Professional Documents
Culture Documents
BSNL Phase II
BSNL Phase II
WiMAX in North India.As the speed of internet goes on a deflation while we move from the metro cities to small towns and further it goes very slow in the rural areas .To maintain the same speed of Internet in rural areas WiMAX is to be deployed by our company and the customer is BSNL . The WiMAX BTS will be deployed on the existing towers of BSNL.As of now the project is in the survey phase to check whether requirements of WiMAX BTS are available on the BSNL sites or not.
equipments in rural areas of North India. The project is in 2 phases South phase (already done) North phase ( on process)
To extend reach and coverage ,WiMAX purpose is to provide voice, video and data service requirements of customers. To extend wire free coverage to pockets with limited or no wire-line coverage. To provide IP services. For providing mobility to broadband users.
GEI
BNG
VLAN
ID
SWITCH
ASN /CSN
TX
WIMAX LINK
TOWER
SITE SURVEY
Site survey
1)
2) 3) 4)
5)
Check for basic Infra material like tower, specification of pole, presence of electricity. Existing Radiation Patterns (Height and diameter of Antenna, Microwave) . Space in the BS site, parabolic photo, cable length ,CPE survey ,LOS, place for CPE mounting. Making of site survey Report, with building , shelter , lay out diagrams. Pole at CPE and Tower extension at BS if required
5.
RF-Planning
We need ASSET Format of data. Height or projection values (WGS -84,42). UTM universal transverse mercator. Map info-RMSI(must be in Tab Format) which includes clutter , height ,places , roads airstrips etc. Coordinates (latt. and long. of BTS) Information about the BTS eg- height of Tower parameter signal strength power gain &power loss
Location of CPE.
Link feasibility.
SESSION SELECTION
TECHNOLOGY SELECTION
SITE DATABASE
Result of RF-Planning
1. 2. 3. 4.
5.
6.
Total Numbers of BS site Required. Optimum Location of BS site. Coverage Area of BS. No. of sector required per BTS. Customer site feasibility. Throughput required per CPE.
MAC QoS H-ARQ MBS Radio Resource Management Location Scheduling Ranging Security Handoff
BTS INSTALLATION
BATTERY INSTALLATION