16 TASK filter: All Activities Qtr 2, 2012 May Jun Jul Qtr 3, 2012 Aug Sep

19-Apr-12 11:02 Qtr 4, 2012 Oct

Metals
NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05

Finishes Finishe
NPL05 External Bituminous Coating at OD

Handing Handin Over To Mechanical Team


Actual Work Remaining Work Critical Remaining Work Milestone

Oracle Corporation

NPL ETP Sheikhupura Factory Activity ID NPL05 Activity Name Oxidation Ditch Handing Over to Mechanical T Original Early Start Duration 0 124 02-Jan-12 15 02-Jan-12 5 02-Jan-12 5 07-Jan-12 5 07-Jan-12 5 07-Jan-12 1 12-Jan-12 5 12-Jan-12 15 12-Jan-12 15 12-Jan-12 1 12-Jan-12 1 12-Jan-12 113 13-Jan-12 5 13-Jan-12 1 18-Jan-12 1 19-Jan-12 2 01-Feb-12 10 25-Apr-12 104 20-Jan-12 1 20-Jan-12 2 03-Feb-12 15 05-Feb-12 6 19-Feb-12 2 20-Feb-12 2 25-Feb-12 7 27-Feb-12 4 27-Feb-12 3 04-Mar-12 1 05-Mar-12 2 07-Mar-12 7 09-Mar-12 2 16-Mar-12 7 18-Mar-12 1 25-Mar-12 7 29-Mar-12 2 05-Apr-12 12 07-Apr-12 2 19-Apr-12 6 23-Apr-12 5 23-Apr-12 2 28-Apr-12 4 29-Apr-12 87 27-Jan-12 Laying of Cast Iron Pipes Before 2nd Stage Le Installation of Embedded Items at Column(s) o Installation of Embedded Items at Walls Pour-1 Installation of Embedded Items at Walls Pour-2 Installation of Embedded Items at Centeral We Critical Remaining Work Milestone 5 27-Jan-12 2 02-Mar-12 4 05-Mar-12 4 25-Mar-12 4 19-Apr-12 Summary Early Finish 11-May-12 04-May-12 16-Jan-12 06-Jan-12 11-Jan-12 11-Jan-12 11-Jan-12 12-Jan-12 16-Jan-12 26-Jan-12 26-Jan-12 12-Jan-12 12-Jan-12 04-May-12 17-Jan-12 18-Jan-12 19-Jan-12 02-Feb-12 04-May-12 02-May-12 20-Jan-12 04-Feb-12 19-Feb-12 24-Feb-12 21-Feb-12 26-Feb-12 04-Mar-12 01-Mar-12 06-Mar-12 05-Mar-12 08-Mar-12 15-Mar-12 17-Mar-12 24-Mar-12 25-Mar-12 04-Apr-12 06-Apr-12 18-Apr-12 20-Apr-12 28-Apr-12 27-Apr-12 29-Apr-12 02-May-12 22-Apr-12 31-Jan-12 03-Mar-12 08-Mar-12 28-Mar-12 22-Apr-12 Total4, 2011 Float Nov 131 138 247 120 126 120 247 161 247 120 120 126 126 138 126 126 126 138 138 140 126 138 138 138 141 138 138 169 169 148 169 138 138 138 148 138 138 140 150 140 143 143 140 143 120 169 138 138 143

Classic Schedule Layout 1 Qtr 1, 2012 Dec Jan Feb Mar Apr Qtr 2, 2012 May Jun Jul Qtr 3, 2012 Aug Sep

19-Apr-12 11:02 Qtr 4, 2012 Oct

Oxidation Ditch Handing Over to Mechanical Team 04-May-12, Secondary Clarifier-1 16-Jan-12, Design Development Finalization of Mechanical Engineering Design of SC # 1 Finalization of Civil Engineering Design of SC # 1 Finalization of Mechanical Detailed Design of SC # 1 Finalization of E&I Engineering Design of SC # 1 Finalization of Civil Detailed Design of SC # 1 Finalization of E&I Detailed Design of SC # 1 26-Jan-12, Procurement Procurement of Embedded Items for SC # 1 12-Jan-12, Existing Conditions Layout of Secondary Clarifier # 1 04-May-12, Earthwork Excavation for SC # 1 Levelling and Bed Dressing of SC # 1 Chemical Termite Proofing of SC # 1 Backfilling and Compaction After Laying CI Pipes at SC # 1 Backfilling and Compaction outside walls at SC # 1 02-May-12, Concrete Stage-1 Lean Concrete(PCC 1:4:8) at SC # 1 Stage-2 Lean Concrete(PCC 1:4:8) at SC # 1 Steel fixing of Raft of SC # 1 Formwork of Raft at SC # 1 Fixing of Water Stopper at Raft and Wall Joint of SC # 1 Concrete pouring of Raft at SC # 1 Steel fixing of Walls Pour-1 of SC # 1 Steel fixing of Columns of SC # 1 Formwork of Columns at SC # 1 Fixing of Water Stopper at Wall Pour-1 of SC # 1 Concrete of Columns at SC # 1 Formwork of Wall Pour-1 at SC # 1 Concrete of Wall Pour-1 at SC # 1 Steel fixing of Walls Pour-2 of SC # 1 Fixing of Water Stopper at Wall Pour-2 of SC # 1 Formwork of Wall Pour-2 at SC # 1 Concrete of Wall Pour-2 at SC # 1 Steel fixing of Centeral Well, Channels and Manholes of SC # 1 Fixing of Water Stopper at Well of SC # 1 Formwork of Channel and Manhole at SC # 1 Formwork of Centeral Well at SC # 1 Concrete of Centeral Well at SC # 1 Concrete of Channel and Manhole at SC # 1 22-Apr-12, Metals Laying of Cast Iron Pipes Before 2nd Stage Lean concrete at SC # 1 Installation of Embedded Items at Column(s) of SC # 1 Installation of Embedded Items at Walls Pour-1 of SC # 1 Installation of Embedded Items at Walls Pour-2 of SC # 1 Installation of Embedded Items at Centeral Well of SC # 1 Page 4 of 16 TASK filter: All Activities Oracle Corporation

Secondary Clarifier-1 Second


Design Development
NPL03 NPL03 NPL03 NPL03 NPL03 NPL03 Finalization of Mechanical Engineering Design Finalization of Civil Engineering Design of SC # Finalization of Mechanical Detailed Design of S Finalization of E&I Engineering Design of SC # Finalization of Civil Detailed Design of SC # 1 Finalization of E&I Detailed Design of SC # 1

Procurement Procur
NPL04 Procurement of Embedded Items for SC # 1

Existing Existin Conditions


NPL05 Layout of Secondary Clarifier # 1

Earthwork Earthw
NPL05 NPL05 NPL05 NPL05 NPL05 Excavation for SC # 1 Levelling and Bed Dressing of SC # 1 Chemical Termite Proofing of SC # 1 Backfilling and Compaction After Laying CI Pip Backfilling and Compaction outside walls at SC

Concrete Concre
NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 Stage-1 Lean Concrete(PCC 1:4:8) at SC # 1 Stage-2 Lean Concrete(PCC 1:4:8) at SC # 1 Steel fixing of Raft of SC # 1 Formwork of Raft at SC # 1 Fixing of Water Stopper at Raft and Wall Joint Concrete pouring of Raft at SC # 1 Steel fixing of Walls Pour-1 of SC # 1 Steel fixing of Columns of SC # 1 Formwork of Columns at SC # 1 Fixing of Water Stopper at Wall Pour-1 of SC # Concrete of Columns at SC # 1 Formwork of Wall Pour-1 at SC # 1 Concrete of Wall Pour-1 at SC # 1 Steel fixing of Walls Pour-2 of SC # 1 Fixing of Water Stopper at Wall Pour-2 of SC # Formwork of Wall Pour-2 at SC # 1 Concrete of Wall Pour-2 at SC # 1 Steel fixing of Centeral Well, Channels and Ma Fixing of Water Stopper at Well of SC # 1 Formwork of Channel and Manhole at SC # 1 Formwork of Centeral Well at SC # 1 Concrete of Centeral Well at SC # 1 Concrete of Channel and Manhole at SC # 1

Metals
NPL05 NPL05 NPL05 NPL05 NPL05

Actual Work Remaining Work

NPL ETP Sheikhupura Factory Activity ID NPL05 Activity Name Installation of Embedded Items at Manholes of Original Early Start Duration 4 19-Apr-12 18 07-Apr-12 18 07-Apr-12 0 02-May-12 0 129 02-Jan-12 15 02-Jan-12 5 02-Jan-12 5 07-Jan-12 5 07-Jan-12 5 07-Jan-12 1 12-Jan-12 5 12-Jan-12 5 12-Jan-12 5 12-Jan-12 1 12-Jan-12 1 12-Jan-12 106 13-Jan-12 5 13-Jan-12 1 18-Jan-12 1 19-Jan-12 2 26-Jan-12 10 18-Apr-12 111 20-Jan-12 1 20-Jan-12 2 28-Jan-12 15 30-Jan-12 2 14-Feb-12 7 14-Feb-12 3 21-Feb-12 10 24-Feb-12 6 24-Feb-12 7 03-Mar-12 2 05-Mar-12 8 09-Mar-12 4 10-Mar-12 3 17-Mar-12 10 20-Mar-12 1 30-Mar-12 10 03-Apr-12 3 13-Apr-12 9 16-Apr-12 1 25-Apr-12 8 29-Apr-12 8 29-Apr-12 3 07-May-12 2 07-May-12 99 21-Jan-12 Early Finish 22-Apr-12 24-Apr-12 24-Apr-12 02-May-12 02-May-12 09-May-12 16-Jan-12 06-Jan-12 11-Jan-12 11-Jan-12 11-Jan-12 12-Jan-12 16-Jan-12 16-Jan-12 16-Jan-12 12-Jan-12 12-Jan-12 27-Apr-12 17-Jan-12 18-Jan-12 19-Jan-12 27-Jan-12 27-Apr-12 09-May-12 20-Jan-12 29-Jan-12 13-Feb-12 15-Feb-12 20-Feb-12 23-Feb-12 04-Mar-12 29-Feb-12 09-Mar-12 06-Mar-12 16-Mar-12 13-Mar-12 19-Mar-12 29-Mar-12 30-Mar-12 12-Apr-12 15-Apr-12 24-Apr-12 25-Apr-12 06-May-12 06-May-12 09-May-12 08-May-12 28-Apr-12 Total4, 2011 Float Nov 140 138 138 140 140 133 247 0 126 130 247 150 247 130 130 126 126 145 126 126 126 133 145 133 126 133 133 138 133 133 133 166 166 143 133 166 133 133 146 133 133 133 145 133 134 133 134 134

Classic Schedule Layout 1 Qtr 1, 2012 Dec Jan Feb Mar Apr Qtr 2, 2012 May 24-Apr-12, Finishes External Bituminous Coating at SC # 1 02-May-12, Handing Over To Mechanical Team Sec. Clarifier #1 Handing Over to Mechanical Team 09-May-12, Secondary Clarifier-2 16-Jan-12, Design Development Finalization of Mechanical Engineering Design of SC # 2 Finalization of Civil Engineering Design of SC # 2 Finalization of Mechanical Detailed Design of SC # 2 Finalization of E&I Engineering Design of SC # 2 Finalization of Civil Detailed Design of SC # 2 Finalization of E&I Detailed Design of SC # 2 16-Jan-12, Procurement Procurement of Embedded Items for SC # 2 12-Jan-12, Existing Conditions Layout of Secondary Clarifier # 2 27-Apr-12, Earthwork Excavation for SC # 2 Levelling and Bed Dressing of SC # 2 Chemical Termite Proofing of SC # 2 Backfilling and Compaction After Laying CI Pipes at SC # 2 Backfilling and Compaction outside walls at SC # 2 09-May-12, Concrete Stage-1 Lean Concrete(PCC 1:4:8) at SC # 2 Stage-2 Lean Concrete(PCC 1:4:8) at SC # 2 Steel fixing of Raft of SC # 2 Fixing of Water Stopper at Raft and Wall Joint of SC # 2 Formwork of Raft at SC # 2 Concrete pouring of Raft at SC # 2 Steel fixing of Walls Pour-1 of SC # 2 Steel fixing of Columns of SC # 2 Formwork of Columns at SC # 2 Fixing of Water Stopper at Wall Pour-1 of SC # 2 Formwork of Wall Pour-1 at SC # 2 Concrete of Columns at SC # 2 Concrete of Wall Pour-1 at SC # 2 Steel fixing of Walls Pour-2 of SC # 2 Fixing of Water Stopper at Wall Pour-2 of SC # 2 Formwork of Wall Pour-2 at SC # 2 Concrete of Wall Pour-2 at SC # 2 Steel fixing of Centeral Well, Channels and Manholes of SC # 2 Fixing of Water Stopper at Well of SC # 2 Formwork of Channel and Manhole at SC # 2 Formwork of Centeral Well at SC # 2 Concrete of Channel and Manhole at SC # 2 Concrete of Centeral Well at SC # 2 28-Apr-12, Metals Jun Jul Installation of Embedded Items at Manholes of SC # 1 Qtr 3, 2012 Aug Sep

19-Apr-12 11:02 Qtr 4, 2012 Oct

Finishes Finishe
NPL05 External Bituminous Coating at SC # 1

Handing Handin Over To Mechanical Team


NPL05 Sec. Clarifier #1 Handing Over to Mechanical T

Secondary Clarifier-2 Second


Design Development
NPL03 NPL03 NPL03 NPL03 NPL03 NPL03 Finalization of Mechanical Engineering Design Finalization of Civil Engineering Design of SC # Finalization of Mechanical Detailed Design of S Finalization of E&I Engineering Design of SC # Finalization of Civil Detailed Design of SC # 2 Finalization of E&I Detailed Design of SC # 2

Procurement Procur
NPL04 Procurement of Embedded Items for SC # 2

Existing Existin Conditions


NPL05 Layout of Secondary Clarifier # 2

Earthwork Earthw
NPL05 NPL05 NPL05 NPL05 NPL05 Excavation for SC # 2 Levelling and Bed Dressing of SC # 2 Chemical Termite Proofing of SC # 2 Backfilling and Compaction After Laying CI Pip Backfilling and Compaction outside walls at SC

Concrete Concre
NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 Stage-1 Lean Concrete(PCC 1:4:8) at SC # 2 Stage-2 Lean Concrete(PCC 1:4:8) at SC # 2 Steel fixing of Raft of SC # 2 Fixing of Water Stopper at Raft and Wall Joint Formwork of Raft at SC # 2 Concrete pouring of Raft at SC # 2 Steel fixing of Walls Pour-1 of SC # 2 Steel fixing of Columns of SC # 2 Formwork of Columns at SC # 2 Fixing of Water Stopper at Wall Pour-1 of SC # Formwork of Wall Pour-1 at SC # 2 Concrete of Columns at SC # 2 Concrete of Wall Pour-1 at SC # 2 Steel fixing of Walls Pour-2 of SC # 2 Fixing of Water Stopper at Wall Pour-2 of SC # Formwork of Wall Pour-2 at SC # 2 Concrete of Wall Pour-2 at SC # 2 Steel fixing of Centeral Well, Channels and Ma Fixing of Water Stopper at Well of SC # 2 Formwork of Channel and Manhole at SC # 2 Formwork of Centeral Well at SC # 2 Concrete of Channel and Manhole at SC # 2 Concrete of Centeral Well at SC # 2

Metals
Actual Work Remaining Work Critical Remaining Work Milestone

Summary

Page 5 of 16

TASK filter: All Activities Oracle Corporation

NPL ETP Sheikhupura Factory Activity ID NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 Activity Name Laying of Cast Iron Pipes Before 2nd Stage Le Installation of Embedded Items at Column(s) o Installation of Embedded Items at Walls Pour-1 Installation of Embedded Items at Walls Pour-2 Installation of Embedded Items at Centeral We Installation of Embedded Items at Manholes of Original Early Start Duration 5 21-Jan-12 2 01-Mar-12 4 05-Mar-12 4 30-Mar-12 4 25-Apr-12 4 25-Apr-12 18 31-Mar-12 18 31-Mar-12 0 09-May-12 0 102 30-Jan-12 15 30-Jan-12 5 30-Jan-12 5 04-Feb-12 5 04-Feb-12 5 04-Feb-12 1 09-Feb-12 5 09-Feb-12 5 09-Feb-12 5 09-Feb-12 1 09-Feb-12 1 09-Feb-12 66 10-Feb-12 7 10-Feb-12 2 17-Feb-12 1 19-Feb-12 8 08-Apr-12 86 10-Feb-12 8 10-Feb-12 1 18-Feb-12 3 18-Feb-12 3 20-Feb-12 2 21-Feb-12 8 23-Feb-12 1 02-Mar-12 8 06-Mar-12 2 14-Mar-12 8 17-Mar-12 1 25-Mar-12 8 29-Mar-12 2 06-Apr-12 10 08-Apr-12 10 22-Apr-12 4 02-May-12 51 02-Mar-12 Installation of Embedded Items at Walls Pour-1 Installation of Embedded Items at Walls Pour-2 Installation of Embedded Items at Top Slab of S 4 02-Mar-12 4 25-Mar-12 4 18-Apr-12 Early Finish 25-Jan-12 02-Mar-12 08-Mar-12 02-Apr-12 28-Apr-12 28-Apr-12 17-Apr-12 17-Apr-12 09-May-12 09-May-12 10-May-12 13-Feb-12 03-Feb-12 08-Feb-12 08-Feb-12 08-Feb-12 09-Feb-12 13-Feb-12 13-Feb-12 13-Feb-12 09-Feb-12 09-Feb-12 15-Apr-12 16-Feb-12 18-Feb-12 19-Feb-12 15-Apr-12 05-May-12 17-Feb-12 18-Feb-12 20-Feb-12 22-Feb-12 22-Feb-12 01-Mar-12 02-Mar-12 13-Mar-12 15-Mar-12 24-Mar-12 25-Mar-12 05-Apr-12 07-Apr-12 17-Apr-12 01-May-12 05-May-12 21-Apr-12 05-Mar-12 28-Mar-12 21-Apr-12 Total4, 2011 Float Nov 126 166 133 133 134 133 145 145 133 133 132 219 98 98 115 219 98 219 115 115 210 210 154 210 210 210 98 137 98 100 98 210 98 98 109 98 98 98 109 98 98 132 132 132 132 98 98 132

Classic Schedule Layout 1 Qtr 1, 2012 Dec Jan Feb Mar Apr Qtr 2, 2012 May Jun Jul Qtr 3, 2012 Aug Sep

19-Apr-12 11:02 Qtr 4, 2012 Oct

Laying of Cast Iron Pipes Before 2nd Stage Lean concrete at SC # 2 Installation of Embedded Items at Column(s) of SC # 2 Installation of Embedded Items at Walls Pour-1 of SC # 2 Installation of Embedded Items at Walls Pour-2 of SC # 2 Installation of Embedded Items at Centeral Well of SC # 2 Installation of Embedded Items at Manholes of SC # 2 17-Apr-12, Finishes External Bituminous Coating at SC # 2 09-May-12, Handing Over To Mechanical Team Sec. Clarifier #2 Handing Over to Mechanical Team 10-May-12, Sludge Recycle Pit 13-Feb-12, Design Development Finalization of Mechanical Engineering Design of SRP Finalization of Civil Engineering Design of SRP Finalization of Mechanical Detailed Design of SRP Finalization of E&I Engineering Design of SRP Finalization of Civil Detailed Design of SRP Finalization of E&I Detailed Design of SRP 13-Feb-12, Procurement Procurement of Embedded Items for SRP 09-Feb-12, Existing Conditions Layout of Sludge Recycle Pit 15-Apr-12, Earthwork Excavation for SRP Levelling and Bed Dressing of SRP Chemical Termite Proofing of SRP Backfilling and Compaction of SRP 05-May-12, Concrete Steel fixing of Bottom Slab of SRP Fixing of Water Stopper at Bottom Slab of SRP Formwork for Bottom Slab of SRP PCC 1:4:8 of Bottom Slab at SRP Concrete pouring for Bottom Slab of SRP Steel fixing of Walls Pour-1 of SRP Fixing of Water Stopper at Walls Pour-1 of SRP Formwork for Walls pour-1 of SRP Concrete pouring for Walls pour-1 of SRP Steel fixing of Walls Pour-2 of SRP Fixing of Water Stopper at Walls Pour-2 of SRP Formwork for Walls pour-2 of SRP Concrete Pouring for Walls pour-2 of SRP Steel fixing of Beams and Top Slab of SRP Formwork for Beams and Slab of SRP Concrete Pouring for Beams and Slab of SRP 21-Apr-12, Metals Installation of Embedded Items at Walls Pour-1 of SRP Installation of Embedded Items at Walls Pour-2 of SRP Installation of Embedded Items at Top Slab of SRP Page 6 of 16 TASK filter: All Activities Oracle Corporation

Finishes Finishe
NPL05 External Bituminous Coating at SC # 2

Handing Handin Over To Mechanical Team


NPL05 Sec. Clarifier #2 Handing Over to Mechanical T

Sludge Recycle Pit


Design Development
NPL03 NPL03 NPL03 NPL03 NPL03 NPL03 Finalization of Mechanical Engineering Design Finalization of Civil Engineering Design of SRP Finalization of Mechanical Detailed Design of S Finalization of E&I Engineering Design of SRP Finalization of Civil Detailed Design of SRP Finalization of E&I Detailed Design of SRP

Procurement Procur
NPL04 Procurement of Embedded Items for SRP

Existing Existin Conditions


NPL05 Layout of Sludge Recycle Pit

Earthwork Earthw
NPL05 NPL05 NPL05 NPL05 Excavation for SRP Levelling and Bed Dressing of SRP Chemical Termite Proofing of SRP Backfilling and Compaction of SRP

Concrete Concre
NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 Steel fixing of Bottom Slab of SRP Fixing of Water Stopper at Bottom Slab of SRP Formwork for Bottom Slab of SRP PCC 1:4:8 of Bottom Slab at SRP Concrete pouring for Bottom Slab of SRP Steel fixing of Walls Pour-1 of SRP Fixing of Water Stopper at Walls Pour-1 of SR Formwork for Walls pour-1 of SRP Concrete pouring for Walls pour-1 of SRP Steel fixing of Walls Pour-2 of SRP Fixing of Water Stopper at Walls Pour-2 of SR Formwork for Walls pour-2 of SRP Concrete Pouring for Walls pour-2 of SRP Steel fixing of Beams and Top Slab of SRP Formwork for Beams and Slab of SRP Concrete Pouring for Beams and Slab of SRP

Metals
NPL05 NPL05 NPL05

Actual Work Remaining Work

Critical Remaining Work Milestone

Summary

NPL ETP Sheikhupura Factory Activity ID Activity Name Original Early Start Duration 6 04-Apr-12 6 04-Apr-12 5 06-May-12 5 06-May-12 164 07-Jan-12 15 07-Jan-12 5 07-Jan-12 5 12-Jan-12 5 12-Jan-12 5 12-Jan-12 1 17-Jan-12 5 17-Jan-12 5 17-Jan-12 5 17-Jan-12 1 17-Mar-12 1 17-Mar-12 93 18-Mar-12 4 18-Mar-12 1 22-Mar-12 1 23-Mar-12 2 14-Apr-12 8 11-Jun-12 74 24-Mar-12 1 24-Mar-12 2 16-Apr-12 6 18-Apr-12 1 24-Apr-12 2 24-Apr-12 2 26-Apr-12 10 28-Apr-12 15 06-May-12 1 08-May-12 3 21-May-12 6 24-May-12 8 28-May-12 1 05-Jun-12 69 25-Mar-12 Laying of Cast Iron Pipes Before 2nd Stage Le Installation of Embedded Items at Walls of ST # Installation of Embedded Items in Channels an 20 25-Mar-12 4 07-May-12 4 29-May-12 18 24-May-12 18 24-May-12 0 18-Jun-12 0 165 12-Jan-12 15 12-Jan-12 5 12-Jan-12 Early Finish 09-Apr-12 09-Apr-12 10-May-12 10-May-12 18-Jun-12 21-Jan-12 11-Jan-12 16-Jan-12 16-Jan-12 16-Jan-12 17-Jan-12 21-Jan-12 21-Jan-12 21-Jan-12 17-Mar-12 17-Mar-12 18-Jun-12 21-Mar-12 22-Mar-12 23-Mar-12 15-Apr-12 18-Jun-12 05-Jun-12 24-Mar-12 17-Apr-12 23-Apr-12 24-Apr-12 25-Apr-12 27-Apr-12 07-May-12 20-May-12 08-May-12 23-May-12 29-May-12 04-Jun-12 05-Jun-12 01-Jun-12 13-Apr-12 10-May-12 01-Jun-12 10-Jun-12 10-Jun-12 18-Jun-12 18-Jun-12 24-Jun-12 26-Jan-12 16-Jan-12 Total4, 2011 Float Nov 98 98 132 132 93 242 0 93 156 242 184 242 156 156 93 93 93 93 93 93 93 93 106 93 93 93 94 93 93 93 93 105 93 106 106 106 109 93 103 109 93 93 93 93 87 237 0

Classic Schedule Layout 1 Qtr 1, 2012 Dec Jan Feb Mar Apr Qtr 2, 2012 May Jun Jul 09-Apr-12, Finishes External Bituminous Coating at SRP 10-May-12, Handing Over To Mechanical Team Sludge Recycle Pit Handing Over to Mechanical Team 18-Jun-12, Sludge Thickner-1 21-Jan-12, Design Development Finalization of Mechanical Engineering Design of ST # 1 Finalization of Civil Engineering Design of ST # 1 Finalization of Mechanical Detailed Design of ST # 1 Finalization of E&I Engineering Design of ST # 1 Finalization of Civil Detailed Design of ST # 1 Finalization of E&I Detailed Design of ST # 1 21-Jan-12, Procurement Procurement of Embedded Items for ST # 1 17-Mar-12, Existing Conditions Layout of Sludge Thickener # 1 18-Jun-12, Earthwork Excavation for ST # 1 Levelling and Bed Dressing of ST # 1 Chemical Termite Proofing of ST # 1 Backfilling and Compaction After Laying CI Pipes at ST # 1 Backfilling and Compaction outside walls at ST # 1 05-Jun-12, Concrete Stage-1 Lean Concrete(PCC 1:4:8) at ST # 1 Stage-2 Lean Concrete(PCC 1:4:8) at ST # 1 Steel fixing of Raft of ST # 1 Fixing of Water Stopper at Raft and Wall Joint of ST # 1 Formwork for Raft of ST # 1 Concrete puoring of Raft of ST # 1 Steel fixing of Walls of ST # 1 Formwork for Walls of ST # 1 Fixing of Water Stopper at Walls of ST # 1 Concrete Pouring of Walls of ST # 1 Steel fixing of Channels and Top Slab of ST # 1 Formwork for Channels and Top Slab of ST # 1 Concrete pouring of Channels and Top Slab of ST # 1 01-Jun-12, Metals Laying of Cast Iron Pipes Before 2nd Stage Lean concrete at ST # 1 Installation of Embedded Items at Walls of ST # 1 Qtr 3, 2012 Aug Sep

19-Apr-12 11:02 Qtr 4, 2012 Oct

Finishes Finishe
NPL05 External Bituminous Coating at SRP

Handing Handin Over To Mechanical Team


NPL05 Sludge Recycle Pit Handing Over to Mechanic

Sludge Thickner-1
Design Development
NPL03 NPL03 NPL03 NPL03 NPL03 NPL03 Finalization of Mechanical Engineering Design Finalization of Civil Engineering Design of ST # Finalization of Mechanical Detailed Design of S Finalization of E&I Engineering Design of ST # Finalization of Civil Detailed Design of ST # 1 Finalization of E&I Detailed Design of ST # 1

Procurement Procur
NPL04 Procurement of Embedded Items for ST # 1

Existing Existin Conditions


NPL05 Layout of Sludge Thickener # 1

Earthwork Earthw
NPL05 NPL05 NPL05 NPL05 NPL05 Excavation for ST # 1 Levelling and Bed Dressing of ST # 1 Chemical Termite Proofing of ST # 1 Backfilling and Compaction After Laying CI Pip Backfilling and Compaction outside walls at ST

Concrete Concre
NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 Stage-1 Lean Concrete(PCC 1:4:8) at ST # 1 Stage-2 Lean Concrete(PCC 1:4:8) at ST # 1 Steel fixing of Raft of ST # 1 Fixing of Water Stopper at Raft and Wall Joint Formwork for Raft of ST # 1 Concrete puoring of Raft of ST # 1 Steel fixing of Walls of ST # 1 Formwork for Walls of ST # 1 Fixing of Water Stopper at Walls of ST # 1 Concrete Pouring of Walls of ST # 1 Steel fixing of Channels and Top Slab of ST # 1 Formwork for Channels and Top Slab of ST # Concrete pouring of Channels and Top Slab o

Metals
NPL05 NPL05 NPL05

Installation of Embedded Items in Channels and Top Slab of ST # 1 10-Jun-12, Finishes External Bituminous Coating at ST # 1 18-Jun-12, Handing Over To Mechanical Team Sludge Thickener-1 Handing Over to Mechanical Team 24-Jun-12, Sludge Thickner-2 26-Jan-12, Design Development Finalization of Mechanical Engineering Design of ST # 2 Page 7 of 16 TASK filter: All Activities Oracle Corporation

Finishes Finishe
NPL05 External Bituminous Coating at ST # 1

Handing Handin Over To Mechanical Team


NPL05 Sludge Thickener-1 Handing Over to Mechani

Sludge Thickner-2
Design Development
NPL03 Finalization of Mechanical Engineering Design

Actual Work Remaining Work

Critical Remaining Work Milestone

Summary

NPL ETP Sheikhupura Factory Activity ID NPL03 NPL03 NPL03 NPL03 NPL03 Activity Name Finalization of Civil Engineering Design of ST # Finalization of Mechanical Detailed Design of S Finalization of E&I Engineering Design of ST # Finalization of Civil Detailed Design of ST # 2 Finalization of E&I Detailed Design of ST # 2 Original Early Start Duration 5 17-Jan-12 5 17-Jan-12 5 17-Jan-12 1 22-Jan-12 5 22-Jan-12 5 22-Jan-12 5 22-Jan-12 1 23-Mar-12 1 23-Mar-12 93 24-Mar-12 4 24-Mar-12 1 28-Mar-12 1 29-Mar-12 2 20-Apr-12 8 17-Jun-12 74 30-Mar-12 1 30-Mar-12 2 22-Apr-12 6 24-Apr-12 1 30-Apr-12 2 30-Apr-12 2 02-May-12 10 04-May-12 15 12-May-12 1 14-May-12 3 27-May-12 6 30-May-12 8 03-Jun-12 1 11-Jun-12 69 31-Mar-12 Laying of Cast Iron Pipes Before 2nd Stage Le Installation of Embedded Items at Walls of ST # Installation of Embedded Items in Channels an 20 31-Mar-12 4 13-May-12 4 04-Jun-12 18 30-May-12 18 30-May-12 0 24-Jun-12 0 66 16-Apr-12 15 16-Apr-12 5 16-Apr-12 5 21-Apr-12 5 21-Apr-12 5 21-Apr-12 1 26-Apr-12 5 26-Apr-12 15 26-Apr-12 15 26-Apr-12 1 26-Apr-12 Critical Remaining Work Milestone Summary Early Finish 21-Jan-12 21-Jan-12 21-Jan-12 22-Jan-12 26-Jan-12 26-Jan-12 26-Jan-12 23-Mar-12 23-Mar-12 24-Jun-12 27-Mar-12 28-Mar-12 29-Mar-12 21-Apr-12 24-Jun-12 11-Jun-12 30-Mar-12 23-Apr-12 29-Apr-12 30-Apr-12 01-May-12 03-May-12 13-May-12 26-May-12 14-May-12 29-May-12 04-Jun-12 10-Jun-12 11-Jun-12 07-Jun-12 19-Apr-12 16-May-12 07-Jun-12 16-Jun-12 16-Jun-12 24-Jun-12 24-Jun-12 20-Jun-12 30-Apr-12 20-Apr-12 25-Apr-12 25-Apr-12 25-Apr-12 26-Apr-12 30-Apr-12 10-May-12 10-May-12 26-Apr-12 Total4, 2011 Float Nov 87 151 237 179 237 151 151 87 87 87 87 87 87 87 87 100 87 87 87 88 87 87 87 87 128 87 100 100 100 103 87 97 103 87 87 87 87 91 142 0 96 91 142 102 142 91 91 96

Classic Schedule Layout 1 Qtr 1, 2012 Dec Jan Feb Mar Apr Finalization of Civil Engineering Design of ST # 2 Finalization of Mechanical Detailed Design of ST # 2 Finalization of E&I Engineering Design of ST # 2 Finalization of Civil Detailed Design of ST # 2 Finalization of E&I Detailed Design of ST # 2 26-Jan-12, Procurement Procurement of Embedded Items for ST # 2 23-Mar-12, Existing Conditions Layout of Sludge Thickener # 2 24-Jun-12, Earthwork Excavation for ST # 2 Levelling and Bed Dressing of ST # 2 Chemical Termite Proofing of ST # 2 Backfilling and Compaction After Laying CI Pipes at ST # 2 Qtr 2, 2012 May Jun Jul Qtr 3, 2012 Aug Sep

19-Apr-12 11:02 Qtr 4, 2012 Oct

Procurement Procur
NPL04 Procurement of Embedded Items for ST # 2

Existing Existin Conditions


NPL05 Layout of Sludge Thickener # 2

Earthwork Earthw
NPL05 NPL05 NPL05 NPL05 NPL05 Excavation for ST # 2 Levelling and Bed Dressing of ST # 2 Chemical Termite Proofing of ST # 2 Backfilling and Compaction After Laying CI Pip Backfilling and Compaction outside walls at ST

Backfilling and Compaction outside walls at ST # 2 11-Jun-12, Concrete Stage-1 Lean Concrete(PCC 1:4:8) at ST # 2 Stage-2 Lean Concrete(PCC 1:4:8) at ST # 2 Steel fixing of Raft of ST # 2 Fixing of Water Stopper at Raft and Wall Joint of ST # 2 Formwork for Raft of ST # 2 Concrete puoring of Raft of ST # 2 Steel fixing of Walls of ST # 2 Formwork for Walls of ST # 2 Fixing of Water Stopper at Walls of ST # 2 Concrete Pouring of Walls of ST # 2 Steel fixing of Channels and Top Slab of ST # 2 Formwork for Channels and Top Slab of ST # 2 Concrete pouring of Channels and Top Slab of ST # 2 07-Jun-12, Metals Laying of Cast Iron Pipes Before 2nd Stage Lean concrete at ST # 2 Installation of Embedded Items at Walls of ST # 2 Installation of Embedded Items in Channels and Top Slab of ST # 2 16-Jun-12, Finishes External Bituminous Coating at ST # 2 24-Jun-12, Handing Over To Mechanical Team Sludge Thickener-2 Handing Over to Mechanical Team 20-Jun-12, Head Works 30-Apr-12, Design Development Finalization of Mechanical Engineering Design of H/W Finalization of Civil Engineering Design of H/W Finalization of Mechanical Detailed Design of H/W Finalization of E&I Engineering Design of H/W Finalization of Civil Detailed Design of H/W Finalization of E&I Detailed Design of H/W 10-May-12, Procurement Procurement of Embedded Items for H/W 26-Apr-12, Existing Conditions Page 8 of 16 TASK filter: All Activities Oracle Corporation

Concrete Concre
NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 Stage-1 Lean Concrete(PCC 1:4:8) at ST # 2 Stage-2 Lean Concrete(PCC 1:4:8) at ST # 2 Steel fixing of Raft of ST # 2 Fixing of Water Stopper at Raft and Wall Joint Formwork for Raft of ST # 2 Concrete puoring of Raft of ST # 2 Steel fixing of Walls of ST # 2 Formwork for Walls of ST # 2 Fixing of Water Stopper at Walls of ST # 2 Concrete Pouring of Walls of ST # 2 Steel fixing of Channels and Top Slab of ST # 2 Formwork for Channels and Top Slab of ST # Concrete pouring of Channels and Top Slab o

Metals
NPL05 NPL05 NPL05

Finishes Finishe
NPL05 External Bituminous Coating at ST # 2

Handing Handin Over To Mechanical Team


NPL05 Sludge Thickener-2 Handing Over to Mechani

Head Works W
Design Development
NPL03 NPL03 NPL03 NPL03 NPL03 NPL03 Finalization of Mechanical Engineering Design Finalization of Civil Engineering Design of H/W Finalization of Mechanical Detailed Design of H Finalization of E&I Engineering Design of H/W Finalization of Civil Detailed Design of H/W Finalization of E&I Detailed Design of H/W

Procurement Procur
NPL04 Procurement of Embedded Items for H/W

Existing Existin Conditions


Actual Work Remaining Work

NPL ETP Sheikhupura Factory Activity ID NPL05 Activity Name Layout of Head Works Original Early Start Duration 1 26-Apr-12 42 27-Apr-12 2 27-Apr-12 1 29-Apr-12 1 30-Apr-12 7 01-Jun-12 41 01-May-12 2 01-May-12 5 03-May-12 3 03-May-12 3 03-May-12 3 03-May-12 1 06-May-12 1 06-May-12 1 06-May-12 1 06-May-12 2 06-May-12 2 07-May-12 1 07-May-12 2 08-May-12 1 09-May-12 2 10-May-12 2 12-May-12 2 14-May-12 1 14-May-12 5 15-May-12 1 16-May-12 3 17-May-12 4 18-May-12 2 19-May-12 1 20-May-12 4 20-May-12 2 21-May-12 2 22-May-12 1 23-May-12 4 24-May-12 2 24-May-12 3 26-May-12 4 28-May-12 4 29-May-12 2 01-Jun-12 1 02-Jun-12 4 03-Jun-12 3 03-Jun-12 4 05-Jun-12 3 07-Jun-12 1 09-Jun-12 1 10-Jun-12 10 19-May-12 10 19-May-12 Summary Early Finish 26-Apr-12 07-Jun-12 28-Apr-12 29-Apr-12 30-Apr-12 07-Jun-12 10-Jun-12 02-May-12 07-May-12 05-May-12 05-May-12 05-May-12 06-May-12 06-May-12 06-May-12 06-May-12 07-May-12 08-May-12 07-May-12 09-May-12 09-May-12 11-May-12 13-May-12 15-May-12 14-May-12 19-May-12 16-May-12 19-May-12 21-May-12 20-May-12 20-May-12 23-May-12 22-May-12 23-May-12 23-May-12 27-May-12 25-May-12 28-May-12 31-May-12 01-Jun-12 02-Jun-12 02-Jun-12 06-Jun-12 05-Jun-12 08-Jun-12 09-Jun-12 09-Jun-12 10-Jun-12 28-May-12 28-May-12 Total4, 2011 Float Nov 96 104 96 96 96 104 101 96 102 96 98 96 96 98 98 98 97 96 98 102 96 102 102 102 91 91 102 102 104 91 105 102 91 104 91 91 102 102 91 102 91 102 91 102 102 91 102 91 108 108

Classic Schedule Layout 1 Qtr 1, 2012 Dec Jan Feb Mar Apr Qtr 2, 2012 May Layout of Head Works 07-Jun-12, Earthwork Excavation for H / W Levelling and Bed Dressing of H/W Chemical Termite Proofing of H / W Backfilling and Compaction of H / W 10-Jun-12, Concrete PCC 1:4:8 of H/W Steel Fixing of Isolated Footings of H/W Steel Fixing of Raft Foundation and walls at -7.5m of H/W Steel Fixing of Raft Foundation and walls at -6.5m of H/W Steel Fixing of Raft Foundation and walls at -5.0 and -5.3m of H/W Fixing of Water Stopper at Raft at -7.5m of H/W Fixing of Water Stopper at Raft at -6.5m of H/W Fixing of Water Stopper at Raft Foundation at -5.0 and -5.3m of H/W Formwork of Raft Foundation and walls at -6.5m of H/W Formwork of Raft Foundation and walls at -5.0 and -5.3m of H/W Formwork of Raft Foundation and walls at -7.5m of H/W Concrete Pouring of Raft Foundation and walls at -6.5m of H/W Formwork of Isolated Footings of H/W Concrete Pouring of Raft Foundation and walls at -7.5m of H/W Concrete Pouring of Isolated Footings of H/W Steel Fixing of Plinth Beams of H/W Formwork of Plinth Beams of H/W Jun Jul Qtr 3, 2012 Aug Sep

19-Apr-12 11:02 Qtr 4, 2012 Oct

Earthwork Earthw
NPL05 NPL05 NPL05 NPL05 Excavation for H / W Levelling and Bed Dressing of H/W Chemical Termite Proofing of H / W Backfilling and Compaction of H / W

Concrete Concre
NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 PCC 1:4:8 of H/W Steel Fixing of Isolated Footings of H/W Steel Fixing of Raft Foundation and walls at -7 Steel Fixing of Raft Foundation and walls at -6 Steel Fixing of Raft Foundation and walls at -5 Fixing of Water Stopper at Raft at -7.5m of H/W Fixing of Water Stopper at Raft at -6.5m of H/W Fixing of Water Stopper at Raft Foundation at Formwork of Raft Foundation and walls at -6.5 Formwork of Raft Foundation and walls at -5.0 Formwork of Raft Foundation and walls at -7.5 Concrete Pouring of Raft Foundation and walls Formwork of Isolated Footings of H/W Concrete Pouring of Raft Foundation and walls Concrete Pouring of Isolated Footings of H/W Steel Fixing of Plinth Beams of H/W Formwork of Plinth Beams of H/W Concrete Pouring of Raft Foundation and walls Steel Fixing of Walls of H/W Concrete Pouring of Plinth Beams of H/W Steel Fixing of Columns of H/W Formwork of Walls of H/W Steel fixing of Slab at -3.4m of H/W Fixing of Water Stopper at walls at -0.300m of Formwork of Columns of H/W Formwork of Slab at -3.4m of H/W Concrete Pouring of Walls upto -0.30m of H/W Concrete Pouring of Slab at -3.4m of H/W Steel Fixing of Slab and Beams at -0.30m of H Concrete Pouring of Columns of H/W Steel Fixing of Beams at +5.50m of H/W Formwork of Slab and Beams at -0.30m of H/W Formwork of Beams at +5.50m of H/W Concrete Pouring of Slab and Beams at -0.30m Concrete Pouring of Beams at +5.50m of H/W Steel fixing for Stair Case of H/W Steel Fixing of Slab at +5.50m of H/W Formwork of Slab at +5.50m of H/W Formwork of Stair Case of H/W Concrete Pouring of Slab at +5.50m of H/W Concrete Pouring of Stair Case of H/W

Concrete Pouring of Raft Foundation and walls at -5.0 and -5.3m of H/W Steel Fixing of Walls of H/W Concrete Pouring of Plinth Beams of H/W Steel Fixing of Columns of H/W Formwork of Walls of H/W Steel fixing of Slab at -3.4m of H/W Fixing of Water Stopper at walls at -0.300m of H/W Formwork of Columns of H/W Formwork of Slab at -3.4m of H/W Concrete Pouring of Walls upto -0.30m of H/W Concrete Pouring of Slab at -3.4m of H/W Steel Fixing of Slab and Beams at -0.30m of H/W Concrete Pouring of Columns of H/W Steel Fixing of Beams at +5.50m of H/W Formwork of Slab and Beams at -0.30m of H/W Formwork of Beams at +5.50m of H/W Concrete Pouring of Slab and Beams at -0.30m of H/W Concrete Pouring of Beams at +5.50m of H/W Steel fixing for Stair Case of H/W Steel Fixing of Slab at +5.50m of H/W Formwork of Slab at +5.50m of H/W Formwork of Stair Case of H/W Concrete Pouring of Slab at +5.50m of H/W Concrete Pouring of Stair Case of H/W 28-May-12, Masonary Brick Masonary at H/W Page 9 of 16 TASK filter: All Activities Oracle Corporation

Masonary Mason
NPL05 Brick Masonary at H/W Critical Remaining Work Milestone

Actual Work Remaining Work

NPL ETP Sheikhupura Factory Activity ID Activity Name Original Early Start Duration 41 11-May-12 Installation of Embedded Items at-5.20 and -5. Installation of Embedded Items at--4.20m of H/ Installation of I-Beam at H/W Installation of Embedded Items at-0.30m of H/W Installation of Embedded Plate at Top Beam of Installation of Monkey Ladders at H/W Installation of Railing at H/W 3 11-May-12 3 18-May-12 3 26-May-12 3 28-May-12 3 29-May-12 3 31-May-12 3 18-Jun-12 4 29-May-12 4 29-May-12 4 29-May-12 11 24-May-12 10 24-May-12 10 25-May-12 0 20-Jun-12 0 59 21-Apr-12 15 21-Apr-12 5 21-Apr-12 5 26-Apr-12 5 26-Apr-12 5 26-Apr-12 1 01-May-12 5 01-May-12 5 01-May-12 5 01-May-12 1 01-May-12 1 01-May-12 38 02-May-12 2 02-May-12 1 04-May-12 1 05-May-12 6 03-Jun-12 38 06-May-12 2 06-May-12 2 06-May-12 4 08-May-12 3 08-May-12 5 11-May-12 3 12-May-12 2 15-May-12 2 16-May-12 2 18-May-12 2 20-May-12 1 22-May-12 4 23-May-12 5 26-May-12 2 31-May-12 Summary Early Finish 20-Jun-12 13-May-12 20-May-12 28-May-12 30-May-12 31-May-12 02-Jun-12 20-Jun-12 01-Jun-12 01-Jun-12 01-Jun-12 03-Jun-12 02-Jun-12 03-Jun-12 20-Jun-12 20-Jun-12 18-Jun-12 05-May-12 25-Apr-12 30-Apr-12 30-Apr-12 30-Apr-12 01-May-12 05-May-12 05-May-12 05-May-12 01-May-12 01-May-12 08-Jun-12 03-May-12 04-May-12 05-May-12 08-Jun-12 12-Jun-12 07-May-12 07-May-12 11-May-12 10-May-12 15-May-12 14-May-12 16-May-12 17-May-12 19-May-12 21-May-12 22-May-12 26-May-12 30-May-12 01-Jun-12 Total4, 2011 Float Nov 91 91 105 114 92 103 109 91 110 110 110 108 104 108 91 91 93 137 0 64 65 137 64 137 132 132 93 93 103 93 93 93 103 99 126 93 126 93 93 126 126 93 93 93 93 99 99 99

Classic Schedule Layout 1 Qtr 1, 2012 Dec Jan Feb Mar Apr Qtr 2, 2012 May Jun Jul 20-Jun-12, Metals Installation of Embedded Items at-5.20 and -5.00m of H/W Installation of Embedded Items at--4.20m of H/W Installation of I-Beam at H/W Installation of Embedded Items at-0.30m of H/W Installation of Embedded Plate at Top Beam of H/W Installation of Monkey Ladders at H/W Installation of Railing at H/W 01-Jun-12, Openings Installation of Doors at H/W Installation of Shutters at H/W 03-Jun-12, Finishes External Bituminous Coating at H / W Plastering of Walls at H/W 20-Jun-12, Handing Over To Mechanical Team Head Works Handing Over to Mechanical Team 18-Jun-12, Blower Room 05-May-12, Design Development Finalization of Mechanical Engineering Design of BR Finalization of Civil Engineering Design of BR Finalization of Mechanical Detailed Design of BR Finalization of E&I Engineering Design of BR Finalization of Civil Detailed Design of BR Finalization of E&I Detailed Design of BR 05-May-12, Procurement Procurement of Embedded Items for BR 01-May-12, Existing Conditions Layout of Blower Room 08-Jun-12, Earthwork Excavation for BR Levelling and Bed Dressing of BR Chemical Termite Proofing of BR Backfilling and Compaction of BR 12-Jun-12, Concrete PCC 1:4:8 for Blower Foundations of BR PCC 1:4:8 for Boundary Wall Foundation of BR Steel Fixing for Blower Foundations of BR Steel Fixing for Isolated Footings of BR Formwork for Isolated Footings of BR Formwork for Blower Foundations of BR Concrete Pouring of Blower Foundations of BR Concrete Pouring of Isolated Footings of BR Steel Fixing for Plinth Beams of BR Formwork for Plinth Beams of BR Concrete Pouring of Plinth Beams of BR Steel Fixing for Columns of BR Formwork for Columns of BR Concrete Pouring of Columns of BR Page 10 of 16 TASK filter: All Activities Qtr 3, 2012 Aug Sep

19-Apr-12 11:02 Qtr 4, 2012 Oct

Metals
NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05

Openings Openin
NPL05 NPL05 Installation of Doors at H/W Installation of Shutters at H/W

Finishes Finishe
NPL05 NPL05 External Bituminous Coating at H / W Plastering of Walls at H/W

Handing Handin Over To Mechanical Team


NPL05 Head Works Handing Over to Mechanical Tea

Blower Room
Design Development
NPL03 NPL03 NPL03 NPL03 NPL03 NPL03 Finalization of Mechanical Engineering Design Finalization of Civil Engineering Design of BR Finalization of Mechanical Detailed Design of B Finalization of E&I Engineering Design of BR Finalization of Civil Detailed Design of BR Finalization of E&I Detailed Design of BR

Procurement Procur
NPL04 Procurement of Embedded Items for BR

Existing Existin Conditions


NPL05 Layout of Blower Room

Earthwork Earthw
NPL05 NPL05 NPL05 NPL05 Excavation for BR Levelling and Bed Dressing of BR Chemical Termite Proofing of BR Backfilling and Compaction of BR

Concrete Concre
NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 PCC 1:4:8 for Blower Foundations of BR PCC 1:4:8 for Boundary Wall Foundation of BR Steel Fixing for Blower Foundations of BR Steel Fixing for Isolated Footings of BR Formwork for Isolated Footings of BR Formwork for Blower Foundations of BR Concrete Pouring of Blower Foundations of BR Concrete Pouring of Isolated Footings of BR Steel Fixing for Plinth Beams of BR Formwork for Plinth Beams of BR Concrete Pouring of Plinth Beams of BR Steel Fixing for Columns of BR Formwork for Columns of BR Concrete Pouring of Columns of BR Critical Remaining Work Milestone

Actual Work Remaining Work

Oracle Corporation

NPL ETP Sheikhupura Factory Activity ID NPL05 NPL05 NPL05 Activity Name Steel Fixing for Top Slab and Beams of BR Formwork for Top Slab and Beams of BR Concrete Pouring of Top Slab and Beams of B Original Early Start Duration 5 02-Jun-12 4 07-Jun-12 2 11-Jun-12 10 30-May-12 10 30-May-12 29 12-May-12 Installation of Embedded Items in Foundations Installation of Embedded Items in walls of BR Installation of Embedded Items in Slab of BR 3 12-May-12 3 05-Jun-12 3 07-Jun-12 6 09-Jun-12 4 09-Jun-12 4 09-Jun-12 6 09-Jun-12 25 25-May-12 10 25-May-12 10 09-Jun-12 0 18-Jun-12 0 74 26-Apr-12 15 26-Apr-12 5 26-Apr-12 1 01-May-12 5 01-May-12 5 01-May-12 5 06-May-12 5 06-May-12 5 11-May-12 5 11-May-12 1 02-May-12 1 02-May-12 50 03-May-12 3 03-May-12 1 06-May-12 1 07-May-12 5 17-Jun-12 52 08-May-12 2 08-May-12 12 10-May-12 12 24-May-12 12 07-Jun-12 8 21-Jun-12 10 19-Jun-12 10 19-Jun-12 39 16-May-12 Installation of Embedded Items in Slab of AB Installation of Embedded Items in Water Tank o Installation of Embedded Items in walls of AB 2 16-May-12 2 16-May-12 2 22-Jun-12 Early Finish 06-Jun-12 10-Jun-12 12-Jun-12 08-Jun-12 08-Jun-12 09-Jun-12 14-May-12 07-Jun-12 09-Jun-12 14-Jun-12 12-Jun-12 12-Jun-12 14-Jun-12 18-Jun-12 03-Jun-12 18-Jun-12 18-Jun-12 18-Jun-12 08-Jul-12 10-May-12 30-Apr-12 01-May-12 05-May-12 05-May-12 10-May-12 10-May-12 15-May-12 15-May-12 02-May-12 02-May-12 21-Jun-12 05-May-12 06-May-12 07-May-12 21-Jun-12 28-Jun-12 09-May-12 21-May-12 04-Jun-12 18-Jun-12 28-Jun-12 28-Jun-12 28-Jun-12 23-Jun-12 17-May-12 17-May-12 23-Jun-12 Total4, 2011 Float Nov 99 99 99 93 93 102 126 104 100 97 99 99 97 93 103 93 93 93 73 132 3 73 3 132 93 132 93 93 73 73 90 73 73 73 90 83 73 73 73 73 83 73 73 88 93 117 88

Classic Schedule Layout 1 Qtr 1, 2012 Dec Jan Feb Mar Apr Qtr 2, 2012 May Jun Jul Qtr 3, 2012 Aug Sep Steel Fixing for Top Slab and Beams of BR Formwork for Top Slab and Beams of BR Concrete Pouring of Top Slab and Beams of BR 08-Jun-12, Masonary Brick Masonary at BR 09-Jun-12, Metals Installation of Embedded Items in Foundations of BR Installation of Embedded Items in walls of BR Installation of Embedded Items in Slab of BR 14-Jun-12, Openings Installation of Door at BR Installation of Shutter at BR

19-Apr-12 11:02 Qtr 4, 2012 Oct

Masonary Mason
NPL05 Brick Masonary at BR

Metals
NPL05 NPL05 NPL05

Openings Openin
NPL05 NPL05 NPL05 Installation of Door at BR Installation of Shutter at BR Installation of Steel Louver Windows with Insec

Installation of Steel Louver Windows with Insect Mesh at BR 18-Jun-12, Finishes External Bituminous Coating at BR Plastering at BR 18-Jun-12, Handing Over To Mechanical Team Blower Room Handing Over to Mechanical Team 08-Jul-12, Admin Block 10-May-12, Design Development Finalization of Civil Engineering Design of AB Finalization of Civil Detailed Design of AB Finalization of Mechanical Engineering Design of AB Finalization of E&I Engineering Design of AB Finalization of Mechanical Detailed Design of AB Finalization of E&I Detailed Design of AB 15-May-12, Procurement Procurement of Embedded Items for AB 02-May-12, Existing Conditions Layout of Admin. Building 21-Jun-12, Earthwork Excavation for AB Levelling and Bed Dressing of AB Chemical Termite Proofing of AB Backfilling and Compaction of AB 28-Jun-12, Concrete PCC 1:4:8 at AB Concrete Pouring of Isolated Footings after Steel & F/W fixing of AB Concrete Pouring of Columns after Steel & F/W fixing at AB Concrete Pouring of Beams and Top Slab after Steel & F/W fixing at A Concrete Pouring of Water Tank after Steel & F/W fixing at AB 28-Jun-12, Masonary Brick Masonary at AB 23-Jun-12, Metals Installation of Embedded Items in Slab of AB Installation of Embedded Items in Water Tank of AB Installation of Embedded Items in walls of AB

Finishes Finishe
NPL05 NPL05 External Bituminous Coating at BR Plastering at BR

Handing Handin Over To Mechanical Team


NPL05 Blower Room Handing Over to Mechanical Te

Admin B Block
Design Development
NPL03 NPL03 NPL03 NPL03 NPL03 NPL03 Finalization of Civil Engineering Design of AB Finalization of Civil Detailed Design of AB Finalization of Mechanical Engineering Design Finalization of E&I Engineering Design of AB Finalization of Mechanical Detailed Design of A Finalization of E&I Detailed Design of AB

Procurement Procur
NPL04 Procurement of Embedded Items for AB

Existing Existin Conditions


NPL05 Layout of Admin. Building

Earthwork Earthw
NPL05 NPL05 NPL05 NPL05 Excavation for AB Levelling and Bed Dressing of AB Chemical Termite Proofing of AB Backfilling and Compaction of AB

Concrete Concre
NPL05 NPL05 NPL05 NPL05 NPL05 PCC 1:4:8 at AB Concrete Pouring of Isolated Footings after Ste Concrete Pouring of Columns after Steel & F/W Concrete Pouring of Beams and Top Slab afte Concrete Pouring of Water Tank after Steel &

Masonary Mason
NPL05 Brick Masonary at AB

Metals
NPL05 NPL05 NPL05

Actual Work Remaining Work

Critical Remaining Work Milestone

Summary

Page 11 of 16

TASK filter: All Activities Oracle Corporation

NPL ETP Sheikhupura Factory Activity ID Activity Name Original Early Start Duration 4 29-Jun-12 4 29-Jun-12 25 14-Jun-12 10 14-Jun-12 10 29-Jun-12 3 06-May-12 Water Supply line for AB Gas Supply line for AB Sanitary Piping for AB 3 06-May-12 3 06-May-12 3 06-May-12 0 08-Jul-12 0 71 21-Apr-12 15 21-Apr-12 5 21-Apr-12 5 26-Apr-12 5 26-Apr-12 5 26-Apr-12 1 01-May-12 5 01-May-12 5 01-May-12 5 01-May-12 1 02-May-12 1 02-May-12 44 03-May-12 3 03-May-12 1 06-May-12 1 07-May-12 7 09-Jun-12 54 08-May-12 2 08-May-12 10 10-May-12 10 10-May-12 12 22-May-12 12 05-Jun-12 12 19-Jun-12 3 06-May-12 Installation of Embedded Items for Pour-1 of W Installation of Embedded Items for Pour-2 of W Installation of Embedded Items in Top Slab of T 3 06-May-12 3 06-May-12 3 06-May-12 10 03-Jun-12 10 03-Jun-12 0 30-Jun-12 0 77 02-May-12 13 02-May-12 13 02-May-12 23 15-May-12 Critical Remaining Work Milestone Summary Early Finish 02-Jul-12 02-Jul-12 08-Jul-12 23-Jun-12 08-Jul-12 08-May-12 08-May-12 08-May-12 08-May-12 08-Jul-12 08-Jul-12 30-Jun-12 05-May-12 25-Apr-12 30-Apr-12 30-Apr-12 30-Apr-12 01-May-12 05-May-12 05-May-12 05-May-12 02-May-12 02-May-12 15-Jun-12 05-May-12 06-May-12 07-May-12 15-Jun-12 30-Jun-12 09-May-12 19-May-12 19-May-12 02-Jun-12 16-Jun-12 30-Jun-12 08-May-12 08-May-12 08-May-12 08-May-12 12-Jun-12 12-Jun-12 30-Jun-12 30-Jun-12 17-Jul-12 14-May-12 14-May-12 06-Jun-12 Total4, 2011 Float Nov 79 79 73 88 73 129 129 129 129 73 73 81 137 81 81 94 137 81 137 94 94 81 81 96 81 81 81 96 81 81 81 81 81 81 81 122 94 108 122 96 96 81 81 64 64 64 64

Classic Schedule Layout 1 Qtr 1, 2012 Dec Jan Feb Mar Apr Qtr 2, 2012 May Jun Jul 02-Jul-12, Openings Installation of Doors & Windows at AB 08-Jul-12, Finishes External Bituminous Coating at AB Plastering at AB 08-May-12, Utilities Water Supply line for AB Gas Supply line for AB Sanitary Piping for AB Qtr 3, 2012 Aug Sep

19-Apr-12 11:02 Qtr 4, 2012 Oct

Openings Openin
NPL05 Installation of Doors & Windows at AB

Finishes Finishe
NPL05 NPL05 External Bituminous Coating at AB Plastering at AB

Utilities
NPL05 NPL05 NPL05

Handing Handin Over To Mechanical Team


NPL05 Admin. Building Handing Over to Mechanical T

08-Jul-12, Handing Over To Mechanical Team Admin. Building Handing Over to Mechanical Team 30-Jun-12, Tail Works 05-May-12, Design Development Finalization of Mechanical Engineering Design of T/W Finalization of Civil Engineering Design of T/W Finalization of Mechanical Detailed Design of T/W Finalization of E&I Engineering Design of T/W Finalization of Civil Detailed Design of T/W Finalization of E&I Detailed Design of T/W 05-May-12, Procurement Procurement of Embedded Items for T/W 02-May-12, Existing Conditions Layout of Tail Works 15-Jun-12, Earthwork Excavation for T / W Levelling and Bed Dressing of T/W Chemical Termite Proofing of TW Backfilling and Compaction of T / W 30-Jun-12, Concrete PCC 1:4:8 at T/W Concrete Pouring of Foundation after Steel, Water Stopperand F/W Fixing at -3.00m Concrete Pouring of Foundation after Steel, Water Stopper and F/W Fixing at at -2.10 Concrete Pour-1 of Walls after Steel, Water Stopper and F/W Fixing at T/W Concrete Pour-2 of Walls after Steel, Water Stopper and F/W Fixing a Concrete Pouring of Top Slab and Beams of T/W 08-May-12, Metals Installation of Embedded Items for Pour-1 of Walls of T/W Installation of Embedded Items for Pour-2 of Walls of T/W Installation of Embedded Items in Top Slab of T/W 12-Jun-12, Finishes External Bituminous Coating at T/W 30-Jun-12, Handing Over To Mechanical Team Tail Works Handing Over to Mechanical Team 17-Jul-12, Steel Bridge 14-May-12, Design Development Finalization of Steel Bridge Design 06-Jun-12, Procurement Page 12 of 16 TASK filter: All Activities Oracle Corporation

Tail Wor Works


Design Development
NPL03 NPL03 NPL03 NPL03 NPL03 NPL03 Finalization of Mechanical Engineering Design Finalization of Civil Engineering Design of T/W Finalization of Mechanical Detailed Design of T Finalization of E&I Engineering Design of T/W Finalization of Civil Detailed Design of T/W Finalization of E&I Detailed Design of T/W

Procurement Procur
NPL04 Procurement of Embedded Items for T/W

Existing Existin Conditions


NPL05 Layout of Tail Works

Earthwork Earthw
NPL05 NPL05 NPL05 NPL05 Excavation for T / W Levelling and Bed Dressing of T/W Chemical Termite Proofing of TW Backfilling and Compaction of T / W

Concrete Concre
NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 PCC 1:4:8 at T/W Concrete Pouring of Foundation after Steel, W Concrete Pouring of Foundation after Steel, W Concrete Pour-1 of Walls after Steel, Water St Concrete Pour-2 of Walls after Steel, Water St Concrete Pouring of Top Slab and Beams of T/

Metals
NPL05 NPL05 NPL05

Finishes Finishe
NPL05 External Bituminous Coating at T/W

Handing Handin Over To Mechanical Team


NPL05 Tail Works Handing Over to Mechanical Team

Steel Br Bridge
Design Development
NPL03 Finalization of Steel Bridge Design

Procurement Procur
Actual Work Remaining Work

NPL ETP Sheikhupura Factory Activity ID NPL04 Activity Name Procurements for Steel Bridge Original Early Start Duration 23 15-May-12 1 15-May-12 1 15-May-12 42 16-May-12 3 16-May-12 1 19-May-12 1 20-May-12 5 22-Jun-12 32 21-May-12 2 21-May-12 5 23-May-12 5 28-May-12 3 19-Jun-12 57 22-May-12 Fabrication of Steel Bridge Construction/Erection of Steel Bridge 28 22-May-12 25 23-Jun-12 0 17-Jul-12 0 62 06-May-12 15 06-May-12 5 06-May-12 5 11-May-12 5 11-May-12 5 11-May-12 1 16-May-12 5 16-May-12 5 16-May-12 5 16-May-12 1 17-May-12 1 17-May-12 45 18-May-12 2 18-May-12 2 20-May-12 1 22-May-12 5 27-Jun-12 31 23-May-12 1 23-May-12 10 24-May-12 10 03-Jun-12 10 13-Jun-12 10 23-Jun-12 10 23-Jun-12 3 21-May-12 Installation of Embedded Items at Foundation o Installation of Embedded Items at Walls/Colum Installation of Embedded Items in Slab of LV 2 3 21-May-12 3 21-May-12 3 21-May-12 4 03-Jul-12 Early Finish 06-Jun-12 15-May-12 15-May-12 26-Jun-12 18-May-12 19-May-12 20-May-12 26-Jun-12 21-Jun-12 22-May-12 27-May-12 01-Jun-12 21-Jun-12 17-Jul-12 18-Jun-12 17-Jul-12 17-Jul-12 17-Jul-12 06-Jul-12 20-May-12 10-May-12 15-May-12 15-May-12 15-May-12 16-May-12 20-May-12 20-May-12 20-May-12 17-May-12 17-May-12 01-Jul-12 19-May-12 21-May-12 22-May-12 01-Jul-12 22-Jun-12 23-May-12 02-Jun-12 12-Jun-12 22-Jun-12 02-Jul-12 02-Jul-12 23-May-12 23-May-12 23-May-12 23-May-12 06-Jul-12 Total4, 2011 Float Nov 64 81 81 85 81 81 81 85 64 81 81 81 64 64 64 64 64 64 75 122 3 75 75 122 75 122 75 75 75 75 80 75 75 75 80 75 75 75 75 75 75 75 95 75 85 95 75

Classic Schedule Layout 1 Qtr 1, 2012 Dec Jan Feb Mar Apr Qtr 2, 2012 May Jun Jul Procurements for Steel Bridge 15-May-12, Existing Conditions Layout of Steel Bridge Foundations 26-Jun-12, Earthwork Excavation for Steel Bridge Foundations Levelling and Bed Dressing for Steel Bridge Foundations Chemical Termite Proofing for Steel Bridge Foundations Qtr 3, 2012 Aug Sep

19-Apr-12 11:02 Qtr 4, 2012 Oct

Existing Existin Conditions


NPL05 Layout of Steel Bridge Foundations

Earthwork Earthw
NPL05 NPL05 NPL05 NPL05 Excavation for Steel Bridge Foundations Levelling and Bed Dressing for Steel Bridge Fo Chemical Termite Proofing for Steel Bridge Fo Backfilling and Compaction at Bridge Foundatio

Backfilling and Compaction at Bridge Foundations 21-Jun-12, Concrete PCC 1:4:8 for Steel Bridge Foundations Steel Fixing for Steel Bridge Foundations Formwork for Steel Bridge Foundations Concrete pouring of Steel Bridge Foundations 17-Jul-12, Metals Fabrication of Steel Bridge Construction/Erection of Steel Bridge 17-Jul-12, Handing Over To Mechanical Team Steel Bridge Handing Over to Mechanical Team 06-Jul-12, Low Voltage-2 20-May-12, Design Development Finalization of Mechanical Engineering Design of LV 2 Finalization of Civil Engineering Design of LV 2 Finalization of Mechanical Detailed Design of LV 2 Finalization of E&I Engineering Design of LV 2 Finalization of Civil Detailed Design of LV 2 Finalization of E&I Detailed Design of LV 2 20-May-12, Procurement Procurement of Embedded Items for LV 2 17-May-12, Existing Conditions Layout of LV Room 2 01-Jul-12, Earthwork Excavation for LV 2 Levelling and Bed Dressing of LV 2 Chemical Termite Proofing of LV 2 Backfilling and Compaction of LV 2 22-Jun-12, Concrete PCC 1:4:8 of LV 2 Concrete pouring of Foundation after Steel and F/W fixing at LV 2 Concrete pouring of Walls/Columns after Steel and F/W fixing at LV 2 Concrete pouring of Beams and Slab after Steel and F/W fixing at L 02-Jul-12, Masonary Brick Masonary at LV 2 23-May-12, Metals Installation of Embedded Items at Foundation of LV 2 Installation of Embedded Items at Walls/Columns of LV 2 Installation of Embedded Items in Slab of LV 2 06-Jul-12, Openings

Concrete Concre
NPL05 NPL05 NPL05 NPL05 PCC 1:4:8 for Steel Bridge Foundations Steel Fixing for Steel Bridge Foundations Formwork for Steel Bridge Foundations Concrete pouring of Steel Bridge Foundations

Metals
NPL05 NPL05

Handing Handin Over To Mechanical Team


NPL05 Steel Bridge Handing Over to Mechanical Team

Low Vo Voltage-2
Design Development
NPL03 NPL03 NPL03 NPL03 NPL03 NPL03 Finalization of Mechanical Engineering Design Finalization of Civil Engineering Design of LV 2 Finalization of Mechanical Detailed Design of L Finalization of E&I Engineering Design of LV 2 Finalization of Civil Detailed Design of LV 2 Finalization of E&I Detailed Design of LV 2

Procurement Procur
NPL04 Procurement of Embedded Items for LV 2

Existing Existin Conditions


NPL05 Layout of LV Room 2

Earthwork Earthw
NPL05 NPL05 NPL05 NPL05 Excavation for LV 2 Levelling and Bed Dressing of LV 2 Chemical Termite Proofing of LV 2 Backfilling and Compaction of LV 2

Concrete Concre
NPL05 NPL05 NPL05 NPL05 PCC 1:4:8 of LV 2 Concrete pouring of Foundation after Steel an Concrete pouring of Walls/Columns after Stee Concrete pouring of Beams and Slab after Ste

Masonary Mason
NPL05 Brick Masonary at LV 2

Metals
NPL05 NPL05 NPL05

Openings Openin
Actual Work Remaining Work Critical Remaining Work Milestone

Summary

Page 13 of 16

TASK filter: All Activities Oracle Corporation

NPL ETP Sheikhupura Factory Activity ID NPL05 Activity Name Installation of Door, windows/vents at LV 2 Original Early Start Duration 4 03-Jul-12 20 17-Jun-12 10 17-Jun-12 10 27-Jun-12 0 06-Jul-12 0 53 06-May-12 15 06-May-12 5 06-May-12 5 11-May-12 5 11-May-12 5 11-May-12 1 16-May-12 5 16-May-12 5 16-May-12 5 16-May-12 1 17-May-12 1 17-May-12 41 18-May-12 3 18-May-12 1 21-May-12 1 22-May-12 5 23-Jun-12 21 23-May-12 1 23-May-12 4 24-May-12 1 28-May-12 2 28-May-12 1 31-May-12 5 01-Jun-12 5 06-Jun-12 2 11-Jun-12 12 28-May-12 Installation of Embedded Items at Foundation o Installation of Embedded Items at Walls/Colum 3 28-May-12 3 06-Jun-12 10 13-Jun-12 10 13-Jun-12 0 27-Jun-12 0 76 14-May-12 21 14-May-12 14 14-May-12 7 28-May-12 21 04-Jun-12 21 04-Jun-12 1 04-Jun-12 1 04-Jun-12 Summary Early Finish 06-Jul-12 06-Jul-12 26-Jun-12 06-Jul-12 06-Jul-12 06-Jul-12 27-Jun-12 20-May-12 10-May-12 15-May-12 15-May-12 15-May-12 16-May-12 20-May-12 20-May-12 20-May-12 17-May-12 17-May-12 27-Jun-12 20-May-12 21-May-12 22-May-12 27-Jun-12 12-Jun-12 23-May-12 27-May-12 28-May-12 29-May-12 31-May-12 05-Jun-12 10-Jun-12 12-Jun-12 08-Jun-12 30-May-12 08-Jun-12 22-Jun-12 22-Jun-12 27-Jun-12 27-Jun-12 28-Jul-12 03-Jun-12 27-May-12 03-Jun-12 24-Jun-12 24-Jun-12 04-Jun-12 04-Jun-12 Total4, 2011 Float Nov 75 75 80 75 75 75 84 122 3 84 91 122 84 122 91 91 84 84 84 84 84 84 84 84 84 84 86 85 84 84 84 84 86 84 86 84 84 84 84 53 3 3 3 3 3 95 95

Classic Schedule Layout 1 Qtr 1, 2012 Dec Jan Feb Mar Apr Qtr 2, 2012 May Jun Jul Qtr 3, 2012 Aug Sep

19-Apr-12 11:02 Qtr 4, 2012 Oct

Installation of Door, windows/vents at LV 2 06-Jul-12, Finishes External Bituminous Coating at LV 2 Plastering at LV 2 06-Jul-12, Handing Over To Mechanical Team LV Room 2 Handing Over to Mechanical Team 27-Jun-12, DAF 20-May-12, Design Development Finalization of Mechanical Engineering Design of DAF Finalization of Civil Engineering Design of DAF Finalization of Mechanical Detailed Design of DAF Finalization of E&I Engineering Design of DAF Finalization of Civil Detailed Design of DAF Finalization of E&I Detailed Design of DAF 20-May-12, Procurement Procurement of Embedded Items for DAF 17-May-12, Existing Conditions Layout of DAF Unit 27-Jun-12, Earthwork Excavation for DAF Unit Levelling and Bed Dressing of DAF Unit Chemical Termite Proofing of DAF Unit Backfilling and Compaction of DAF Unit 12-Jun-12, Concrete PCC 1:4:8 of DAF Steel Fixing for Foundation of DAF Fixing of Water Stopper at DAF Formwork for Foundation of DAF Concrete pouring of Foundation of DAF Steel Fixing for Walls/Columns of DAF Formwork for Walls/Columns of DAF Concrete pouring of Walls/Columns of DAF 08-Jun-12, Metals Installation of Embedded Items at Foundation of DAF Installation of Embedded Items at Walls/Columns of DAF 22-Jun-12, Finishes External Bituminous Coating at DAF Unit 27-Jun-12, Handing Over To Mechanical Team DAF Unit Handing Over to Mechanical Team 28-Jul-12, Under Ground Process Piping 03-Jun-12, Design Development Finalization of Engineering Design of Process Piping Finalization of Detailed Design of Process Piping 24-Jun-12, Procurement Procurement of U/G Process Piping 04-Jun-12, Existing Conditions Layout of Underground Process Piping Page 14 of 16 TASK filter: All Activities Oracle Corporation

Finishes Finishe
NPL05 NPL05 External Bituminous Coating at LV 2 Plastering at LV 2

Handing Handin Over To Mechanical Team


NPL05 LV Room 2 Handing Over to Mechanical Team

DAF
Design Development
NPL03 NPL03 NPL03 NPL03 NPL03 NPL03 Finalization of Mechanical Engineering Design Finalization of Civil Engineering Design of DAF Finalization of Mechanical Detailed Design of D Finalization of E&I Engineering Design of DAF Finalization of Civil Detailed Design of DAF Finalization of E&I Detailed Design of DAF

Procurement Procur
NPL04 Procurement of Embedded Items for DAF

Existing Existin Conditions


NPL05 Layout of DAF Unit

Earthwork Earthw
NPL05 NPL05 NPL05 NPL05 Excavation for DAF Unit Levelling and Bed Dressing of DAF Unit Chemical Termite Proofing of DAF Unit Backfilling and Compaction of DAF Unit

Concrete Concre
NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 NPL05 PCC 1:4:8 of DAF Steel Fixing for Foundation of DAF Fixing of Water Stopper at DAF Formwork for Foundation of DAF Concrete pouring of Foundation of DAF Steel Fixing for Walls/Columns of DAF Formwork for Walls/Columns of DAF Concrete pouring of Walls/Columns of DAF

Metals
NPL05 NPL05

Finishes Finishe
NPL05 External Bituminous Coating at DAF Unit

Handing Handin Over To Mechanical Team


NPL05 DAF Unit Handing Over to Mechanical Team

Under G Ground Process Piping


Design Development
NPL03 NPL03 Finalization of Engineering Design of Process P Finalization of Detailed Design of Process Pipin

Procurement Procur
NPL03 Procurement of U/G Process Piping

Existing Existin Conditions


NPL05 Layout of Underground Process Piping Critical Remaining Work Milestone

Actual Work Remaining Work

NPL ETP Sheikhupura Factory Activity ID Activity Name Original Early Start Duration 54 05-Jun-12 3 05-Jun-12 3 08-Jun-12 8 21-Jul-12 6 11-Jun-12 6 11-Jun-12 28 18-Jun-12 Installation of U/G Process Piping 28 18-Jun-12 5 16-Jul-12 5 16-Jul-12 84 24-May-12 84 24-May-12 21 24-May-12 28 14-Jun-12 28 14-Jun-12 42 28-Jun-12 7 09-Aug-12 82 28-May-12 8 28-May-12 8 28-May-12 20 29-Jul-12 Construction of Storm Water Drains (If in Scop 20 29-Jul-12 104 05-Jun-12 8 05-Jun-12 8 05-Jun-12 30 18-Aug-12 30 18-Aug-12 303 15-Nov-11 126 26-Apr-12 Detailed Design of Blowers Procurement of Blowers Installation of Blowers Testing of Blowers 28 26-Apr-12 21 24-May-12 14 09-Aug-12 7 23-Aug-12 119 26-Apr-12 28 26-Apr-12 28 24-May-12 28 31-May-12 28 28-Jun-12 14 26-Jul-12 14 09-Aug-12 112 24-May-12 21 24-May-12 28 14-Jun-12 14 23-Aug-12 7 06-Sep-12 112 24-May-12 Early Finish 28-Jul-12 07-Jun-12 10-Jun-12 28-Jul-12 16-Jun-12 16-Jun-12 15-Jul-12 15-Jul-12 20-Jul-12 20-Jul-12 15-Aug-12 15-Aug-12 13-Jun-12 11-Jul-12 11-Jul-12 08-Aug-12 15-Aug-12 17-Aug-12 04-Jun-12 04-Jun-12 17-Aug-12 17-Aug-12 16-Sep-12 12-Jun-12 12-Jun-12 16-Sep-12 16-Sep-12 12-Sep-12 29-Aug-12 23-May-12 13-Jun-12 22-Aug-12 29-Aug-12 22-Aug-12 23-May-12 20-Jun-12 27-Jun-12 25-Jul-12 08-Aug-12 22-Aug-12 12-Sep-12 13-Jun-12 11-Jul-12 05-Sep-12 12-Sep-12 12-Sep-12 Total4, 2011 Float Nov 47 95 95 3 95 95 3 3 3 3 35 35 35 35 35 35 35 3 57 57 3 3 3 69 69 3 3 7 21 0 21 21 21 28 28 28 28 28 28 28 7 7 7 7 7 7

Classic Schedule Layout 1 Qtr 1, 2012 Dec Jan Feb Mar Apr Qtr 2, 2012 May Jun Jul Qtr 3, 2012 Aug 28-Jul-12, Earthwork Excavation for Underground Process Piping Sep

19-Apr-12 11:02 Qtr 4, 2012 Oct

Earthwork Earthw
NPL05 NPL05 NPL05 Excavation for Underground Process Piping Levelling and Bed Dressing for Underground P Backfilling and Compaction after U/G Process

Levelling and Bed Dressing for Underground Process Piping Backfilling and Compaction after U/G Process 16-Jun-12, Concrete Concrete Work for Underground Process Piping (If any) 15-Jul-12, Metals Installation of U/G Process Piping 20-Jul-12, Handing Over To Mechanical Team Trenches for U/G Piping Handing Over for Testing 15-Aug-12, Above Ground Proces P 15-Aug-12, Above Ground Piping Detailed Design of Above Ground Piping Procurement of Above Ground Piping Fabrication of Above Ground Piping Installation of Above Ground Piping Testing of Above Ground Piping 17-Aug-12, Storm Water Drainage 04-Jun-12, Design Development Finalization of Storm Water Drain Design 17-Aug-12, Utilities Construction of Storm Water Drain 16-Sep-12, Road 12-Jun-12, Design Development Finalization of Road Design 16-Sep-12, Transp Road Construction 12-Sep-12, Mechani 29-Aug-12, Blowers Detailed Design of Blowers Procurement of Blowers Installation of Blowers Testing of Blowers 22-Aug-12, Air Piping Detailed Design of Air Piping Procurement of Air Piping Fabrication of Air Piping Erection of Air Piping Testing of Air Piping Installation of Valves of Air Pipin 12-Sep-12, Flow Bo Detailed Design of Flow Boosters Procurement of Flow Boosters Installation of Flow Boos Testing of Flow Boo 12-Sep-12, Diffusers

Concrete Concre
NPL05 Concrete Work for Underground Process Pipin

Metals
NPL05

Handing Handin Over To Mechanical Team


NPL05 Trenches for U/G Piping Handing Over for Tes

Above G Ground Proces Piping


Above Ground Piping
A1160 A1170 A1180 A1190 A1390 Detailed Design of Above Ground Piping Procurement of Above Ground Piping Fabrication of Above Ground Piping Installation of Above Ground Piping Testing of Above Ground Piping

Storm Water Drainage W


Design Development
NPL03 Finalization of Storm Water Drain Design

Utilities
NPL05

Road
Design Development
NPL03 Finalization of Road Design

Transportation Transp
NPL05 Road Construction (If in Scope)

Mechanical Equipment Mechan


Blowers Blowe
A1000 A1010 A1020 A1030

Air Pip Piping


A1040 A1050 A1060 A1070 A1370 A1380 Detailed Design of Air Piping Procurement of Air Piping Fabrication of Air Piping Erection of Air Piping Testing of Air Piping Installation of Valves of Air Piping

Flow B Boosters
A1080 A1090 A1100 A1110 Detailed Design of Flow Boosters Procurement of Flow Boosters Installation of Flow Boosters Testing of Flow Boosters

Diffusers Diffuse
Actual Work Remaining Work Critical Remaining Work Milestone

Summary

Page 15 of 16

TASK filter: All Activities Oracle Corporation

NPL ETP Sheikhupura Factory Activity ID A1120 A1130 A1140 A1150 Activity Name Detailed Design of Diffusers Procurement of Air Diffusers Installation of Air Diffusers Testing of Air Diffusers Original Early Start Duration 21 24-May-12 28 14-Jun-12 28 09-Aug-12 7 06-Sep-12 119 26-Apr-12 Detailed Design of Pumps Procurement of Pumps Installation of Pumps Testing of Pumps 14 26-Apr-12 28 10-May-12 14 02-Aug-12 7 16-Aug-12 28 15-Nov-11 28 15-Nov-11 5 15-Nov-11 5 15-Nov-11 5 15-Nov-11 91 26-Apr-12 91 26-Apr-12 14 26-Apr-12 42 10-May-12 28 21-Jun-12 7 19-Jul-12 147 26-Apr-12 147 26-Apr-12 14 26-Apr-12 63 10-May-12 42 28-Jun-12 28 09-Aug-12 14 06-Sep-12 Early Finish 13-Jun-12 11-Jul-12 05-Sep-12 12-Sep-12 22-Aug-12 09-May-12 06-Jun-12 15-Aug-12 22-Aug-12 12-Dec-11 12-Dec-11 19-Nov-11 19-Nov-11 19-Nov-11 25-Jul-12 25-Jul-12 09-May-12 20-Jun-12 18-Jul-12 25-Jul-12 19-Sep-12 19-Sep-12 09-May-12 11-Jul-12 08-Aug-12 05-Sep-12 19-Sep-12 Total4, 2011 Float Nov 7 7 7 7 28 28 28 28 28 282 282 305 305 305 56 56 56 56 56 56 0 0 0 0 0 0 0

Classic Schedule Layout 1 Qtr 1, 2012 Dec Jan Feb Mar Apr Qtr 2, 2012 May Jun Jul Qtr 3, 2012 Aug Sep Detailed Design of Diffusers Procurement of Air Diffusers

19-Apr-12 11:02 Qtr 4, 2012 Oct

Installation of Air Diffuse Testing of Air Diffuse 22-Aug-12, Pumps Detailed Design of Pumps Procurement of Pumps Installation of Pumps Testing of Pumps 12-Dec-11, Penstock Gate Valves Detailed Design of Penstock Gate Valves Procurement of Penstock Gate Valves Installation of Penstock Gate Valves Testing of Penstock Gate Valves 25-Jul-12, Intergrated Automation 25-Jul-12, Integrated Automation Design of Integrated Automation Installation of Integrated Automation Testing of Integrated Automation Commissioning of Integrated Automation 19-Sep-12, Elec 19-Sep-12, Elec Design of Electrification Procurement of Electrification Installation of Electrification Testing of Electrification Commissioning o

Pumps
A1200 A1210 A1220 A1230

Penstock Pensto Gate Valves


A1240 A1250 A1260 A1270 Detailed Design of Penstock Gate Valves Procurement of Penstock Gate Valves Installation of Penstock Gate Valves Testing of Penstock Gate Valves

Intergrated Automation Intergra


Integrated Automation Integra
A1280 A1290 A1310 A1320 Design of Integrated Automation Installation of Integrated Automation Testing of Integrated Automation Commissioning of Integrated Automation

Electrification Electrific
Electrical Electri
A1300 A1330 A1340 A1350 A1360 Design of Electrification Procurement of Electrification Installation of Electrification Testing of Electrification Commissioning of Electrification

Actual Work Remaining Work

Critical Remaining Work Milestone

Summary

Page 16 of 16