1st Week:

a. Joining on 20th February. b. Created an Excel Tabulation Sheet for Accounts Appropriation on behalf of mentor. c. Attended a meeting as technical expert for the power up gradation project along with my mentor and other colleagues. d. Visited other departments and floors for getting acquainted.

2nd Week:

a. Substituted my mentor (on leave) for the whole week. b. Coordinated the administration and infrastructure facility with proper support. c. Developed generator consumption rate tabulation sheet with different capacities.

3rd week:

a. Visited Ashulia warehouse on the new sub-station project for training and inspection. b. Visited the power up gradation project of the Head Quarter basement from 500KW to 1.5MW (live project); without the power interruption and failures, the project is still ongoing; deadline of the project is on 23 April 8, 2012. c. Created a log book and inventory book for all the electrical assets of the company throughout Bangladesh.

4th Week

a. Visited all the offices in Dhaka for the inventory management ACs, Chillers, Generators, AVRs, MDBs, etc. b. Labeled the equipments with proper tag for easy identification and maintenance through computer system. c. Regularly visited the basement power up gradation project of the Head Quarter.

5th Week:

a. Developed and presented a power point slide on the topic of (Laptop Vs. Desktop)- to help the procurement department for purchasing computers. The job took 2-3 weeks, as I had to take into consideration the minute details available to convince them for laptop purchase. I researched, to some extent with the topic--power requirement issue, heat generation issue, portability issue, employee motivation factor, environmental issue, consumer statistics, capex (procurement, ups, battery backup, ac installation for ups room, damage/stolen ratio) and opex (electricity consumption, ups charging current required, space required for pcs, ups room space, heat generation, ac electricity consumption for ups, ups maintenance, pc maintenance, insurance) a. Helped in automation of the administration department, the department no longer uses any paper and pen, everything is done through computers, they communicates through e-mails, processes any documents through computers, scanners and printers. Everything is managed by a powerful software tool, LAN solution and dedicated database management system software.

6th Week:

b. Prepared a technical comparative statement for the purchase of few generators. Depending on my elaborate technical evaluation, the procurement department will be purchasing the generators. 7th Week: a. Learned about the GSM system Switching System (AUC, VLR, HLR, EIR, GMSC, MSC) and Base Station Sub-system (BSC, BTS, NMC and OMC). Also learned about the VAS (Value Added System) , Core network, RF planning, Access network and lot more about the network.

Details of the power up-gradation project of the Head Quarter which is still ongoing, and to be finished by 23 April, 2012. Daily work is going on, in which I need to supervise the project to some extent and learn a lot more new thing about electrical equipments and facilities. Details given, day wise, up till date.

Earth Boring Cabling to new generator set for IT emergency ATS(Auto transfer Switch) backup. Abandon panel dismantle Civil Works Mcos(Manual change over switch) 1 and 2 installations on the outside IT backup Mcos 5 installation in IT room LT (Low tension) panel (Temp) Mcos 5 IT to Gen (Generator) (New) Mcos 1 to Gen 3 Cable Mcos 1(Load) to Mcos 2 incoming cable Mcos 3 and 4 Installation Neutral Connections (New distribution Neutral to Main Neutral) 75KVA Gen start to back up IT ATS

IT Mcos 5 to IT MDB (Main Distribution Board) IT Mcos 5 Cable to gen 1 (new 500) Distribution install Mcos 2 to Db(Distribution Board) incoming breaker HT (High tension) shut down and all Gen on backup LT 1 breaker change (630 to be replaced with 800A and new 800A install for ATS (outgoing) Mcos 2 to LT1 (800A TP MCCB (Moulded case circuit breaker) new) HT Turn on All floor Loads Transfer (from old dist to new dist) Gen 1 (500 KVA new) start IT Mcos function (IT run by Gen1) HT power off Gen 3 off manually IT connection transfer (Old to new db) Mcos 2 (incoming ) to ATS (existing ) HT power on IT Mcos Function (run by PDB) Gen 1 (500KVA new) stop ATS 1 & 2 (old ) install Outside ATS 1&2 to Gen 1&2 Re connection ATS 1 &2 to LT1 Cable connection ATS 2 (old ) to Dist 2 ATS 1 (old ) to Dist 1 Db old out LT 1 &2 civil base

Gen 3 Manually off Mcos 1 (incoming) to Gen 3 Gen1 Start (for IT Backup) IT Mcos function PDB (Power development Board) off (from HT) Mcos 2 to ATS 2 Gen3 start (Gen 2 on backup) IT Mcos function Gen1 Stop LT 1 shift to final base TR (Transformer) 1000 LT cabling clearing TR1000 to LT 1 BBT (Bus bar trunking) connect TR 1000 LT bushing maintainence ATS 3 shift outside LT 1 to ATS 1&2 connections LT 1 to ATS 3 connections Gen 1 start IT Mcos function Gen 2 & 3 stop ATS 3 to db 3 ATS 3 to Mcos 2 ATS 2 connections restore HT on PDB connection to be checked Db to be closed

IT Mcos function Gen1 stop LT 2 installation TR 500 base civil Duct fabrication for rental DG (Diesel generator)