======================================================================== ************************************************************************ Transactional ======================================================================== ************************************************************************ BOM ================= CS01 - Create BOM (02 - Change; 03 - Display) CS07 - Assign

BOM to Plant (Extend) cs08 - Change/Delete Assignment of BOM to Plant CS11 - Display BOM Level by Level CS12 - Multi Level BOM Structure CS13 - Summarized BOM Structure CS14 - BOM Comparison CS15 - Material Where-Used List CSMB - Product Structure (Multi Level BOM) WORK CENTER ================= CR01 - Create Work CR05 - Work Center CR06 - Cost Center CR07 - Work Center

Center (02 - Change; 03 - Display) List Assignment of Work Centers Capacities

RESOURCES ========= CRC1 - Create Resources (2 - Change; 3 - Display) ROUTING ================= CA01 - create Routing (02 - Change; 03 - Display) CA11 - Create Reference Operation Set (12 - Change; 13 - Display Reference Opera tion Set) CA21 - Create Rate Routing (22 - Change Rate Routing; 23 - Display Rate Routing) CA31 - Create Reference Rate Routing (32 - Change Reference Rate Routing; 33 - D isplay Reference Rate Routing RECIPE ====== C201 - Create Recipe (02 - Change; 03 - Display) PACKING INSTRUCTION =================== POP1 - Create Packing Instruction (2 - Change, 3 - Display) POF1 - Packing Instruction - Create Determination Records (2 - Change, 3 - Displ ay) PLANNED ORDER ============= MD11 - Create Planned Order Manually MD19 - Firm Planned Orders CO40 - Conversion of Planned Order to Production Order - Individual CO41 - Conversion of Planned Order to Production Order - Collective

COR7 - Conversion of Planned Order to Process Order - Individual COR8 - Conversion of Planned Order to Process Order - Collective PRODUCTION ORDER (PRD) ====================== CO01 - Create Production Order (with Material Reference) (02 - Change; 03 - Disp lay) CO07 - Create Production Order (with Reference to Sales Order) CO04N - Prnt Shopfloor Paper MB31 / MIGO - Goods Receipt for Order CO40 - Individual Conversion of Planned Order to Production Order CO41 - Collective Conversion of Planned Order to Production Order CO48 - Partial Conversion of Planned Order to Production Order (Individual) CO11N - Process Order Time Ticket (Confirmation Cofirmation at Operation Level) CO1F - Progress Confirmation CO15 - Confirmation at Order Level CO12 - Collective Confirmation CO1V - Fast Entry Confirmation CO1F - Progress Confirmation CO13 - Cancel Production Order Confirmation C014 - Display Production Order Confirmation PROCESS ORDER ============= COR1 - Create Process Order (2 - Change; 3 - Display) COR6N - Confirmation of Process Order - Time Ticket (Cofirmation at Phase Level ) CORZ - Confirmation of Process Order - Time Event CORR - Confirmation of Process Order - Collective CORS - Cancel Process Order Confirmation CORT - Display Process Order Confirmation CO53 - Control Recipe Monitor CO54 - Process Message Monitor CO55 - Worklist for PI Sheets CO60 - Find PI Sheet MATERIAL REQUIREMENTS PLANNING (MRP) ==================================== MDBT - MRP Run (Background) MD01 - MRP Run - Collective MD02 - MRP Run - Single Item, Multi-Level MD03 - MRP Run - Single Item, Single-Level MD04 - Stock Requirements List MD05 - Material Requirements List MD06 - Material Requirements List - Collective MD07 - Stock Requirements List - Collective MD08 - Delete MRP List MD16 - View Planned Order MD20 - Create Planning File (Foreground) (21 - Display) MDAB - Create Planning File (Background) MDVP - Check Materials Availability MD40 - Master Production Scheduling Planning Run MD41 - MPS Run - Single Item, Multi-Level MD42 - MPS Run - Single Item, Single-Level MD50 - Make-To-Order Planning - Multi-Level MD61 - Create Planned Independent Requirement (62 - Change; 63-Display) CO40 / MD04 - Individual Convertion of Planned Order to Prdn Order

CO41 MD73 MD74 MD20 MD43

/ -

Collective Convertion of Planned Order to Prdn Order Display Total Requirements Reorganizing Independent Requirements MD21 - Crreate, Display Planning File Entries Single-Item Planning - Interactive

CAPACITY PLANNING ================== CM01 - Capacity Evaluation (Standard Overview) CM02 - Capacity Evaluation (Detailed Capacity List) CM03 - Capacity Evaluation (Pool of Orders / Operations) CM07 - Variable Evaluation for Capacity Planning CM21 - Capacity Leveling (Capacity Planning Table) CM22 - Capacity Leveling (Tabular View) CM25 - Capacity Leveling CM50 - Extended Selection, Work Center View CM52 - Extended Selection, Order View CM99 - Initialization of Basic Load CM40 - Definition of Parameters for Mass Leveling SALES AND OPERATION PLANNING ============================ MC87 - Create Rough-Cut Plan (88 - Change, 89 - Display) MC74 - Transfer Planning Data to Demand Management ANALYSIS ======== MCRE - Material Usage Analyasis MCRI - Product Cost Analysis REPROCESSING / MASS / COLLECTIVE PROCESS =============================================================== C223 - Production Version: Mass Processing CO16N - Reprocess Confirmation (w/ Errors) CO1P - Predefined Confirmation Processes (Reprocess error on Goods Movement duri ng cancellation) COFC - Reprocess Actual Cost (w/ Errors) COGI - Reprocess Goods Movement (w/ Errors) COMAC - Collective Availability Check CO24 - Missing Parts Info System CO27 - Component List INfo System CO05N - Collective Release of Production Orders CO04N - Print Production Orders COHV - Mass Processing of Production Order SE38 (PPARCHP1) -> CO78 - Set Deletion Flag CO78 - Archive Production Order MF47 - Post List of Components on Line (Repititive Mnfg) BS22 - System Status Maintain Goods Movement (Alternative for MIGO) ===================================== MB1A - Goods Issue

MB1B MB1C MT MT MIGO MBST MB03 MB31

- Transfer Posting - Goods Receipt 561 - create initial stock (unrestricted) 563 - create initial stock (QI) - alomost all goods movement - Cancel Material Document - view Material Document - Goods Receipt for Order

MIGO ==== MT 313 MT 315 MT 311 MT 323 MT 101

transfer transfer one-step transfer transfer

posting from unrestricted to in-transit posting from in-transit to unrestricted transfer posting (313,315) posting from QI to unrestricted posting (FG)

Batch ====== MSC1N - create batch MSC2N - Change batch MSC3N - view batch Reporting ========= COOIS - Order Information System - Production Order COOISPI - Order Information System - Process Order ======================================================================== ************************************************************************ Customizing Transactions ======================================================================== ************************************************************************ COB1 - Create Batch Search Strategy CORW - Production Scheduling Profile fot Batch Handling BS22 - System Status Maintain Transaction Control MRP --OMDU OMPQ OMPG OMDO OMI2 OMI3 OM0E

Activate MRP and Set-up Planning MRP Types Consumption Overview Set Up Planning File Entries Number Ranges for Planning Run Number Ranges for Manually Processed Order Proposals scope of Planning for Total Planning

Production Order: ----------------OPJH - Order Types OPL8 - Order Type-Dependent Parameters OPKP - Production Scheduling Profile OPU3 - Scheduling Parameters for Production Orders OPJG - Define Default Values for Generation of Operations OPJK - Define Checking Control OPK4 - Define Confirmations Parameters

OPU3 CO82 OPK4 OPKC OPK0 OPJ9 OPPE

Scheduling Parameters for Production Orders Define Number Ranges for Order Parameters for Order Confirmation Process Control of Confirmation Single Screen Entry of Confirmations Production Scheduler Conversion of Planned Order to Production Order (Default Order Type)

Process Order: -------------CORN - Order Type for Process Orders COR4 - Order Type-Dependent Parameters CORY - Production Scheduling Profile OPUZ - Scheduling Parameeters O10C - Create Control Recipe Destination O13C - Process Massage Destination (Optional) O12C - Process Instruction Category (Optional) OP00 OP19 OP7B OP21 ) OP4A OP50 OPEC OPEB / / Control Keys for Operation Standard Value Key (for Work Center) OP17 - Formula Parameters (Work Center) OP54 - Formula Definition (Scheduling, Capacity / Costing for Work Center Grouping (Work Break Schedules, Shift Definitions, Shift Sequences) Assignment of Material Types (for Task List) User-Defined Fields (for Task List) Automatic Selection (for Task List)

OP52 - Formula Parameters (PRT) OP55 - Formula Definition (PRT) OWD1 - Rounding Profile OPPQ / OMI8 - Plant Parameters for Material Requirements Planning OPPP - Alternate BOM Determination OPPR - MRP Group Parameters Maintenance SCAL - SAP Factory Calendar SM30 - V_T001W - Assign Factory Calendar by Plant RCPTRA01 - Routing Creation via Batchn Input (Program)