FORT WAINWRIGHT

REAL PROPERTY PLANNING BOARD

Kate Siftar
19 December 2008

Real Property Vision


We are the Army’s Arctic community providing sustainable
facilities responsive to the nation’s defense, the training and
deploying of our Warrior’s, the care and security of our Soldiers
and families – working in harmony with the last great Frontier.

UNCLASSIFIED
Real Property Planning Board
Agenda

• Introduction
• Master Plans Status
• Land Use Map
• Recent Site/Environmental Survey Approvals
• Future Year Defense Program (FYDP) 2008-2015
• Proposed FYDP changes
• Future Military Construction Project Priority
• Sustainment, Restoration, Modernization Project Priority
• Initiatives
• Utilities Privatization
• Residential Community Initiative
• First Sergeant’s Barracks Initiative

UNCLASSIFIED
INTRODUCTION

Real Property Planning Board

Act as the installation "city planning council" to ensure the orderly


development and management of installation real property in
support of missions, management processes, and achieving
community objectives.

• Semi-annual meeting required per AR-210-20


• Planning Staff Introduction

UNCLASSIFIED
Master Plan Status

Real Property Master Plan


AR 210-20
1. Digest – Document that provides an analysis of what the installation will look like in
the near future. Identifies forces of change, constraints and solutions to deficiencies.
– 90% complete.
– Final Submittal ECD 30 Jan 09
2. Short Range Component (SRC) – Future Year Defense Program (FYDP) 2008-2015
– Current
3. Long Range Component (LRC) – Outlines strategic and long-range (20-50 years)
plans for the installation.
– TBD
4. Capital Investment Strategy (CIS) - Outlines the strategic investment alternatives for
real property investments in support of the installation’s missions, including tenant
missions.
– Needs to be Updated, completed Sep 03
5. Installation Design Guide (IDG) – Sets exterior standards and planning criteria that is
integrated into all design and construction contracts, renovation, maintenance, or
repair projects.
– Completed Nov 06
UNCLASSIFIED
Master Plan Status

Area Design Guides

• Warriors In Transition Complex (WIT)


– 35% submittal Aug 08
– Final ECD Feb 09
• Area Design Guide (ADG)
– Developed to ensure architectural themes and appearances are consistent
for MILCON projects.
– May 08 pre-final submitted
– 8 Jul 08 Stop Work Order issued to John Gallup and Associates because of
a dispute regarding the requirements of the contract.
– 21 Oct 08 notice to proceed with pre-final submittal
– Draft Final 31 Dec 08

UNCLASSIFIED
UNCLASSIFIED
Preliminary Environmental Survey

• Required for all MILCON by AR 450-1 (ref DA Pam 415-15)


– Outlines the environmental condition and/or constraints of a
proposed site

• 23 July 07 IMCOM Memo

– AR 415-15
• Garrison Commander responsible for environmental survey
• Region Director certifies site categorization

– AR 210-20
• Regional Director approval for project site

UNCLASSIFIED
Site Approval
Preliminary Environmental Survey

FY Project # Description Site Approval PES Approval

FY09 34129 Training Support Center Complete Approved 7 Aug 2008

FY09 61530 Barracks Complex Complete Approved 5 Nov 2008

FY09 63006 Stryker Wash Facility Complete Approved 5 Nov 2008

FY09 63080 Organizational Vehicle Parking Complete Approved 29 July 2008

FY10 61503 Railhead Operations Facility PH2 Complete Approved 3 Jan 2008

FY10 61507 3rd Air Support Operations Facility In progress In progress

FY10 65076 Aviation Task Force Complex, Ph 1 In progress In progress

FY10 71541 Warriors in Transition Pending RD Signature Pending RD Signature

UNCLASSIFIED
Training Support Center

Training
Support
Site

UNCLASSIFIED
Barracks Complex

Barracks
Site

UNCLASSIFIED
Stryker Wash Facility

Stryker Wash
Facility Site

UNCLASSIFIED
Stryker Maintenance Hardstands

Stryker
Maintenance
Hardstands Site

UNCLASSIFIED
Warriors in Transition Complex

Warriors in
Transition Site

UNCLASSIFIED
Railhead Operations Facility Phase II

Railhead OPS
Site

UNCLASSIFIED
3rd Air Support Operations Facility

3rd ASOS
Site

UNCLASSIFIED
Aviation Task Force Complex Phase 1

Security
Fence

Oil/HAZMAT
Storage

Aircraft Parts
Storage

Vehicle
Barracks
Maintenance

UNCLASSIFIED
FY 2008-2015
Military Construction Projects

UNCLASSIFIED
Fort Wainwright
FYDP FY08 –FY09

FY08
 Child Development Center (SAS) FWA $ 16.0M Quality of Life (Supplemental Add)
 Company Operations FWA $ 14.0M Operations
 Replace Substation & Upgrade Electric FWA $ 60.0M Infrastructure
 RCI Scoring FWA $ 25.0M Quality of Life
 Railhead Operations, Ph 1 FWA $ 8.9M Deployment
 Barracks - GTA FWA $ 20.0M Quality of Life
 Unit Ops Facility – GTA FWA $ 11.6M Operations
Total $155.5M

FY09
 RCI Scoring FWA $ 30.0M Quality of Life
 Training Support Center FWA $ 12.4M Readiness
 Tactical Vehicle Wash FWA $ 21.0M Deployment
 Organizational Vehicle Parking FWA $ 14.4M Maint & Ops
 Barracks Complex FWA $ 63.0M Quality of Life
Total $140.8M

UNCLASSIFIED
Fort Wainwright
FYDP FY10 –FY11

FY10
 RCI Scoring FWA $ 52.0M Quality of Life
 Aviation Task Force Ph 1 FWA $125.0M QOL/Maint & Ops
 Air Support Operations Facility FWA $ 19.0M Maint & Ops
 Railhead Operations Facility Ph 2 FWA $ 26.0M Deployment
Total $222.0M

FY11
 Aviation Task Force Ph 2 FWA $161.0M QOL/Maint & Ops
 Urban Assault Course FWA $ 6.4M Readiness (New)
Total $167.4M

UNCLASSIFIED
Fort Wainwright
FYDP FY12 –FY13

FY12
 Aviation Task Force Ph 3 FWA $111.0M QOL/Maint & Ops
Total $111.0M

FY13
 Brigade Headquarters (AVNTF Ph 4) FWA $ 61.0M QOL/Maint & Ops
 Barracks FWA $ 76.0M QOL (New)
 Modified Record Fire Range FWA $ 9.8M Readiness
 Automated Pistol Range FWA $ 6.4M Readiness
Total $ 153.2M

UNCLASSIFIED
Fort Wainwright
FYDP FY14 –FY15

FY14
 Readiness Training Center FWA $ 22.0M Readiness
Total $ 22.0M

FY15
 SBCT Complex FWA $ 138.0M QOL/Maint & Ops
Total $ 138.0M

UNCLASSIFIED
Fort Wainwright
MILCON FY11 Change Proposals

Project PA Remarks

Aviation Task Force, Phase II $161M USACE Centers of Standards proposed


hangar standard for 100% indoor warm storage
Additional 52,000 SF = $32M = Total $192M

Pedestrian Overpass $3.0M Project was appropriated but not authorized


in the FY09 MILCON bill.

Military Working Dog Facility $4.5M Additional working dogs will arrive FY09 without
facilities to house and care for animals properly.
Current facility has failed inspection.

Urban Assault Course $6.4M Project can be deferred without significant impact
to readiness. Offered to offset the pedestrian
overpass and working dog facility inserts in FY11.

UNCLASSIFIED
Pedestrian Access Bridge for Live-Fire PN 65217

Badger
Gate Access

Pedestrian Bridge

Project Scope: Construct a covered pedestrian


overpass bridge to the Live-Fire training ranges,
across the 4-lane Richardson Highway.
FY 2011
Impact if not provided: By constructing the
pedestrian overpass, soldiers will have a safe, PA: $2.95M
direct route to the Live-Fire training ranges that will
maximize their training time.

UNCLASSIFIED
Military Working Dog Complex PN 61224

River Rd.
PN 61224

Project Scope: Construct a Military Working Dog


Complex that consists of a 3369 SF Military
Working Dog Facility, a 400 SF Storage Shed, a
150' x 150' Obedience Course, a 20' x 40' Exercise
Area, a 10' x 20' Military Working Dog Break Area, FY 2011
and 8-ft. chain link fencing for each of the special
areas and, around the whole complex. PA: $4.5M
Impact if not provided: Current facility capacity is
6 dogs. There are 5 dogs and 3 more incoming
with trainers this year. Facility failed last 4 yrs of
veterinarian inspections, USARPAC PM Tech.
Assist Visit and HQDA FP Assessment.
UNCLASSIFIED
Future Military Construction Project
Priority

1-N Milcon

UNCLASSIFIED
1-N MILCON

Project # Project Title Proposed PA ($000) FY

68854 Construct Company Ops and TEMF 78,000 2016


14453 Education Center 25,000 2016
61526 Child Development Center (<6yrs) 15,000 2016
62305 Initial Staging Base (DTA) 30,000 2016
61502 Police/Military Police Station 30,000 2016
65728 Indoor Range 26,000 2017
61524 Replace Bailey Bridge 6,900 2017
61225 In-Out Processing with ACS 15,000 2017
61821 Truck Loading Complex 14,400 2017
61505 Replace Fire Station #2 16,500 2017

UNCLASSIFIED
Construct Company OPS PN 68854

Project Scope: Construct 2 Company Operations Facility to include


enclosed hardstand, a vehicle maintenance facility, organizational
storage, organizational parking and a UPH Barracks. FY 2016
Impact if not approved: If this project is not provided, there will not be
adequate permanent facilities to support the GTF initiative. These units PA: $78M
arrived in FY2008/2009 and require permanent operational facilities in
order to perform their mission. Priority 11

UNCLASSIFIED
Education Facility PN 14453

Project Scope: Construct a 40,875 sf facility housing a


combined Army Continuing Education Services and
main library.
Impact if not approved: If this project is not provided,
the educational facilities and library at Fort Wainwright
will remain in scattered, degraded facilities. The current FY 2016
efforts for facility reduction and space management will
not be assisted without the consolidation of these PA: $25M
facilities. Basic quality of life programs will not be
available for division personnel and will have a negative Priority 12
impact on morale within the military community.
UNCLASSIFIED
Child Development Center (<6yrs) PN 61526

Project Scope: Construct a standard design 303-person


capacity Child Development Center at Fort Wainwright, Alaska.
The Child Development Center shall include space for food
service; infants, toddler, preschool, kindergarten, and hourly
care age activity modules.
Impact if not provided:
The off-post local area has a limited supply of child care
centers that are more expensive and a number of the child FY 2016
care centers are not accredited. To meet the needs of the
installation as it continues to grow due to re-alignment an PA: $15M
adequately sized and state of the art facility is required.
Priority 13
UNCLASSIFIED
Brigade Intermediate Staging Base (DTA) PN 62305

Project Scope: Construct an Initial Staging Base (ISB) in


the Donnelly Training Area . The ISB will consist of: an
enclosed food preparation area, dining areas, unisex
latrines and showers, barracks, company and battalion
administrative area, gravel pad for parking, maintenance
bay and wash facilities.
Impact if not approved: Units will continue to lose valuable
training time and incur an increased cost associated with
logistics. The Soldiers will continue to endure harsh winter FY 2016
and summer conditions without logistical support facilities.
This will weaken the units ability to effectively and efficiently PA: $30M
focus all of its training efforts on its war time mission.
Priority 14
UNCLASSIFIED
Construct PMO & CID Facility PN 61502

Project Scope: Construct a combination Provost Marshal


Office and Criminal Office. Construction will include admin
office areas, holding areas for suspects, separate holding
areas for personnel, suspect observation room, suspect
processing room, and suspect facilities.
Impact if not approved: The Provost Marshal Office and the
Criminal Investigation Office will continue to function in ill-
equipped and inadequate spaces. The buildings currently FY 2016
utilized for these offices are becoming hazardous due to the
age of the buildings and the electrical systems. The lack of PA: $30M
adequate space directly affects the ability to conduct
investigations, interrogate suspects, store evidence and Priority 15
properly confine suspects.
UNCLASSIFIED
Construct Indoor Firing Range PN 65728

Project Scope: Construct an Indoor live-fire range for


weapons zero, qualification, and night fire training. Project will
provide a 15 firing point lit, heated, covered, protected
environment to allow live fire training during the winter months
and night fire training during summer months.
Impact if not approved: If the project is not provided, Soldiers FY 2017
will continue to endure the harsh winter months to conduct zero
qualification and live-fire training. The arctic conditions directly PA: $26M
impact the ability for Soldiers to conduct year round weapons
training. Priority 16
UNCLASSIFIED
Replace Bailey Bridge PN 61524

Existing Single Lane Bailey Bridge


Project Scope: Replace the current one lane Bailey
Bridge (208 feet long) on the east end of River Road
with a new, wider bridge. Supporting facilities include
utilities; electric service; exterior lighting; fire protection
and alarm systems; paving, walks, curbs and gutters;
parking; erosion control and storm drainage; site
grading and contouring; information systems; site
improvements; and power distribution extension FY 2017
service.
Impact if not approved: If this project is not provided, PA: $6.9M
Soldiers will continue to experience limitations during
driver training and restricted traffic flow. Priority 17
UNCLASSIFIED
In-Out Processing Center PN 61225

Project Scope: Construct a 14,270 sf. facility that will


house all facets of a one-stop facility for in and out
processing of military personnel and their family members
to Fort Wainwright. The current facility cannot support all
the functions that Military personnel and their dependents
encounter while processing in/out of Fort Wainwright,
Alaska and does not meet ALL requirements of the
American Disabilities Act.
Impact if not approved: If this project is not provided,
FY 2017
Soldiers will continue to undergo lengthy in-processing
and out-processing operations. PA: $15M
Priority 18
UNCLASSIFIED
Truck Loading Complex PN 61821

Project Scope: Construct a truck loading/unloading


complex with ten truck multi-level loading positions,
adjacent supporting hardstand, operational lighting, an
operations facility, a high bay storage building, and
security fencing for AT/FP and lock-down of deploying
unit equipment. FY 2017
Impact if not approved: The existing truck ramps will
not meet the Army's surface deployment requirements of PA:
the SBCT. Without this truck loading complex, the
installation will not meet its equipment and line-haul $14.4M
transfer requirements for moving cargo to the Port of
Anchorage. Priority 19
UNCLASSIFIED
Replace Fire Station #2 PN 61505

Project Scope: Construct a two-company satellite fire


station (12,331 sf.) to replace an older fire station that
cannot accommodate the oversized fire fighting
apparatuses. This project will provide three-drive thru
stalls for four or more pieces of fire-fighting equipment,
male and female shower and toilet facilities, and
dormitory rooms for two Fire Companies (nine
personnel).
Impact if not approved: Current facility is too small to
FY 2017
accommodate the size of the fire fighting apparatuses.
Alternative methods of meeting this requirement have PA:
been explored during project development. This $16.5M
project is the only feasible option to meet the
requirement. Priority 20
UNCLASSIFIED
Sustainment,
Restoration, and
Modernization (SRM)
Projects
Presented by:
Ed Chacho
Facility Management
Public Works

UNCLASSIFIED
Initiatives

-Utilities Privatization

- Residential Community Initiative (RCI)

-First Sergeant’s Barracks Initiative

UNCLASSIFIED
Utilities Privatization (UP)

Doyon Utilities, a joint venture between Doyon Properties and Fairbanks


Sewer & Water, was awarded utility privatization contracts for United States
Army Forts Wainwright, Richardson, and Greely in Alaska.

• August 15, 2008


• Utilities Included at Fort Wainwright Include
•Central Heat and Power Plant & Heat Distribution System (Steam)
•Electrical Distribution System
•Water Distribution System & Water Treatment
•Wastewater Collection System
• MILCON Construction Test Case FY10
•Stryker hardstand and Wash Facility

UNCLASSIFIED
Residential Communities
Initiative (RCI)

• Community Development Management Plan for Forts Wainwright & Greely completed and
approved by Congress in November 2008
• Property Management Offices (Government & Partner) preparing for the transition to North Haven
Communities
• Operational close, 29 Jan 09; financial close, 24 Mar 09
• Actus currently working with the Government & UP to determine, metering and responsibilities within
the RCI footprint
• Health & Safety Officer working on procedures for transition to privatized housing site

Inventory
• 1850 units at FWA will transition to the partner through out the next 5-6 years
• 19 units in historical district – converted to Admin Space, leaving only one unit (Qtrs 1) inside of the RCI footprint
• All Sustainment, Restoration, and Modernization (SRM) projects completed by Nov 08 with the exception
of the Denali Village bike trail which will be completed in the summer 09

UNCLASSIFIED
UNCLASSIFIED
First Sergeants Barracks Initiative (FSBI)

• Key component of Army’s Holistic Barracks Strategy


• Standardize management of Single Soldier Housing Army-wide
• Concept is based on centralized barracks management
• Improves quality of life for single Soldiers
• Improves barracks utilization rate
• Reduces damage to buildings by holding Soldiers accountable

FWA
• Program implemented in phases
• WTU has been under FSBI for 1 year
• 472nd operating under FSBI for 6 months
• Aviation Brigade started this month

UNCLASSIFIED
Questions ?

UNCLASSIFIED
Next Meeting

• Tentatively June 2009


• Agenda
• Construction Requirements Review Conference
Fall submittal FY12-17 project priorities
• Master Plan/Real Property updated information
• What would you like to see on the agenda?

POC Kate Siftar 361-3315, kate.siftar@us.army.mil