TWINNING PROGRAM

By. Ir. R. Agus Sutyoso MSi

PDAM Tirta Khatulistiwa, Kota Pontianak, Indonesia


Page 1

Twinning Program di PDAM Tirta Khatulistiwa


SAJ Ranhill malay : Water Safety Plan OASEN Holland : Technical assisten TRAINING CENTRE

Page 2

Twinning Program SAJ RANHILL


Bertujuan untuk :
Peningkatan SDM, tukar pengalaman, informasi, pengetahuan dan teknologi Membangun komitment untuk memproduksi air secara layak dan aman. Program peningkatan pelayanan pelanggan

Page 3

Water Supply and Public Health


Reduced diarrheal disease

Safe Food

Effective Sanitation

Good Hygiene

Safe Water

Hardware

Software

WHO Water Safety Framework

Page 4

What is a Water Safety Plan?

An approach

Water quality and health the focus A way of thinking about water supply

A (live) document A (continuous) process

Documentation at the heart of a WSP Initial document and regular updates For reference, learning and operation

System assessment AND operational monitoring All staff to participate


Page 5

Preparation

WSP - 11 Steps
Assemble the team to prepare the water safety plan Define monitoring of control measures - what limits define acceptable performance and how these are monitored

Describe the water supply system Assess the existing proposed system ( including a description of the system and a flow diagram)

Establish procedures to verify that the water safety plan is working effectively and will meet the health-based targets

System Assessment

Management & Communication

Undertake a hazard assessment and risk assessment to identify and understand how hazards can enter into the water supply

Prepare management procedures documenting actions to be taken when the system is operating under normal conditions (SOPs) and incident situations (corrective actions) Develop supporting programmes (e.g., training, hygiene practices, research and development, calibration of equipment, preventive maintenance, etc.)

Determine and validate control measures, reassess and prioritize the risks

Upgrade

Develop, implement and maintain an improvement / upgrade plan Revise the WSP following an incident

Page 6

Feedback

Plan and carry out periodic review of the WSP

Operational Monitoring

WSP DI PDAM TIRTA KHATULISTIWA


DIMULAI WSP DI WTP SELAT PANJANG

Page 7

BULAN MEI 2011

Pontianak Utara : Jumlah Penduduk : 112.225 jiwa Jumlah Pelanggan : 7.145 SR Distribusi Air Bersih : 318.540 m3 Air berekening : 201.475 m3

WTP 300 l/det

Pontianak Timur : Jumlah Penduduk : 78.022 jiwa Jumlah Pelanggan : 8.850 SR Distribusi Air Bersih : 381.510 m3 Air berekening : 218.830 m3

Page 8

LANGKAH WSP DI WTP SELAT PANJANG

Page 9

Page 10

Page 11

Page 12

Page 13

Page 14

Langkah 8 : Management prosedur : -Pembuatan SOP -Penanganan kejadian tak terduga Langkah 9 : Program pendukung : -Pelatihan staf -Pengadaan peralatan lab -Otomatisasi kran lumpur

Page 15

REKOMENDASI RANHILL
Perbaikan sistem produksi dan monitoring. Perbaikan injeksi kimia Perbaikan monitoring kualitas air Perbaikan pelayanan pelanggan dll

Page 16

SAMPEL POINT PEMERIKSAAN KUALITAS AIR

6 4 5 3 10 8 9 1&2 7

Page 17

TWINNING PRGRAM OASEN HOLLAND ( 3 tahun )


Pelatihan dan pilot project pemasangan pipa Pelatihan dan pilot project sistem filter Pelatihan dan workshop Pompa Pelatihan dan workshop NRW Pelatihan dan pilot project Distrik Meter Area Pendirian Training Center Dll.

Page 18

IMPACT WSP
PDAM

WSP PROCESS

SDM Pendapatan naik NRW menurun

Perbaikan Kualitas air


Pelang gan

Sehat Kepuasan Konsumsi naik

Page 19

Pendapatan air Vs NRW


NRW, 2008, 39.6% NRW, 2009, 34.3% NRW, 2010, 32.6% NRW, 2011,

28.6%

NRW Pendapatan

2008 39.6% 57,491,466,873

2009 34.3% 62,102,312,870

2010 32.6% 66,630,471,528

2011 28.6% 71,750,508,000

Page 20