OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1 (1) .02
OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1 (1) .02
www.huawei.com
Contents
1. Routine Maintenance
1.1 IDU maintenance items 1.2 Out door units maintenance items 1.3 Maintenance Items on NM system
Page1
Red color: critical or major alarm Yellow color: minor or remote alarm Green color: no alarm
Green color: board running normally Red color: board has hardware fault Off: board not running, not be created in NMS or power off
Page2
Yellow color: bit errors exceed the threshold Off: bit error is ok
Green color: ODU running normally Red color: ODU has hardware fault
Page3
months.
Page4
Contents
1. Routine Maintenance
1.1 IDU maintenance items 1.2 Out door units maintenance items 1.3 Maintenance Items on NM system
Page5
It is recommend to perform the operations in every half year or after a fresh gale.
Checking the ODU Checking the hybrid coupler Checking the antenna Checking the IF cable
Page6
Protection area of the lightning arrester. Connections between ODU to hybrid coupler and antenna. Water-proof checking for the interfaces. Status of protection grounding cable. Surface of ODU.
Page7
Protection area of the lightning arrester. Connections between hybrid coupler to ODU and antenna. Water-proof checking for the interfaces.
Page8
Antenna radome should be intact. Water accumulation in antenna. Position and direction of antenna.
Page9
Page10
Contents
1. Routine Maintenance
1.1 IDU maintenance items 1.2 Out door units maintenance items 1.3 Maintenance Items on NM system
Page11
When the T2000 Web LCT is available on site or equipment is managed by T2000:
Querying alarms Querying performance Querying abnormal events Querying the receiving power of the ODU Testing protection functions once every half year
Page12
Summary
Observing the indicators in IDU Testing the orderwire phone Cleaning the air filter Cleaning the equipment room
Maintenance operations via LCT and NMS: alarm, performance, power querying
Page13
Contents
1. Routine Maintenance 2. Common Maintenance Operations
Page14
Replacing an ODU
ODU power off. Disconnect cable. Uninstall ODU. Install the new ODU.
Step 2: Unlock the ejector levers of the board so that the board is disconnected from the backplane.
Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved. Page16
Plugging In a Board
Step 1: Slowly inserting the board along the guiding rail. Step 2: Lock the ejector levers of the board.
Page17
Replacing an IF Board
Active/standby board switch or SNCP switch. ODU power off and IF cable disconnect. Replace the new IF board and connect IF cable. Observe the indicators. Turn on ODU power. Restore active/standby board or SNCP service. Monitor status of the new IF board.
Page18
Remove the SCC board and make sure the spare SCC board is consistent with it.
Monitor the indicators, and check the status of the running SCC board by Web LCT.
Page19
IDU
In Door Unit
ODU
BER IF
NMS
SCC
Page20
Summary
Replacing an ODU Precautions for replacing a board Replacing an IF board Replacing an SCC board
Page21