Radiogram No. 5929u Form 24 for 08/14/07

JOINT FLIGHT WITH ORBITER DAY FIVE. БОК-3 R&R

GMT CREW ACTIVITY


10:05-10:15 CDR,FE-1 Morning Inspection
10:05-10:20 FE-2 Biochemical urine test
10:15-10:45 CDR,FE-1 Post-sleep
10:20-10:45 FE-2 Post-sleep
10:45-11:35 . BREAKFAST
11:35-12:05 CDR Prep for Work
11:35-12:05 FE-2,FE-1 SSRMS Walkoff
12:05-12:20 . Daily Planning Conference (S-band)
12:20-12:25 CDR DCS battery charging
12:20-13:20 FE-2 Physical Exercise (RED)
12:20-14:10 FE-1 Prepack cable sections with connectors for return on the Shuttle
12:35-13:15 CDR СОЖ Maintenance / ИП-1 position verification / r/g 5577
13:15-13:55 CDR IMS update
13:40-13:55 FE-2 SSRMS Grapple ESP-3
14:10-15:10 FE-2 Maneuver SSRMS to the ESP3 Install Position
14:10-15:10 CDR Physical Exercise (RED)
14:10-15:10 FE-1 Physical Exercise (VELO), day 2
15:10-16:10 FE-1 Prepack cable sections with connectors for return on the Shuttle
15:10-15:50 CDR Photography of SM and DC1 Docking Cone Internal Surfaces
15:10-15:55 FE-2 ESP3 Install
15:50-16:10 CDR Downlink Docking Cone Surface Photos (using OCA)
15:55-16:25 FE-2 ISS EMU Swap
16:10-16:20 CDR PAO hardware setup
16:20-17:20 CDR,FE-1 LUNCH
16:25-16:55 FE-2 Equipment Lock config
16:55-17:55 FE-2 LUNCH
17:20-18:50 CDR Search for ТА251М1Б(ЛКТ) and ТА765Б(ПЗУ) devices
17:20-18:30 FE-1 Relocating ГАНК Gas Analyzer Accessories
17:55-18:45 FE-2 EVA tool config
18:30-19:30 FE-1 Physical Exercise (TVIS), day 2
19:20-20:30 FE-2 OBSS OSE Pre-EVA Configuration
19:25-19:35 CDR On MCC GO Mate Telemetry Connectors to БИТС2-12
19:30-19:45 FE-1 DCS 760 camera config for EVA
19:35-19:50 CDR Installing cable 17КС 10Ю8210А-5650 behind SM panel
19:45-19:55 FE-1 Monitoring Secondary Purification Unit Temperature After Elektron Activation
19:50-20:35 MS1
STS to ISS Attitude Control Handover
19:50-20:20 CDR
19:55-20:10 FE-1 Private Medical Conference (S + Ku-band)
20:30-22:00 CDR Physical Exercise (TVIS), day 2
20:30-20:40 FE-1 Pre-EVA Periodic Health Status (PHS) Examination
Page 2 of 2
20:30-20:40 FE-2(subj) Crew Health Status Before EVA
20:40-21:00 FE-1 Pre-EVA Crew Health Status: data transfer
20:45-20:55 FE-2 PAO hardware setup
20:55-21:05 FE-2 Crew prep for PAO
21:05-22:05 FE-1 Physical Exercise (RED)
21:05-21:30 FE-2 PAO Event (S+Ku-band)
21:30-21:35 FE-2 PAO Educational Event (P/L ) (S+Ku-band)
21:35-21:50 FE-2 Private Medical Conference (S + Ku-band)
22:00-22:05 CDR Transfer TVIS/RED/CEVIS/HRM data to MEC
22:10-22:25 . Daily Planning Conference (S-band)
22:20-23:20 . EVA procedure review
23:20-23:35 CDR Private Medical Conference (S + Ku-band)
23:20-23:35 FE-1 Evening work prep
23:35-00:05 CDR,FE-1 DINNER
23:40-00:30 FE-2 Dinner, Pre-sleep
00:05-00:35 CDR,FE-1 Daily Food Prep
00:30-01:35 FE-2 Start pre-breathe
00:35-01:35 CDR,FE-1 Pre-sleep
01:35-10:05 . SLEEP
GCF-JAXA. ТБУ(Universal Biotechnology Thermostat) temperature check
Task List FE-1
PLANTS-1. Payload status check

Note: 1. See OSTP for references to US activities.


2. Tagups with specialists are scheduled during БОК-3 R&R.
Refer to OSTP for S-band allocated to the tagups.

End of Radiogram