FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING BACHELOR IN BUILDING SURVEYING (AP229)

BSB 553 BUILDING DESIGN PROJECT I (ALTERATION & STRUCTURAL DESIGN) REFURBISHMENT MINI PROJECT ADMINISTRATIVE OFFICES OF FACULTY LAW, UITM SHAH ALAM.

PREPARED BY: HIJARATUL ALIF BT MANAP 2010762175 NOR HAYA BT YAHAYA 2010302627 PREPARED FOR: PN. WAN ZURIEA BT WAN ISMAIL

1|Page

ACKNOWLEDGEMENT Thank for our grateful Allah S.W.T because with his blessing our group have successfully finished our assignment. A bunch of thank to the group member because together spend the time to do discussion. We have successfully finished this assignment because of the group member play their role to make sure this assignment can be submitted exact to the time. We want to take this opportunity to say thank you to our lecturer Pn. Wan Zuriea bt Wan Ismail because of her guide, we can easily completed our assignment. Special thank to our parent who always give us encourage to us to complete the entire task that have been given by the lecturer. Thank you to the all party who are involve into this assignment whether in direct or direct situation.

2|Page

TABLE OF CONTENTS

ACKNOWLEDGEMENT TABLE OF CONTENT INTRODUCTION OBJECTIVE METHODOLOGY 1.0 CASE STUDY 1.1 BUILDING BACKGROUND 1.2 OBJECTIVE & REASON OF REFURBISHMENT WORK 1.3 PROCESS OF REFURBISHMENT WORK 1.4 PROBLEM OCCURS AFTER REFURBISHMENT 1.5 COMMENT CONCLUSION RECOMMENDATION REFERENCES APPENDIX

I II III IV V 7 8- 10 11 12 12 -13 14 15 15 16 17

3|Page

INTRODUCTION Building refurbishment is still a new phenomenon in Malaysia. However, in overseas country like European Union and United Kingdom was being widely used building refurbishment. This is because there are many old building which can be repair and maintenance. Building refurbishment and adaptation like maintenance, repair, restoration and extension is known as repair and maintenance. There are few factors that make the refurbishment project will be need. For example, deterioration of the building, Obsolescence of building and the economic cycle like inflation, interest rates, rates of economic growth and change in customers requirement. It is also help to retain buildings of architecture value and it may be less expensive than new building. For every building which has been change in use through refurbishment, the extraction of raw materials and the manufacturing process and energy involved in converting these into a completed replacement building are voided to the undoubted benefit of the environment. When doing the refurbishment we must consider special planning, design and construction needs. This is important to make sure the refurbishment work go on track and know the cost to do it. Usually, work required to refurbish of existing building need less time than the alternative of demolition, site clearance and the construction of new building. Administrative offices of faculty law are a building which has been refurbishment from food court to office space. The internal bodies in UiTM involve help to make this project become efficiently. However, the effectiveness of implementing the process is still in question which each organization has set up the process in different ways.

4|Page

OBJECTIVE OF THE STUDY The objectives of assignment are to skills in: Preparing as-built drawing Carrying out survey/investigation on the case study building Evaluating & appraising the performance of the case study building.

5|Page

METHODOLOGY LECTURER GIVE A TASK AND BRIEFING ABOUT DESIGN

DESK STUDY

SITE VISIT

REPORT AND PRESENTATION

DATA COLLECTION AND ANALYSIS

In these studies, there are two method of methodology, primary and secondary method: Primary method Primary method is the methods that have been taught by our lecturer. Our lecturer gave a input in all fact about this course without any reference. In this method, lecturer have taught about what is refurbishment of building and how the process to do it Secondary method Secondary method is the method where the entire lecturer taught can be applied in our case study. One group has formed to go to the site and do the investigation about refurbishment in building. One group is about 2 student is form and do their work in the site. In the site, we all use viewed method, snap some picture and interview to this owner to collect some information. All information that got by each students is combine and bring back to the class and make a research. We used information from interview for reference. Some information has been given by lecturer. By using all this method, we have explored about the process of refurbishment and learn it at the same time.
6|Page

CHAPTER 1 CASE STUDY - ADMINISTRATIVE OFFICES OF FACULTY LAW, UITM SHAH ALAM.

FIGURE 1 SHOWS THE KEY PLAN TO ADMINISTRATIVE OFFICE OF FACULTY LAW, UITM SHAH ALAM.

2.0 BUILDING BACKGROUND University Technology MARA (UiTM) is a coeducational public university with its main campus located in Shah Alam, Selangor. It is largest university in Malaysia in terms of size and student enrolment and the only public university carrying out intakes twice a year. The whole university area occupies an entire section on the western hills of the city known as Seksyen 1. Shah Alam is the state capital of Selangor, Malaysia situated within the Petaling District and a small portion of the neighbouring Klang District.
7|Page

FIGURE 2 SHOWS THE UNIVERSITY TECHNOLOGY MARA (UITM) SHAH ALAM For this assignment we had choose administrative office of faculty law, UiTM Shah Alam. This building was being refurbishment from college Cempaka food court to administrative office area. This building was being started constructed on 1969 and was be used since 1972. It age was 40 years old. It located near to College Perindu and college Kenanga. The building was be refurbishment on 2007, and was be operation as administrative office on 2008. It cost to make the refurbishment about RM 1.5 million.

8|Page

a) Left elevation

b) Front elevation

c) Surrounding image

d) Right elevation

e) Roof elevation

f) surrounding image

FIGURE 3 SHOW THE EXTERIOR BUILDING IMAGE OF ADMINISTRATIVE OFFICE OF FACULTY LAW IN DIFFERENT ANGLE.

9|Page

10 | P a g e

FIGURE 4 SHOW THE INTERIOR BUILDING IMAGE OF ADMINISTRATIVE OFFICE OF FACULTY LAW IN DIFFERENT ANGLE. 2.1 OBJECTIVE AND REASON WHY OF REFURBISHMENT The objective of the refurbishment is to provide office space for faculty law to do administrative works. This is because the faculty law dont get enough space to allocate its office. The refurbishment also intends to improve the function and safety of the building. The building was being repair and renovate by contractor and subcontractor. According to unit facility UiTM Shah Alam the refurbishment was is made by according to request of end user to them.

FIGURE 5 SHOWS THE ADMINISTRATIVE OFFICE OF FACULTY LAW, UITM SHAH ALAM WHICH HAVE BEEN CHANGED FROM COLLEGE CEMPAKA FOOD COURT.

2.2 PROCESS OF REFURBISHMENT WORKS Refurbishments works only will be done when application from end user or by the university itself. Usually end user will sent application to manager of facilities management to upgrade or to make refurbishments of the building. The manager
11 | P a g e

facilities management will send the application to project department. This department will decided which officer will be conducted to the application. The selected of officer is depend on knowledge and have courses must be attend. The officers are selected by head of project department. After this stage, officer, head of project department and other people who responsible with the project will go on site to check the real condition of the building. Sometimes, they will give the project immediately to contractor. The cost to be estimate is difficult to get because we must refer to Jawatan Kuasa Ubahsuai Dalaman (JKUDL). JKUDL will make a meeting to determine the budget was being approved. After all process was be agreed the next process will be conducted until the contractor will be choose. This budget is depending on budget of Kementerian Pengajian Tinggi (KPT). If no budget, the faculty also can use their fund to construct the refurbishment project. For refurbishment in the UiTM which just internal only, no need to make application to local authority.

2.3 PROBLEM OCCURS AFTER REFURBISHMENT There are some problem occur after refurbishment of the college Cempaka to be change to administrative of faculty law, UiTM Shah Alam. According to the building user in the past 2 years, the ceiling at first floor was being collapse and there was appear a leakage in the toilet at down stair. However, the facilities unit was repair this failure. From our research we also see some crack at the wall of the building. This happens maybe from installation of electrical appliances.

12 | P a g e

FIGURE 6 SHOW THE DAMPNESS AT COLUMN. ITS HAPPEN AT IN FRONT OF ADMINISTRATIVE OFFICE. THE DAMPNESS OCCURS DUE TO THE PRESENT OF AIR AND WATER.

FIGURE 7 SHOW CRACK AT WALL. THIS DEFECT HAPPENS DUE THE RATIO OF CONCRETE. BESIDES THAT, THE MATERIAL FOR EXAMPLE BRICKS THAT HAVE BEEN USING ARE NOT IN GOOD QUALITY. MOREOVER, THE WALL CRACKS DUE TO THE WALL DOES NOT SUPPORT THE LOAD.
13 | P a g e

2.4 COMMENTS STRENGTH The building appearance and performance was improve when make refurbishment. There space of food court which before appear not attractive, now it was be divided into partition which consist of administrative office, gallery, seminar room, meeting room, library, department deans room, store room, pantry and also record room. The space area of building now is not like a food court anymore and looks like a office place. WEAKNESS For fire safety requirement this building is less provided of fire safety device. This is because there is less of equipment for fire protection for example fire extinguisher, fire alarm, fire hydrant, hose reel system and emergency lighting. OPPORTUNITY This building is located near to faculty of law and cafeteria on the second floor of the building. It also consists of surau for the staff and student to pray. THREAT If appear any fire spread in the building, the occupant will hard to extinguisher the fire. This is because there is less provided of fire protection equipment.

14 | P a g e

CONCLUSION As a conclusion we found that refurbishment for this building as to prolong maintain of the building. Refurbishment happens in this building due the lack of space. Besides that, the budget must have to do the refurbishment works. At the case study is a very strategic location and very convenience for the occupants in the building.

RECOMMENDATION For the recommendation, we think that, for this building must have a landscape for the attraction to the people that entering this building. Moreover, to maintain this building must have the schedule for preventive maintenance. For the fire safety at this building must be improve due the safety does not fully carried out.

15 | P a g e

REFERENCES:

1. PEJABAT PENGURUSAN FASILITI UITM SHAH ALAM. (BAHAGIAN REKABENTUK DAN BAHAGIAN AUDIT DAN KUALITI) 2. PEJABAT PENTADBIRAN FAKULTI UNDANG-UNDANG

16 | P a g e

APPENDIX

17 | P a g e