Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

August 2, 2007 Vol. 12, No.

56

Leak found on Endeavour Phoenix launch


to be fixed today set for Saturday
Shuttle Update: At Launch Pad Walk-Run at 5 p.m. on Sept. 18 at the cated between Headquarters Building
39A, Endeavour's payload bay doors Shuttle Landing Facility. The 2-mile rooms 1533 and 1537, across from the
have been closed for flight. Functional walk-run, 5K run and 10K run are free post office. The archives feature the 45th
testing of the spacesuits is complete. The for all spaceport employees. Stop by anniversary of Kennedy Space Center in
shuttle ordnance connections have been either fitness center by Sept. 14 to pre- a photo exhibit of early construction, as
made. Orbiter aft closeout work contin- register. Late registration will take place well as progressive construction, of the
ues. Engineers are working to resolve an at the race. T-shirts may be ordered at center. Further information may be ob-
abnormal leak rate in the orbiter crew any NASA Exchange store beginning tained by calling the KSC Library Ar-
cabin. The problem has been traced to Aug. 13. The order deadline for T-shirts chives at 867-2407.
one of two positive pressure-relief valves is Sept. 7 with approximate delivery and
pickup date of Sept. 17. If you are inter- Education Opportunities — War-
which ensure that the crew cabin does not ner Southern College is offering a
become over-pressurized. A plan has ested in being a volunteer, please call
867-7829 or e-mail Debra Orringer at bachelor's degree program in organiza-
been approved to remove and replace the tional management at its Titusville loca-
suspect valve using a valve from Atlantis. Debra.L.Orringer@nasa.gov with any
questions. tion beginning in early September. The
This work will be completed today. format of the program is for adult stu-
After further analysis of data, engi- dents who apply their professional learn-
NASA Exchange Jewelry Sale —
neers have determined that it will not be The jewelry sale will be in the MFF cafe- ing to the coursework. Classes will be
necessary to remove and replace thermo- teria from 8 a.m. to 5 p.m. today and Fri- held Tuesday evenings and one Saturday
stats on APU No. 1. The thermostat data day. Items range from $5 to $10. per month for 16 months. Warner South-
characteristic, while not customary, is not Acceptable forms of payment are cash, ern also offers associate's and master's
in violation of specifications and is un- Visa or MasterCard only – no checks. programs. Please call 254-4096 or 751-
derstood by engineers. Therefore, this 4665 for details.
will not require further action prior to the Ride And Drive The Clean Energy Barry University will be hosting an
STS-118 mission. Liquid-Hydrogen-Fueled BMW Open House from 10 a.m. to 1 p.m. on
Hydrogen 7 — This week is your Saturday at its Home Depot Plaza site
ELV Update: Friday's scheduled chance to ride and drive the technology
launch of NASA's Phoenix Mars Lander located at 135 E. Merritt Ave. on Merritt
loaded BMW Hydrogen 7. Look for the Island. Barry offers five, eight-week
aboard a United Launch Alliance Delta II canopy and the Clean Energy vehicle in
rocket was postponed 24 hours. The two terms per year with classes scheduled
the parking lot at the locations and times
available launch times on Saturday are evenings and weekends. The fall semes-
below. You will need a valid driver’s li- ter begins Aug. 13. For more information
5:26:34 a.m. and 6:02:59 a.m. cense and must register with the BMW
Due to a forecast for severe weather or to meet with an advisor, please call
representative at the vehicle. 321-453-6253 or e-mail Lynn Grant at
around the CCAFS launch pad on Tues- Today: OPF III, 8 to 10 a.m.; SSPF, 11
day afternoon, fueling of the second stage lgrant@mail.barry.edu.
a.m. to 1 p.m.; OSB II, 2 to 4 p.m.
was not completed. Fueling was finished Countdown is published every Tuesday & Thurs-
Wednesday but there was insufficient Friday: O&C, 8 to 10 a.m.; LCC, 11 a.m.
to 1 p.m.; HQ, 2 to 4 p.m. day for NASA KSC employees. Deadlines are
contingency time in the schedule to move 10 a.m. Mondays & Wednesdays. E-mail news to
forward with the launch on Friday. KSC Library Archives Photo Dis- anita.barrett@jbosc.ksc.nasa.gov. For questions or
play In August — The KSC Library Ar- information, e-mail or call 321-867-2815. You can
KSC Fitness Centers’ 2007 Inter- also find Countdown on the Web at
center Walk-Run — The KSC Fitness chives regularly exhibits its collection of
historical photographs for viewing by the nasa.gov/centers/kennedy/news/countdown/co
Centers will be sponsoring the Intercenter untdown-toc.html.
KSC community. The display case is lo-

www.nasa.gov

You might also like