Model site TRM acceptance activity Updates

Presented by: Siae Egypt

Cable running in tidy way Find TRM Layout

Option 1wal

Acceptance team

Waleed Abbas

17 December 2012

TRM cabinet Cable entrance is covered with black rubber to avoid sharp edge contact with cables.

Option 1wal The Connector On the top of the cabinet must be installed probably To be vertical ,Shrinked and labelled You can enlarge the opening of the cabinet using File ()

Acceptance team

Waleed Abbas

17 December 2012

Installation

Make a spare loop over the transmission cabinet and to be Tiewraped as Shown

Option 1wal

DDF Cables to be passed Under the ID

Acceptance team

Waleed Abbas

17 December 2012

Installation

IF Cable to installed as shown to run in the front of the cabinet

Option 1wal

In (1+1) links the IDUs power should be connected in different DDUs

Acceptance team

Waleed Abbas

17 December 2012

Labels must installed as shown

Screws Must be tighten well

Acceptance team

Waleed Abbas

17 December 2012

Earth Fixation Inside the cabinet

Option 1wal

Acceptance team

Waleed Abbas

17 December 2012

Indoor cable Running


RF Cable Must Not have any crosses

Option 1wal

Acceptance team

Waleed Abbas

17 December 2012

Mini Link outdoor label


Mini Link outdoor label is placed in 2 positions:
- Below RAU - Before Roxtec cable entrance

Option 1wal

Acceptance team

Waleed Abbas

17 December 2012

Mini Link outdoor label

Option 1wal

10

Acceptance team

Waleed Abbas

17 December 2012

Earth Fixation At the entrance

Option 1wal

11

Acceptance team

Waleed Abbas

17 December 2012

OUTDOOR Cable Tray


Outdoor cable tray Must Be Closed

Option 1wal

12

Acceptance team

Waleed Abbas

17 December 2012

outdoor Isolation
Connecting the earthig of the ODU Installation of Metal Label

Option 1wal

Outdoor Unit should be installed at the top or the bottom of the pole to allow installation of another ODU on the same Pole
13 Acceptance team

Waleed Abbas

17 December 2012

Mini Link outdoor Isolation


No Loops for outdoor earth Feeder Clamp on the Green Field Metal Tie wrap on the Rooftop

Option 1wal

14

Acceptance team

Waleed Abbas

17 December 2012

Rocxtick Entrance

Out side

Option 1wal

IF cable should be routed through separate Roxtec outlet.

In Side
Roxtec outlet is of the same size of the IF cable and closed properly on the cable.
15 Acceptance team

Waleed Abbas

17 December 2012

Mini Link outdoor label

Option 1wal

Label fixated with black outdoor tie rap

Induction for RAU: 1+0 punch 1

1+1 either punch 1 or 2 depending on RAU Position.

16

Acceptance team

Waleed Abbas

17 December 2012

Mini Link outdoor label punching tool


Punching tool: 1) 4.0 mm letter puncher 2) 4.0 number puncher 3) Hammer

Option 1wal

17

Acceptance team

Waleed Abbas

17 December 2012

How to punch site number?!!


Normal Site number HUB site

Option 1wal

Punch by letter puncher according to first 2 letters for MMU ID @ SF6 such as: Amerya HQ AE PTT HQPTT

Punching should be in straight line & tidy

Damietta Port DPPTT

18

Acceptance team

Waleed Abbas

17 December 2012

Mini Link outdoor label


1+ 0 Label 1+ 1 Label

Option 1wal

19

Acceptance team

Waleed Abbas

17 December 2012

Mini Link outdoor label

Option 1wal

20

Acceptance team

Waleed Abbas

17 December 2012

Mini Link outdoor label

Option 1wal

21

Acceptance team

Waleed Abbas

17 December 2012

TX power & Receiving Level

Option 1wal

Print Screen should contains (Power, receiving levels and connectivity ),

22

Acceptance team

Waleed Abbas

17 December 2012

Safety regulation
Safety regulations to be followed

Option 1wal

23

Acceptance team

Waleed Abbas

17 December 2012

Thanks
Option 1wal

24

Acceptance team

Waleed Abbas

17 December 2012