SALIENT FEATURES
It is a modular unit. Optimal community size plant: 100 m3 capacity. Average Bio-gas production after 4-5 hours duration : 80-100 m3 Suitable for 40-50 families. All type of agro waste can be consumed. Presently we are using cow dunk (20%) and other agro-horticulture/other degradable waste what so ever available in the village except mud.
Weekly feeding :1875 kg agro waste. Bio-gas production is almost similar in every season. Moisture, H2S &Co2 (major part) are scrubbed. Easier maintenance While burning, the pressure is standard & equal at each user point. Minimum chances of leakage. Use-ful life of project is approximate 20 year.
It helps environment &help also in the cleanliness of village. Bio-gas in the Cylindersis stored at 300 psi pressure. It may be used for domestic power generation . Farmers/ users are transporting bio-gas through bio-gas balloon for their domestic/ agricultural uses .
Unit :1&2 :- Village: Mishrawallia Site at: Block : Mishrawallia Distt : Ballia State : U.P. No.of beneficiaries : 78 (If pipeline assistance is provided in addition it may be extended to 100) Type : Piped supply Major beneficiaries are from B.P.L. families
Secretary to Hon. Chief Minister , Govt. of U.P. and D.M. , Ballia Visiting The Ballia Bio-gas Unit . Chief Mason is explaining the technical facts of the project.
UNIT 3 :
Site at : Village : Mullahikhera Block : Sarojini Nagar Distt. : Lucknow State : U.P. No. of beneficiaries : 45 ( These facilities may be extended to about 1520 more beneficiaries) Type : Bio-Gas balloon supply Major beneficiaries are from B.P.L. families.
Principal Secretary , Dept. of Non-conventional energy , Govt. of U.P. (in red T shirt ) visiting the Mullahikhera , Lucknow community bio-gas plant
Replicating this Model into 200 different Villages/locations in the State. Bankable Model has been established. U.P. Govt.s contribution ( Proposed) : 25% of the project cost or maximum upto Rs. 5.00 lakh Recasting of100 cubic meter plant including all accessories for 50 families has been established it is be between Rs. 8.15-10.00 lakh. depends on region to region