Progress Evaluation - Overview


Overview
Progress analysis is used to obtain information on the state of your project and how it is developing. This enables you to take corrective action if the project is varying from its plan. You can use the budget or the planned POC determined by the system to represent the planned services in Project System reports. Progress analysis supplies current data at all times while the project is running.

LANCO Group, All Rights Reserved

LANCO Group, All Rights Reserved

LANCO Group, All Rights Reserved

LANCO Group, All Rights Reserved

Progress Evaluation - Prerequisite


Prerequisite for POC (Percentage of Completion) are:
Basic Start Date Basic End Date / Duration (on maintaining Duration Basic End date is calculate by the system Measurement method for POC POC weight for the WBS Actual Start Date (During Execution, to be given every month) Actual POC for the WBS (During Execution, to be given every month) Running CNE1 (to calculate the POC report by SAP)

LANCO Group, All Rights Reserved

Progress Evaluation Procedure Detail


1. In transaction code CJ20N open the Project required 2. Select the 2nd level WBS and in Dates Tab enter the Basic Start and Basic End date 3. Select the 2nd level WBS and in Progress Tab enter the POC Weight, Measurement method for plan and actual as TIME PRO. and ESTIMATION. 4. Similarly, Select all the 2nd level WBS and in Dates Tab enter the Basic Start and Basic End date 5. Similarly, Select all the 2nd level WBS and in Progress Tab enter the POC Weight, Measurement method for plan and actual as TIME PRO. and ESTIMATION. 6. Similarly, Select the 3rd / 4th / 5th / 6th level WBS of corresponding 2nd level WBS and in Dates Tab enter the Basic Start and Basic End date (can be same as 2nd level is not available) 7. Similarly, Select the 3rd / 4th / 5th / 6th level WBS of corresponding 2nd level WBS and in Progress Tab enter the Measurement method for plan and actual as TIME PRO. and ESTIMATION. Dont enter POC weight in 3rd / 4th / 5th / 6th, as we are calculating POC at second level. 8. During Execution stage, If the process for those WBS as started enter the Actual Start date in corresponding WBS Dates Tab.

LANCO Group, All Rights Reserved

Progress Evaluation Procedure Detail


9.During Execution stage, If the process for those WBS as started enter the Actual POC in percentage in corresponding WBS Progress Tab. Select the line item and select icon

10. Enter the Actual POC in percentage in corresponding Financial Period opened.
11. Carry out this activity for all those WBS for which work is going on for corresponding WBS follow procedure Point 9. 12. Save the Project. 13.Calculate Monthly Project Progress report. In transaction CNE1, Enter the Following 1.Project : Project ID, 2. With Hierarchy: Selected (to consider all WBS below) 3.With orders: Selected (to consider network/ order if any) 4. Progress version:100 (progress version) 5.To Period:(financial period) 6.Test Run: Not selected (test run is just a check functionality) System displays that system has calculated progress report.
LANCO Group, All Rights Reserved

Progress Evaluation Procedure Detail


14. To Display created Progress report Transaction code: CNE5, Enter data base profile as SAPPS_EV0001 Controlling area as 1000 Project: Project ID 15. System displays the Progress Report 16.System Displays Detail for that selected WBS for the total planned period (financial Period) 17. System Displays also in graphical format.

LANCO Group, All Rights Reserved

Progress Evaluation Procedure Detail


18. Create Snap shot of every month end report create Project version. Project Version is distinguished by version key, description and Version group. From progress Analysis Overview screen select Edit-Scope of current data-All fields
Version Group Project Name Version Key projectnamP01 (every next report will have running number of 02, 03, 04.) Description : can be anything to distinguish the report. Select continue to save the version.

19. In initial screen, select the DB Profile icon. Select the check box Version data in DB profile setting Select versions data check box and select versions for comparison by multiple selection Continue with Execute

LANCO Group, All Rights Reserved

Thank you